This subpart shall govern the submission, consideration, and inclusion of projects into the Comprehensive Plan.
資料由法律人 LawPlayer整理提供·U.S. federal law / curated by LawPlayer from GPO govinfo & eCFR
RULES OF PRACTICE AND PROCEDURE
(a) The Comprehensive Plan shall be adopted, revised and modified as provided in Sections 3.2 and 13.1 of the Compact. It is the Commission's responsibility to adopt the Comprehensive Plan, after consultation with water users and interested public bodies, for the immediate and long-range development and uses of the water resources of the Basin. The Plan shall include the public and private projects and facilities which the Commission determines are required for the optimum planning, development, conservation, utilization, management and control of the water resources of the Basin to meet present and future needs. In addition to the included projects and facilities, the Comprehensive Plan consists of the statements of policies, and programs that the Commission determines are necessary to govern the proper development and use of the River Basin. The documents within the Comprehensive Plan expressing the Commission's policies and programs for the future, including the means for carrying them out, may be set forth through narrative text, maps, charts, schedules, budgets and other appropriate means.
(b) Specific projects and facilities and statements of policy and programs may be incorporated, deleted or modified from time to time to reflect changing conditions, research results and new technology. The degree of detail described in particular projects may vary depending upon the status of their development.
Projects of the federal agencies affecting the water resources of the Basin, subject to the limitations in Section 1.4 of the Compact, shall be governed by Section 11.1 of the Compact. Projects of the signatory states, their political subdivisions and public corporations affecting the water resources of the Basin, shall be governed by the provisions of Section 11.2 of the Compact.
(a) Applications for inclusion of new public projects and the deletion or alteration of previously included public projects may be submitted by signatory parties and agencies or political subdivisions thereof. Owners or sponsors of privately owned projects may submit applications for the inclusion of new private projects and the deletion or alteration of previously included private projects in which the applicant has an interest. The Commission may also receive and consider proposals for changes and additions to the Comprehensive Plan which may be submitted by any agency of the signatory parties, or any interested person, organization, or group. Any application or proposal shall be submitted in such form as may be required by the Executive Director to facilitate consideration by the Commission.
(b) Applications for projects shall include at least the following information:
(1) Purpose or purposes, including quantitative measures of physical benefit anticipated from the proposal;
(2) The location, physical features and total area required.
(3) Forecast of the cost or effect on the utilization of water resources;
(4) Relation to other parts of the existing Comprehensive Plan;
(5) A discussion of conformance with Commission policies included in the Comprehensive Plan; and
(6) A discussion of the alternatives considered.
Following staff study, examination, and review of each project application, the Commission shall hold a public hearing upon notice thereon as provided in paragraph 14.4(b) of the Compact and may take such action on a project application as it finds to be appropriate.
Proposals for changes and additions to the Comprehensive Plan submitted by any agency of the signatory parties or any interested person, organization or group shall identify the specific revision or change recommended. In order to permit adequate Commission consideration of any proposal, the Executive Director may require such additional information as may be needed. Review or consideration of such proposals shall be based upon the recommendation of the Executive Director and the further direction of the Commission.
The Commission will review the Comprehensive Plan in its entirety at least once every six years from the date of the initial adoption of the Comprehensive Plan (March 28, 1962). Such review may include consideration of proposals submitted by the signatory parties, agencies or political subdivision thereof or other interested parties. The amendments, additions, and deletions adopted by the Commission will be compiled and the Plan as so revised shall be made available for public inspection.
(a) After a project of any Federal, State, or local agency has been included in the Comprehensive Plan, no further action will be required by the Commission or by the agency to satisfy the requirements of Article 11 of the Compact, except as the Comprehensive Plan may be amended or revised pursuant to the Compact and this part. Any project which is materially changed from the project as described in the Comprehensive Plan will be deemed to be a new and different project for the purposes of Article 11 of the Compact. Whenever a change is made the sponsor shall advise the Executive Director, who will determine whether the change is deemed a material change within the meaning of this part.
(b) Any public project not having a substantial effect on the water resources of the Basin, as defined in subpart C of this part, may proceed without reference to Article 11 of the Compact.
The Comprehensive Plan shall be and remain in the custody of the Executive Director. The Plan, including all maps, charts, description and supporting data shall be and remain a public record open to examination during the regular business hours of the Commission, under such safeguards as the Executive Director may determine to be necessary to preserve and protect the Plan against loss, damage or destruction. Copies of the Comprehensive Plan or any part or parts thereof shall be made available by the Executive Director for public sale at a price covering the cost of production and distribution.
This subpart shall govern the submission, consideration and inclusion of projects into the Water Resources Program.
The Water Resources Program, as defined and described in section 13.2 of the Compact, will be a reasonably detailed amplification of that part of the Comprehensive Plan which the Commission recommends for action. That part of the Program consisting of a presentation of the water resource needs of the Basin will be revised only at such intervals as may be indicated to reflect new findings and conclusions, based upon the Commission's continuing planning programs.
The Water Resources Program will be prepared and considered by the Commission for adoption annually. Projects included in the Water Resources Program shall have been previously included in the Comprehensive Plan, except that a project may be added to both the Plan and the Program by concurrent action of the Commission. In such instances, the project's sponsor shall furnish the information listed in § 401.4(b) prior to the inclusion of the project in the Comprehensive Plan and Water Resources Program.
