(1) Subject to the provisions of this Order, the Board may in the lines and situations and upon the lands delineated on the deposited plans, sections and elevations and within the limits of deviation and according to the levels shown on the deposited plans, sections and elevations, construct and maintain the following works with all necessary connected works and conveniences—
Work No. 1 ─ A retaining wall to be constructed across the Wick Channel commencing at a point on the South Pier at TR3210840351from there proceeding in a straight line and terminating at a point on the North Pier at TR3222540347 and the infilling and reclamation of so much of the Wick Channel and Tidal Basin as lies behind that wall together with the infilling and reclamation of Granville Dock comprising in part, the site of Works Nos. 12, 18(A), 20, 21, 23, 24, 25, 26, 27, 28, 29, 30 and 31 and as to the remainder as hardstanding for the parking and marshalling of vehicles, the location of which is shown on sheet no. 2 and sections of which are shown on sheet no. 11.
Work No. 2 ─ A retaining wall to be constructed across the Hoverport apron commencing at a point on the North Pier at TR3224240362 from there proceeding in a straight line and terminating at a point on the Prince of Wales Pier at TR3232840489 and the raising and levelling of so much of the Hoverport apron as lies behind that wall comprising in part, the site of Work No. 10, 11 and 32 and as to remainder as hardstanding for the parking and marshalling of vehicles, the location of which is shown on sheet no. 2 and sections of which are shown on sheet no. 11.
Work No. 3 ─ A quay wall faced in part with wave attenuation materials extending into the bed of the Outer Harbour and incorporating part of the Prince of Wales Pier and enclosing an area of 4.5 hectares of the bed of the Outer Harbour commencing at a point on the foreshore of the Outer Harbour at TR3193540822, extending for a distance of 890 metres and terminating at a point on the Prince of Wales Pier at TR3257140336; the enclosed area comprising in part, the site of Works Nos. 7, 8, 9, 11 18(A) and 32 and as to the remainder as hardstanding for the parking and marshalling of vehicles, the location of which is shown on sheet no. 3 and sections of which are shown on sheet no. 12.
Work No. 4 ─ A pier partly of solid construction commencing by a junction with Work No. 3 at a point on that work at TR3240340590 extending for a distance of 330 metres in a north easterly direction into the Outer Harbour and terminating at a point at TR3268340766; comprising in part, the site of Works Nos. 38, 39 and 40; to be used on the south eastern side as a berth for ferry vessels and on the north western side in part as berths for tugs, dredgers and other large work boats and as to the remainder as a fuel berth for vessels comprising piled moorings with a pontoon system connected to that side of the proposed pier by a link bridge, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 13.
Work No. 4A ─ A pier partly of solid construction forming a spur off Work No. 4 commencing at a point on that work at TR3264840745 extending for a distance of 110 metres in a north westerly direction into the Outer Harbour and terminating at a point at TR3258940835 comprising in part, the site of Work No. 38; and including the relocation and reconstruction on the north west end of the proposed pier of the lighthouse from the east end of the Prince of Wales Pier, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 13.
Work No. 5 ─ A pier partly of solid construction commencing by a junction with Work No. 3 at a point on that work at TR3254540471 extending for a distance of 320 metres in a north easterly direction into the Outer Harbour and terminating at a point at TR3281240644, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 13.
Work No. 6 ─ The provision of sheet piled toe protection and abutments to support fenders on the south side of part of the Prince of Wales Pier and an elevated concrete deck (partly supported on those abutments) over part of the Prince of Wales Pier commencing at a point on the Prince of Wales Pier at TR3238540454 and extending for a distance of 290 metres along that pier and terminating at a point at TR3262240293; and the provision of a new roundhead at the eastern end of the remaining part of the Prince of Wales Pier, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 13.
Work No. 7 ─ Mechanically and hydraulically operated double deck bridgeworks with a stair and lift tower and elevated passenger walkway together with a series of dolphins forming a berthing and mooring line to provide access to and egress from vessels commencing at a point on Work No. 3 at TR3242640567 extending for a distance of 113 metres in a north easterly direction into the Outer Harbour and terminating at a point at TR3251940628, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 14.
Work No. 8 ─ Mechanically and hydraulically operated double deck bridgeworks with a stair and lift tower and elevated passenger walkway together with a series of dolphins forming a berthing and mooring line to provide access to and egress from vessels commencing at a point on Work No. 3 at TR3252040487 extending for a distance of 117 metres in a north easterly direction into the Outer Harbour and terminating at a point at TR3261840551, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 14.
