This scheme may be cited as the M1 Motorway (Junctions 10 to 13 Improvement Connecting Roads) Scheme 2010 and shall come into force on 9 December 2010 .
資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk
The M1 Motorway (Junctions 10 to 13 Improvement Connecting Roads) Scheme 2010
In this Scheme:
(1) all measurements of distance are measured along the route of the relevant highway:
(2) —
(i) “connecting road” means a special road along a route described in the Schedule to this Scheme;
(ii) “the Motorway” means the existing M1 Motorway;
(iii) “the plan” means the plan folio numbered HA 16/MP/027, containing a site plan, marked “The M1 Motorway (Junctions 10 to 13 Improvement Connecting Roads) Scheme 20..”, signed by authority of the Secretary of State for Transport and deposited at Document Deposit Service, Communities and Local Government, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; and
(iv) “the special roads” means the Motorway and each connecting road.
The Secretary of State is authorised to provide the special roads for the exclusive use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the Highways Act 1980.
The centre line of each of the special roads is indicated by a heavy black line on the plan.
Each of the special roads shall become a trunk road on the date when this Scheme comes into force.
Cite this legislation
The M1 Motorway (Junctions 10 to 13 Improvement Connecting Roads) Scheme 2010 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-2010-2824
Contains public sector information licensed under the Open Government Licence v3.0.
本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com