This subpart shall govern the submission and review of projects under Section 3.8 of the Delaware River Basin Compact.
Section 3.8 is intended to protect and preserve the integrity of the Comprehensive Plan. This section of the Compact provides:
“No project having a substantial effect on the water resources of the basin shall hereafter be undertaken by any person, corporation or governmental authority unless it shall have been first submitted to and approved by the Commission, subject to the provisions of Sections 3.3 and 3.5. The Commission shall approve a project whenever it finds and determines that such project would not substantially impair or conflict with the Comprehensive Plan and may modify and approve as modified, or may disapprove any such project whenever it finds and determines that the project would substantially impair or conflict with such Plan. The Commission shall provide by regulation for the procedure of submission, review and consideration of projects, and for its determinations pursuant to this section. Any determination of the Commission hereunder shall be subject to judicial review in any court of competent jurisdiction.”
The Executive Director is authorized and directed to enter into cooperative Administrative Agreements with federal and state regulatory agencies concerned with the review of projects under federal or state law as follows:
(a) To facilitate the submission and review of applications and the determinations required under Section 3.8 of the Compact;
(b) To avoid unnecessary duplication of staff functions and hearings required by law; and
(c) For such other and different purposes as he may deem feasible and advantageous for the administration of the Compact or any other law.
Any project which may have a substantial effect on the water resources of the Basin, except as provided in paragraph (d) of this section, shall be submitted to the Commission for a determination as to whether the project impairs or conflicts with the Comprehensive Plan, as follows:
(a) Where the project is subject to review by a state or federal agency which has entered into an Administrative Agreement with the Commission, such project will be referred to the Commission in accordance with the terms of the Administrative Agreement, and appropriate instructions will be prepared and issued by the Executive Director for guidance of project sponsors and applicants.
(b) Where no other state or federal agency has jurisdiction to review and approve a project, or no Administrative Agreement is in force, the project sponsor shall apply directly to the Commission.
(c) Any project proposal, which may have a substantial effect on the water resources of the Basin, may be received and reviewed by the staff informally in conference with the project sponsor during the preliminary planning phase to assist the sponsor to develop the project in accordance with the Commission's requirements.
(d) Whenever a project sponsored by one of the signatory parties, or by any agency, political subdivision or public corporation thereof, has been included in the Water Resources Program in the “A List” classification, the project, to the extent of such inclusion and as described in the Program, shall be deemed approved for the purposes of Section 3.8 of the Compact.
(e) Whenever a project is subject to review and approval by the Commission under this section, there shall be no substantial construction activity thereon, including related preparation of land, unless and until the project has been approved by the Commission; provided, however, that this prohibition shall not apply to the drilling of wells for purposes of obtaining geohydrologic data, nor to in-plant control and pretreatment facilities for pollution abatement.
(a) Except as the Commission may specially direct by notice to the project owner or sponsor, a project in any of the following classifications will be deemed not to have a substantial effect on the water resources of the Basin and is not required to be submitted under Section 3.8 of the Compact:
(1) The construction of new impoundments or the enlargement or removal of existing impoundments, for whatever purpose, when the storage capacity is less than 100 million gallons;
(2) A withdrawal from ground water when the daily average gross withdrawal during any 30 consecutive day period does not exceed 100,000 gallons;
(3) A withdrawal from impoundments or running streams for any purpose when the daily average gross withdrawal during any 30 consecutive day period does not exceed 100,000 gallons;
(4) The construction of new domestic sewage treatment facilities or alteration or addition to existing domestic sewage treatment facilities when the design capacity of such facilities is less than a daily average rate of 10,000 gallons per day in the drainage area to Outstanding Basin Waters and Significant Resource Waters or less than 50,000 gallons per day elsewhere in the Basin; and all local sewage collector systems and improvements discharging into authorized trunk sewage systems;
(5) The construction of new facilities or alteration or addition to existing facilities for the direct discharge to surface or ground waters of industrial wastewater having design capacity of less than 10,000 gallons per day in the drainage area to Outstanding Basin Waters and Significant Resource Waters or less than 50,000 gallons per day elsewhere in the Basin; except where such wastewater contains toxic concentrations of waste materials;
(6) A change in land cover on major ground water infiltration areas when the amount of land that would be altered is less than three square miles;
(7) Deepening, widening, cleaning or dredging existing stream beds or relocating any channel, and the placement of fill or construction of dikes, on streams within the Basin except the Delaware River and tidal portions of tributaries thereto, and streams draining more than one state;
(8) Periodic maintenance dredging;
(9) Encroachments on streams within the Basin caused by:
(i) Floating docks and anchorages and buoys and navigational aids;
(ii) Temporary construction such as causeways, cofferdams and falsework required to facilitate construction on permanent structures;
(10) Bridges and highways unless they would pass in or across an existing or proposed reservoir or recreation project area as designated in the Comprehensive Plan;
(11) Liquid petroleum products pipelines and appurtenances designed to operate under pressures less than 150 psi; local electric distribution lines and appurtenances; local communication lines and appurtenances; local natural and manufactured gas distribution lines and appurtenances; local water distribution lines and appurtenances; and local sanitary sewer mains, unless such lines would involve significant disturbance of ground cover affecting water resources;