Work No. 9 ─ Mechanically and hydraulically operated double deck bridgeworks with a stair and lift tower and elevated passenger walkway together with a series of dolphins forming a berthing and mooring line to provide access to and egress from vessels commencing at a point on Work No. 3 at TR3255040441 extending for a distance of 117 metres in a north easterly direction into the Outer Harbour and terminating at a point at TR3264840505, the location of which is shown on sheet no. 3 and the section of which is shown on sheet no. 14.
Work No. 10 ─ Mechanically and hydraulically operated double deck bridgeworks with a stair and lift tower and elevated passenger walkway together with a series of dolphins forming a berthing and mooring line to provide access to and egress from vessels commencing at a point on Work No. 2 at TR3231040478 extending for a distance of 125 metres in a south easterly direction into the Inner Harbour and terminating at a point at TR3241440407, the location of which is shown on sheet no. 3 and the section of which is shown on sheet nos. 14.
Work No. 11 ─ An elevated four lane road to be constructed on land forming part of the sites of Work Nos. 2 and 3 to provide egress from Work No. 3 commencing at a point on Work No. 2 at TR3221540396 and terminating at a point on Work No. 3 at TR3252140428, the location of which is shown on sheet no. 4 and sections of which are shown on sheet no. 15.
Work No. 12 ─ An elevated four lane road to be constructed on land forming part of the site of Work No. 1 to provide access to and egress from that Work commencing at a point at TR3176440508 and terminating at a point at TR3191740567, the location of which is shown on sheet no. 4 and sections of which are shown on sheet no. 16.
Work No. 13 ─ A marina comprising-
a pier of solid construction commencing on the foreshore of the Outer Harbour at a point at TR3195340856, extending for a distance of 532 metres in an easterly direction into the Outer Harbour and terminating at a point at TR3246440709 to be used in part as the site of Works Nos. 35, 36, and 37 and including the relocation and reconstruction on the western end of the pier of the Clock Tower and Clock Tower Building following the removal of that tower and building from the west end of the Prince of Wales Pier, the location of which is shown on sheet no. 5 and the section of which is shown on sheet no. 17; and
piled moorings with a pontoon system connected to the south face of that pier by a series of link bridges.
Work No. 14 ─ A retaining wall to be constructed at the Union Street end of the Wellington Dock commencing at a point on Commercial Quay at TR3186540850 from there proceeding in a straight line and terminating at a point on Esplanade Quay at TR3197840817 and the infilling and reclamation of the small portion of the Wellington Dock that lies behind that wall to be used as roadways for vehicles and footpaths for pedestrians, the location of which is shown on sheet no. 5 and section of which is shown on sheet no. 17.
Work No. 15 ─ A retaining wall commencing on the Spur Pier at a point at TR3212940270 from there extending in a straight line to a point at TR3211240282 from there extending in a straight line to a point at TR3211840290 from there extending in a straight line to a point at TR3209540306 and from there extending in a straight line and terminating at a point on the Dunkirk Jetty at TR3209440312 and the infilling and reclamation of so much of the Spur Pier Basin as lies behind that wall to provide hardstanding for a boatyard and the provision of an enclosed area of water with a boat hoist, the location of which is shown on sheet no. 2 and sections of which are shown on sheet no. 17.
Work No. 16 ─ A channel to be used by vessels navigating to and from the Wellington Dock commencing at a point on Esplanade Quay at TR3172140852 from there proceeding in a straight line and terminating at a point on the foreshore of the Outer Harbour at TR3184440815 having lock gates and an opening bridge over the channel, the location of which is shown on sheet no. 5 and the sections of which are shown on sheet no. 18.
Work No. 17 ─ An extension of solid construction of the Admiralty Pier commencing at a point at the eastern end of that pier at TR3303339948 and extending for a distance of 105 metres in an easterly direction and terminating at a point at TR3313839947 including the relocation and reconstruction on the east end of the proposed extension of the lighthouse following the removal of that lighthouse from the east end of the Admiralty Pier, the location of which is shown on sheet no. 6 and the section of which is shown on sheet no. 18.
Work No. 18 ─ Security fences comprising-
a fence to comply with TRANSEC requirements, intercepted by Works Nos. 11, 12, 23, 32 and 38, having a height not exceeding 3.25m to be constructed along the lines shown on sheet no. 7, and an elevation of which is shown on sheet no. 19, and
a fence (intercepted by a building comprising Work No.23) having a height not exceeding 2.75m to be constructed along the lines shown on sheet no. 8, and an elevation of which is shown on sheet no. 19.