(12) Electric transmission or bulk power system lines and appurtenances; major trunk communication lines and appurtenances; natural and manufactured gas transmission lines and appurtenances; major water transmission lines and appurtenances; unless they would pass in, on, under or across an existing or proposed reservoir or recreation project area as designated in the Comprehensive Plan; unless such lines would involve significant disturbance of ground cover affecting water resources;
(13) Liquid petroleum products pipelines and appurtenances designed to operate under pressures of more than 150 psi, unless they would pass in, on, under or across an existing or proposed reservoir or recreation project area as designated in the Comprehensive Plan, or in, on, under or across any stream within the Basin; unless such lines would involve significant disturbance of ground cover affecting water resources;
(14) Landfill projects, unless no state-level review and permit system is in effect; broad regional consequences are anticipated; or the standards or criteria used in state level review are not adequate to protect the water of the Basin for the purposes prescribed in the Comprehensive Plan;
(15) Draining, filling, or otherwise altering marshes or wetlands when the area affected is less than 25 acres; provided, however, that areas less than 25 acres shall be subject to Commission review and action where neither a state nor a Federal level review and permit system is in effect;
(16) The diversion or transfer of water from the Delaware River Basin (exportation) whenever the design capacity is less than a daily average rate of 100,000 gallons;
(17) The diversion or transfer of water into the Delaware River Basin (importation) whenever the design capacity is less than a daily average rate of 100,000 gallons except when the imported water is wastewater;
(18) The diversion or transfer of wastewater into the Delaware River Basin (importation) whenever the design capacity is less than a daily average rate of 50,000 gallons; and
(19) Temporary or short term projects determined to have non-substantial impact on the water resources of the Basin by the Executive Director.
(b) All other projects which have or may have a substantial effect on the water resources of the Basin shall be submitted to the Commission in accordance with this part for determination as to whether the project impairs or conflicts with the Comprehensive Plan. Among these are projects involving the following (except as provided in paragraph (a) of this section):
(1) Impoundment of water;
(2) Withdrawal of ground water;
(3) Withdrawal of water from impoundment or streams;
(4) Diversion of water into or out of the Basin;
(5) Deepening or widening of existing stream beds, channels, anchorages, harbors or tuning basins, or the construction of new or enlarged channels, anchorages, harbors or turning basins, or the dredging of the bed of any stream or lake and disposal of the dredged spoil, when the nature or location of the project would affect the quantity or quality of ground or surface waters, or fish and wildlife habitat;
(6) Discharge of pollutants into surface or ground waters of the Basin;
(7) Facilities designed to intercept and transport sewage to a common point of discharge; and pipelines and electric power and communication lines;
(8) Facilities for the direct discharge to surface or ground waters of industrial wastewater;
(9) Projects that substantially encroach upon the stream or upon the 100-year flood plain of the Delaware River or its tributaries;
(10) Change in land cover on major ground water infiltration areas;
(11) Hydroelectric power projects, including pumped storage projects;
(12) Projects or facilities of Federal, state and local agencies such as highways, buildings and other public works and improvements, affecting the water and related land resources of the Basin;
(13) Draining, filling or otherwise altering marshes or wetlands;
(14) Landfills and solid waste disposal facilities affecting the water resources of the Basin;
(15) State and local standards of flood plain regulation;
(16) Electric generating or cogenerating facilities designed to consumptively use in excess of 100,000 gallons per day of water during any 30-day period; and
(17) Any other project that the Commission may specially direct by notice to the project sponsor or land owner as having a potential substantial water quality impact on waters classified as Special Protection Waters.
(c) Regardless of whether expressly excluded from review by paragraph (a) of this section, any project or class of projects that in the view of the Commission could have a substantial effect on the water resources of the basin may, upon special notice to the project sponsor or landowner, be subject to the requirement for review under section 3.8 of the Compact.
Maximum feasible efficiency in the use of water is required on the part of water users throughout the Basin. Effective September 1, 1981 applications under Section 3.8 of the Compact for new water withdrawals subject to review by the Commission shall include and describe water-conserving practices and technology designed to minimize the use of water by municipal, industrial and agricultural users, as provided in this section.
(a) Applications for approval of new withdrawal from surface or ground water sources submitted by a municipality, public authority or private water works corporation whose total average withdrawals exceed one million gallons per day shall include or be in reference to a program prepared by the applicant consisting of the following elements:
(1) Periodic monitoring of water distribution and use, and establishment of a systematic leak detection and control program;
(2) Use of the best practicable water-conserving devices and procedures by all classes of users in new construction or installations, and provision of information to all classes of existing users concerning the availability of water-conserving devices and procedures; and
(3) A contingency plan including use priorities and emergency conservation measures to be instituted in the event of a drought or other water shortage condition. Contingency plans of public authorities or private water works corporations shall be prepared in cooperation with, and made available to, all municipalities in the area affected by the contingency plan, and shall be coordinated with any applicable statewide water shortage contingency plans.
(b) Programs prepared pursuant to paragraph (a) of this section shall be subject to any applicable limitations of public utility regulations of the signatory party in which the project is located.
(c) Applications for approval of new industrial or commercial water withdrawals from surface or ground water sources in excess of an average of one million gallons per day shall contain
(1) A report of the water-conserving procedures and technology considered by the applicant, and the extent to which they will be applied in the development of the project; and
(2) A contingency plan including emergency conservation measures to be instituted in the event of a drought or other water shortage. The report and contingency plan shall estimate the impact of the water conservation measures upon consumptive and non-consumptive water use by the applicant.
(d) Applications for approval of new agricultural irrigation water withdrawals from surface or ground water sources in excess of one million gallons per day shall include a statement of the operating procedure or equipment to be used by the applicant to achieve the most efficient method of application of water and to avoid waste.
(e) Reports, programs and contingency plans required under this section shall be submitted by the applicant as part of the permit application to the state agency having jurisdiction over the project, or directly to the Commission in those cases where the project is not subject to the jurisdiction of a state agency. State agencies having jurisdiction over a project that is subject to the provisions of this section shall determine the adequacy and completeness of the applicant's compliance with these requirements and shall advise the Commission of their findings and conclusions.
A project will be considered by the Commission under Section 3.8 of the Compact either before or after any other state or federal review, in accordance with the provisions of the Administrative Agreement applicable to such project.
Upon receipt of an application by any State or Federal agency for any project reviewable by the Commission under this part, if the project has not prior thereto been reviewed and approved by the Commission, such agency shall refer the project for review under section 3.8 of the Compact in such form and manner as shall be provided by Administrative Agreement.
(a) The Commission will rely on the appropriate agency in each state to review and regulate the potability of all public water supplies. Applications before the Commission should address the impact of the withdrawal, use and disposal of water on the water resources of the Basin.
(b) The Commission will rely on signatory party reviews as much as possible and generally the Commission will not review the performance standards of individual components of treatment processes but will require compliance with all policies in the Comprehensive Plan including all applicable Water Quality Standards.
(a) Submission constituting application. Where a project is subject to review under section 3.8 of the Compact, the submission shall be in accordance with such form of application as the Executive Director may prescribe and with such supporting documentation as the Executive Director may reasonably require for the administration of the provisions of the Compact. An application shall be deemed complete and the Commission's review of the application may commence upon submission of the completed form in accordance with paragraph (b) of this section, and payment of the applicable fee as set forth in § 401.43 together with all balances due the Commission, if any, by the applicant or any member of its corporate structure, for unpaid fees, penalties, or interest.
(b) Submission of applications. Application forms and accompanying submissions shall be filed in accordance with the filing instructions included on the application form.
(c) Availability of forms. Any person may obtain a copy of any form prescribed for use in paragraph (a) of this section on the Commission's website, https://www.drbc.gov.
(a) Whenever the Executive Director shall deem necessary, or upon request of the applicant, an informal conference may be scheduled to explain, supplement or review an application.
(b) In the event of an emergency requiring immediate action to protect the public interest or to avoid substantial and irreparable injury to any private person or property, and the circumstances do not permit a review, hearing and determination in the regular course of the regulations in this part, the Executive Director with the approval of the chairman of the Commission may issue an emergency certificate authorizing an applicant to take such action as the Executive Director may deem necessary and proper in the circumstances, pending review, hearing and determination by the Commission as otherwise required in this part.
(a) Extension (no material change) —(1) Term of approval; extension request. For any Commission approval not assigned an expiration date, the Commission's approval shall expire five years from the approval date unless prior thereto the Commission extends the approval for an additional period of up to five years, based upon a written request from the project sponsor accompanied by supporting documentation demonstrating that the following criteria have been met:
(i) No material changes to the project as approved are proposed;
(ii) The condition of the project site has not changed in a manner important to determining whether the project would substantially impair or conflict with the Commission's Comprehensive Plan;
(iii) The Commission's Comprehensive Plan has not changed in a manner important to determining whether the project would substantially impair or conflict with the Comprehensive Plan; and
(iv) The project sponsor is diligently pursuing the project as shown by its planning, construction or project operational activities, its project expenditures, its efforts to secure government approvals necessary for the project, or its active participation in appeals of government decisions on its applications for government approvals. The project sponsor is not required by this paragraph (a)(1)(iv) to conduct activities that it is not legally authorized to conduct or that it demonstrates would be unreasonable for it to conduct before obtaining all necessary final government approvals.
(2) Denial of extension request. Otherwise, the extension request shall be denied, and the project sponsor may apply for renewal of its approval under paragraph (b) of this section by a date to be established by the Commission. If the Commission denies the request for an extension pursuant to this section, the docket approval shall not be administratively continued automatically pursuant to paragraph (a)(5) of this section. The Commission may, however, in its discretion, administratively extend the docket approval in whole or in part for a period ending on or before the date on which the Commission renders a final decision on the sponsor's re-application under paragraph (b) of this section.
(3) Public notice. The Commission will publish notice of receipt of a request for extension under this paragraph (a) and will provide notice at least ten days prior to the date of a business meeting at which the Commissioners may act on such request.
(4) Public comment. An opportunity for written comment of at least ten days' length will be provided on a request for extension. The project sponsor will be afforded an opportunity to respond in writing to the comments received. A public hearing will be provided if three or more Commission members ask the Executive Director in writing to schedule one or vote during a public meeting of the Commission to provide one.
(5) Administrative continuance. A docket that is the subject of a request for extension under paragraph (a) of this section filed at least 90 days before the docket's expiration shall be administratively continued pending the Commission's final action on the request in the event that such action occurs after the otherwise effective date of termination under this section.