Work No. 19 ─ The removal of the Prince of Wales roundabout and the construction in its place of an at grade signalised junction between Union Street, the A20 Snargate Street and the A20 Limekiln Street, the location of which is shown on sheet no. 9.
Work No. 20 ─ Six single storey buildings with a canopy over to be used for outbound border control and security checks, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 19.
Work No. 21 ─ A single storey building to be used for security checks of tourist vehicles and passengers, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 20.
Work No. 22 ─ A single storey building to be used for security checks of freight vehicles and occupants, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 20.
Work No. 23 ─ Seven single storey buildings with a canopy over to be used for security checks of outbound freight and tourist vehicles and bicycles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 21.
Work No. 24 ─ A single storey building to be used as a drivers’ reception facility, the location of which is shown on sheet no. 10 and the plans and elevations of which are shown on sheet no. 20.
Work No. 25 ─ A single storey building to be used for border control and security checks of tourist vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 20.
Work No. 26─ A single storey building to be used for border control and security checks of coach passengers, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 21.
Work No. 27 ─ A single storey building to be used for border control and security checks of tourist vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 22.
Work No. 28 ─ A single storey building to be used for border control and security checks of freight vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 20.
Work No. 29 ─ A single storey building to be used for border control and security checks of freight vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 21.
Work No. 30 ─ A single storey building to be used for scanning vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 22.
Work No. 31 ─ A single storey building for border control and security checks including the offloading of freight vehicles, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 23.
Work No. 32 ─ A double storey terminal building to be used for passenger and baggage handling, management offices and for the provision of retail, refreshments and toilet facilities for passengers and other members of the public, the location of which is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 23.
Work No. 33 ─ A single storey building to be used for the customs clearance of goods, the location of which is shown on sheet no.10 and the plan and elevations of which are shown on sheet no. 24.
Work No. 34 ─ A two storey building to be used as the machinery house and control room for the operation of the lock gates and opening bridge forming part of Work No. 16, the location of that building is shown on sheet no. 10 and the plan and elevations of which are shown on sheet no. 24.
Work No. 35 ─ A two storey building comprising a marina office, facilities for the users of the proposed marina (Work No. 13) and the general public to be constructed on the proposed pier comprising Work No. 13(A), the location of which is shown on sheet no. 5 and the plan and elevations of which are shown on sheet no. 24.
Work No. 36 ─ A two storey building comprising retail, refreshment and toilet facilities for members of the general public to be constructed on the proposed pier comprising Work No. 13(A), the location of which is shown on sheet no. 5 and the plan and elevations of which are shown on sheet no. 25.
Work No. 37 ─ A two storey building comprising facilities for use as a lifeboat station to be constructed on the proposed pier comprising Work No. 13(A), the location of which is shown on sheet no.5 and the plan and elevations of which are shown on sheet no.25.
Work No. 38 ─ A two storey building comprising a workshop, offices and stores to be constructed on the parts of the proposed piers comprising Works Nos. 4 and 4(A), the location of which is shown on sheet no.3 and the plan and elevations of which are shown on sheet no.25.
Work No. 39 ─ A single storey building to be used as an office and pump house to be constructed on the proposed pier comprising Work No. 4, the location of which is shown on sheet no. 3 and the plan and elevations of which are shown on sheet no. 25.
Work No. 40 – A two storey building and lifeboat davit to be used as a safety training facility to be constructed on the proposed pier comprising Work No. 4, the location of which is shown on sheet no. 3 and the plan and elevations of which are shown on sheet no. 25.
Work No. 41─ The removal of the existing York Street roundabout and the construction in its place of an at grade signalised junction between the A256 York Street, the A20 Townwall Street and the A20 Snargate Street, the location of which is shown on sheet no. 9.
(2) Subject to the provisions of this Order, the Board may, for the purposes of the works authorised by paragraph (1), demolish and remove any structures or apparatus and level any surface lying within the limits of deviation (including, and without prejudice to the generality of the foregoing, so much of the Prince of Wales Pier as may be deemed necessary or convenient) and enclose and reclaim so much of the bed of the harbour and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the undertaking.
(3) Subject to the provisions of this Order, the Board may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works and may maintain those works as so reconstructed, extended, enlarged, replaced or relaid.