(6) Extensions no longer needed. If the activities authorized by a docket are limited to construction activities, an extension is no longer required once construction is complete; however, the expiration of the docket, including any approved extension, does not eliminate ongoing docket obligations expressly identified as such in the docket approval.
(b) Re-application (material change). If the Commission determines that the project sponsor has failed to demonstrate that no material changes to the project as approved are proposed and that the other criteria listed in paragraph (a)(1) of this section are satisfied, the project sponsor must apply for renewal and any necessary modification of its approval in accordance with the customary application procedure for any docket renewal or approval.
(c) Automatic termination of application. Any application that remains dormant (no proof of active pursuit of approvals) for a period of three years from date of receipt, shall be automatically terminated without further action of the Commission. Any renewed activity following that date will require submission of a new application.
(a) Purpose. The purpose of the One Permit Program set forth in this section is to provide the opportunity for the environmental agency and/or other administrative agency of a Signatory Party (“Signatory Party Agency”) and the Commission to coordinate and collaborate in the administration of a single process for the review and adjudication of projects. The One Permit Program allows the Signatory Party Agency and Commission to incorporate requirements and determinations of both entities in a single permit or other approval instrument, pursuant to a duly adopted Administrative Agreement under paragraph (d) of this section.
(b) Scope. This section applies to all projects that:
(1) Are reviewable under the Compact;
(2) Meet the thresholds for review set forth in § 401.35 of these Rules of Practice and Procedure;
(3) Are subject to review by a Signatory Party Agency under its own statutory authorities; and
(4) Are within regulatory programs that have been identified in a duly adopted Administrative Agreement between the Commission and a Signatory Party Agency under this section. For any project that requires an approval under the Compact that is outside the scope of the Signatory Party Agency's approval issued in accordance with an Administrative Agreement under this section, the project sponsor shall apply to the Commission in accordance with procedures established by the Commission.
(c) Regulatory programs. Regulatory programs eligible for administration under the One Permit Program may include but are not limited to those concerning: Basin discharges, Basin water withdrawals, and Basin flood plain requirements.
(d) Procedure. The categories of projects covered and the procedures for processing applications under the One Permit Program shall be set forth in one or more Administrative Agreements between the Commission and the Signatory Party Agency that have been adopted by the Commission following a duly noticed public hearing and are in form and substance acceptable to the Commission and the Signatory Party Agency, consistent with the following:
(1) Except as provided in paragraphs (b) and (e) of this section or in an Administrative Agreement that has been duly executed by the Commission and the Signatory Party Agency under this section, an application for initial approval, renewal or revision of any project subject to the One Permit Program shall be filed only with the Signatory Party Agency.
(2) To enable the Commission to compile and make available to the public a current list of pending applications for projects within the Basin subject to Commission jurisdiction, the Signatory Party Agency shall notify the Commission at least monthly of applications the Signatory Party has received during the preceding month that may be eligible for review under the One Permit Program.
(3) For those categories of projects identified in the Administrative Agreement as requiring Commission input, the Commission staff shall provide the Signatory Party Agency with such input, including where specified by the Administrative Agreement, a recommendation as to any conditions of approval that may be necessary or appropriate to include in the project review determination under Section 3.8 of the Compact as to those regulatory programs identified in an Administrative Agreement in accordance with paragraph (b) of this section.
(4) Unless the Signatory Party Agency disapproves the project or the Administrative Agreement provides for separate Commission action under Section 3.8 of the Compact, the Signatory Party Agency shall make the project review determination under Section 3.8 of the Compact, as specified in the Administrative Agreement, as to the regulatory program covered by the Signatory Party Agency's approval and include the determination and any associated conditions of approval within the permit or other approval instrument that it issues to the project sponsor. If in accordance with the applicable Administrative Agreement the determination under Section 3.8 of the Compact is made by the Commission, the Signatory Party Agency may include the determination together with any associated conditions of approval in its permit or other approval instrument covering the project.
(5) The Commission will maintain on its Web site a list of all projects being administered pursuant to the Program.
(e) Comprehensive Plan projects. Articles 11 and 13 of the Compact require certain projects to be included in the Comprehensive Plan. To add a project not yet included in the Comprehensive Plan, the project sponsor shall submit a separate application to the Commission. If following its review and public hearing the Commission approves the addition of the project to the Comprehensive Plan, the Commission's approval will include such project requirements as are necessary under the Compact and this part. All other project approvals that may be required from the Signatory Party Agency or the Commission under regulatory programs administered pursuant to this section may be issued through the One Permit Program. An application for renewal or modification of a project in the Comprehensive Plan that does not materially change the project may be submitted only to the Signatory Party Agency unless otherwise specified in the Administrative Agreement.
(f) Retention of Commission review and enforcement authorities. Notwithstanding any other provision of this section, any Commissioner or the Executive Director may designate for Commission review any project that is reviewable under the Compact. Nothing in this section shall limit the authority of the Commission to exercise its review authority under the Compact and applicable Commission regulations. Similarly, although Administrative Agreements executed pursuant to this section may include collaborative and cooperative compliance and enforcement procedures, nothing in this section shall limit the authority of the Commission to exercise its enforcement authority under the Compact and applicable regulations.
(g) Exhaustion of Signatory Party administrative remedies prerequisite to appeal. Before commencing an action in a court of appropriate jurisdiction challenging any final action taken by a Signatory Party Agency under this section, the appellant must first exhaust its administrative remedies under the law of the Signatory Party whose agency issued the decision at issue.
(h) Fees. The Commission shall establish and maintain a schedule of fees for any or all of the services it renders pursuant to this section. The applicable fee(s) for Commission services rendered pursuant to this section shall be those set forth in DRBC Resolution No. 2009-2 (available at http://www.nj.gov/drbc/library/documents/Res2009-2.pdf ) for the review and renewal of project approvals. Project sponsors shall pay such fees, if any, directly to the Commission in accordance with the current schedule and applicable rules.
(i) Effect of One Permit Program on Commission dockets. (1) Unless the Executive Director or Commission otherwise directs, if a docket holder submits, or has submitted, a timely application to a Signatory Party Agency for a project subject to review under an Administrative Agreement duly adopted under paragraph (d) of this section, the most recent docket for the project shall, upon expiration, be deemed administratively continued until final action is taken in accordance with paragraph (i)(2) of this section.
(2) Unless the Executive Director or Commission otherwise directs, upon a Signatory Party Agency's final action on an application for a project subject to the One Permit Program:
(i) Any existing or administratively continued docket for such project shall terminate as to all of its provisions and conditions that pertain to regulatory programs administered by the Signatory Party Agency under the Administrative Agreement (“the Covered Programs”); and
(ii) The docket shall continue in effect as to any provisions and conditions not pertaining only to Covered Programs, including, as applicable, the incorporation of the project in the Commission's Comprehensive Plan.
(j) Modification of rules of practice and procedure to conform to this section. Any project subject to review under an Administrative Agreement duly adopted under paragraph (d) of this section, shall be governed by this section and not §§ 401.4, 401.5, 401.6, 401.8, 401.34(a), (c) and (e), 401.37, 401.38 and 18 CFR part 401, subpart F, where they are inconsistent with the procedures provided in this section.
(k) No interference with Supreme Court decree. In accordance with Sections 3.3(a) and 3.5 of the Compact, nothing in this section shall grant the authority to any Signatory Party Agency to impair, diminish or otherwise adversely affect the diversions, compensating releases, rights, conditions, obligations and provisions for administration thereof provided in the United States Supreme Court decree in New Jersey v. New York, 347 U.S. 995 (1954) (“Decree”). Any such action shall be taken only by the Commission with the unanimous consent of the parties to the Decree or upon unanimous consent of the members of the Commission following a declaration of a state of emergency in accordance with Section 3.3(a) of the Compact.
(a) Purpose. The purpose of this section is to provide an adequate, stable and reliable stream of revenue to cover the cost of the Commission's regulatory program activities, an important means by which the Commission coordinates management of the shared water resources of the Basin. Activities to be covered by the fees include the review of applications for projects that are subject to review under the Delaware River Basin Compact and implementing regulations; and ongoing activities associated with such projects, including but not limited to, effluent and ambient monitoring, data analysis, hydrodynamic and water quality modeling, and coordination with state and federal agencies.
(b) Types of fees. The following types of fees are established by this section:
(1) Application fee. Except as set forth in paragraph (b)(1)(iii) of this section, the application fee shall apply to:
(i) Project requiring a DRBC-issued docket or permit. Any project that, in accordance with the Delaware River Basin Compact and DRBC regulations, requires a Commission-issued docket or permit, whether it be a new or existing project for which the Commission has not yet issued an approval or a project for which the renewal of a previous Commission approval is required.
(ii) Project requiring inclusion in the comprehensive plan. Any project that in accordance with section 11 or section 13.1 of the Delaware River Basin Compact and DRBC regulations must be added to the Comprehensive Plan (also, “Plan”). In addition to any new project required to be included in the Plan, such projects include existing projects that in accordance with section 13.1 of the Compact are required to be included in the Plan and which were not previously added to the Plan. Any existing project that is materially changed from the project as described in the Plan shall be deemed to be a new and different project for purposes of this section.
(iii) Exemptions. The application fee shall not apply to:
(A) Any project for which the Signatory Party Agency serves as lead under the One Permit Program rule (§ 401.42), unless such project must be added by the Commission to the Comprehensive Plan.
(B) Any project for which an agency, authority or commission of a signatory to the Compact is the primary sponsor. Projects sponsored by political subdivisions of the signatory states shall not be included in this exemption. For purposes of this section “political subdivisions” shall include without limitation municipalities, municipal utility authorities, municipal development corporations, and all other entities not directly under the budgetary and administrative control of the Commission's members.
(2) Annual monitoring and coordination fee. (i) Except as provided in paragraph (b)(2)(ii) of this section, an annual monitoring and coordination fee shall apply to each active water allocation or wastewater discharge approval issued pursuant to the Compact and implementing regulations in this part, regardless of whether the approval was issued by the Commission in the form of a docket, permit or other instrument, or by a Signatory Party Agency under the One Permit Program rule (§ 401.42).
(ii) For any withdrawal or diversion covered in part by a certificate of entitlement issued pursuant to §§ 420.31 and 420.32 of the water supply charges regulations (18 CFR part 420), the annual monitoring and coordination fee shall be based on the allocated amount, if any, in excess of the quantity specified in the entitlement.
(3) Alternative review fee. In instances where the Commission's activities and related costs associated with the review of an existing or proposed project are expected to involve extraordinary time and expense, an alternative review fee equal to the Commission's actual costs may be imposed. The Executive Director shall inform the project sponsor in writing when the alternative review fee is to be applied and may require advance payment in the amount of the Commission's projected costs. Instances in which the alternative review fee may apply include, but are not limited to, matters in which:
(i) DRBC staff perform a detailed pre-application review, including but not limited to the performance or review of modeling and/or analysis to identify target limits for wastewater discharges.
(ii) DRBC staff perform or review complex modeling in connection with the design of a wastewater discharge diffuser system.
(iii) DRBC manages a public process for which the degree of public involvement results in extraordinary effort and expense, including but not limited to, costs associated with multiple stakeholder meetings, special public hearings, and/or voluminous public comment.
(iv) DRBC conducts or is required to engage third parties to conduct additional analyses or evaluations of a project in response to a court order.
(4) Additional fees —(i) Emergency approval. A request for an emergency certificate under § 401.40 to waive or amend a docket condition shall be subject to a minimum fee in accordance with paragraph (e) of this section. An alternative review fee also may be charged in accordance with paragraph (b)(3) of this section.
(ii) Late filed renewal application. Any renewal application submitted fewer than 180 calendar days in advance of the expiration date or after such other date specified in the docket or permit or letter of the Executive Director for filing a renewal application shall be subject to a late filed renewal application charge in excess of the otherwise applicable fee.
(iii) Modification of a DRBC approval. Following Commission action on a project, any material change to the project as approved shall require an additional application and accompanying fee. Such fee shall be calculated in accordance with paragraph (e) of this section and may be subject to an alternative review fee in accordance with paragraph (b)(3) of this section.
(iv) Name change or change of ownership. Each project with a docket or permit issued by the DRBC will be charged an administrative fee as set forth in paragraph (e) of this section if it undergoes a change in name or a “change in ownership” as that term is defined at § 420.31(e)(2) of this subchapter.
(v) Change of ownership. Each project that undergoes a “change in ownership” as that term is defined at 18 CFR 420.31(e)(2) will be charged an administrative fee as set forth in paragraph (e) of this section.
(c) Indexed adjustment. On July 1 of every year, beginning July 1, 2017, all fees established by this section will increase commensurate with any increase in the annual April 12-month Consumer Price Index (CPI) for Philadelphia, published by the U.S. Bureau of Labor Statistics during that year.
1
In any year in which the April 12-month CPI for Philadelphia declines or shows no change, the application fee and annual monitoring and coordination fee will remain unchanged. Following any indexed adjustment made under this paragraph (c), a revised fee schedule will be published in the Federal Register by July 1 and posted on the Commission's website. Interested parties may also obtain the fee schedule by contacting the Commission directly during business hours.
1 Consumer Price Index—U/Series ID: CUURA102SA0/Not Seasonally Adjusted/Area: Philadelphia-Wilmington-Atlantic City, PA-NJ-DE-MD/Item: All items/Base Period: 1982-84=100.
(d) Late payment charge. When any fee established by this section remains unpaid 30 calendar days after the payment due date provided on the Commission's invoice, an incremental charge equal to 2% of the amount owed shall be automatically assessed. Such charge shall be assessed every 30 days thereafter until the total amount owed, including any late payment charges has been paid in full.
(e) Fee schedules. The fees described in this section shall be as follows:
Table 1 to § 401.43—Docket Application Filing Fee
Project type
Docket application fee
Fee maximum
Water Allocation
$526 per million gallons/month of allocation, 1 not to exceed $19,724 1
Fee is doubled for any portion to be exported from the basin
Greater of: $19,724 1 or Alternative Review Fee.
Wastewater Discharge
Private projects: $1,315 1
Public projects: $657 1
Alternative Review Fee.
Other
0.4% of project cost up to $10,000,000 plus 0.12% of project cost above $10,000,000 (if applicable), not to exceed $98,618. 1
Greater of: $98,618 1 or Alternative Review Fee.
1 Subject to annual adjustment in accordance with paragraph (c) of this section.
Table 2 to § 401.43—Annual Monitoring and Coordination Fee
Annual fee
Allocation
Water
1 $394
<4.99 mgm.
Allocation
1 592
5.00 to 49.99 mgm.
1 855
50.00 to 499.99 mgm.
1 1,085
500.00 to 9,999.99 mgm.
1 1,315
> or = to 10,000 mgm.
Annual fee
Discharge design capacity
Wastewater Discharge
1 394
<0.05 mgd.
1 802
0.05 to 1 mgd.
1 1,078
1 to 10 mgd.
1 1,315
>10 mgd.
1 Subject to annual adjustment in accordance with paragraph (c) of this section.
Table 3 to § 401.43—Additional Fees
Proposed action
Fee
Fee maximum
Emergency Approval Under 18 CFR 401.40
$5,000
Alternative Review Fee.
Late Filed Renewal Surcharge
$2,000
Modification of a DRBC Approval
At Executive Director's discretion, Docket Application Fee for the appropriate project type
Alternative Review Fee.
Name change
1 $1,315
Change of Ownership
1 $1,972
1 Subject to annual adjustment in accordance with paragraph (c) of this section.
This subpart shall apply to the review, hearing and decision of objections and issues arising as a result of administrative actions and decisions taken or rendered by the Executive Director under the Compact and the regulations in this chapter. Any hearings shall be conducted pursuant to the provisions of subpart F of this part.
The Executive Director shall serve notice of an action or decision by him under the regulations in this chapter by personal service or certified mail, return receipt requested. The affected discharger shall be entitled (and the notice of action or decision shall so state) to show cause at a Commission hearing why such action or decision should not take effect. A request for such a hearing shall be filed with the Secretary of the Commission not more than 30 days after service of the Executive Director's determination. Failure to file such a request within the time limit shall be deemed to be an acceptance of the Executive Director's determination and a waiver of any further hearing.
(a) A request for a hearing may be informal but shall indicate the name of the individual and the address to which an acknowledgment may be directed. It may be stated in such detail as the objector may elect. The request shall be deemed filed only upon receipt by the Commission.
(b) Whenever the Executive Director determines that the request for a hearing is insufficient to identify the nature and scope of the objection, or that one or more issues may be resolved, reduced or identified by such action, he may require the objector to prepare and submit to the Commission, within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in writing served upon the objector by certified mail, return receipt requested, addressed to the person or entity filing the request for hearing at the place indicated in the request.
(a) Generally. A request for a report under this subpart may require such information and the answers to such questions as may be reasonably pertinent to the subject of the action or determination under consideration.
(b) Waste loading. In cases involving objections to an allocation of the assimilative capacity of a stream, wasteload allocation for a point source, or load allocation for a new point source, the report shall be signed and verified by a technically qualified person having personal knowledge of the facts stated therein, and shall include such of the following items as the Executive Director may require:
(1) A specification with particularity of the ground or grounds for the objection; and failure to specify a ground for objection prior to the hearing shall foreclose the objector from thereafter asserting such a ground at the hearing;
(2) A description of industrial processing and waste treatment operational characteristics and outfall configuration in such detail as to permit an evaluation of the character, kind and quantity of the discharges, both treated and untreated, including the physical, chemical and biological properties of any liquid, gaseous, solid, radioactive, or other substance composing the discharge in whole or in part;
(3) The thermal characteristics of the discharges and the level of heat in flow;
(4) Information in sufficient detail to permit evaluation in depth of any in-plant control or recovery process for which credit is claimed;
(5) The chemical and toxicological characteristics including the processes and/or indirect discharges which may be the source of the chemicals or toxicity;
(6) An analysis of all the parameters that may have an effect on the strength of the waste or impinge upon the water quality criteria set forth in the regulations in this chapter, including a determination of the rate of biochemical oxygen demand and the projection of a first-stage carbonaceous oxygen demand;
(7) Measurements of the waste as closely as possible to the processes where the wastes are produced, with the sample composited either continually or at frequent intervals (one-half hour or, where permitted by the Executive Director, one hour periods), so as to represent adequately the strength and volume of waste that is discharged; and
(8) Such other and additional specific technical data as the Executive Director may reasonably consider necessary and useful for the proper determination of a wasteload allocation.
No person shall be required in such report to divulge trade secrets or secret processes. All information disclosed to any Commissioner, agent or employee of the Commission in any report required by this part shall be confidential for the purposes of Section 1905 of Title 18 of the United States Code which provides:
Whoever, being an officer or employee of the United States or of any department or agency thereof, publishes, divulges, discloses, or makes known in any manner or to any extent not authorized by law any information coming to him in the course of his employment or official duties or by reason of any examination or investigation made by, or return, report or record made to or filed with, such department or agency or officer or employee thereof, which information concerns or relates to the trade secrets, processes, operations, style of work, or apparatus, or to the identity, confidential statistical data, amount or source of any income, profits, losses, or expenditures of any person, firm, partnership, corporation or association; or permits any income return or copy thereof to be seen or examined by any persons except as provided by law; shall be fined not more than $1,000 or imprisoned not more than one year, or both; and shall be removed from office or employment. June 25, 1948, C.645, 62 Stat. 791.
The Executive Director may, upon five days' notice to the objector dismiss the request for a hearing as to any objector who fails to file a complete report within such time as shall be prescribed in the Director's notice.
Whenever the Executive Director deems it appropriate, he may cause an informal conference to be scheduled between an objector and such member of the Commission staff as he may designate. The purpose of such a conference shall be to resolve or narrow the ground or grounds of the objections.
Following such informal conferences as may be held, to the extent that the same or similar grounds for objections are raised by one or more objectors, the Executive Director may in his discretion and with the consent of the objectors, cause a consolidated hearing to be scheduled at which two or more objectors asserting that ground may be heard.
(a) Scope of subpart. This subpart shall apply to contested cases required to be held under subparts C and E of this part, to the conduct of other administrative hearings involving contested cases and to proceedings which Commission regulation or the Commission directs be conducted pursuant to this subpart.
(b) Definition of contested case. “Contested case” means a proceeding in which the legal rights, duties, obligations, privileges, benefits or other legal relations of specific parties are involved. Such a proceeding may involve personnel matters, project applications and docket decisions but shall not extend to the review of any proposed or adopted rule or regulation of the Commission.
(c) Requests for hearings. Any person seeking a hearing to review the action or decision of the Commission or the Executive Director may request a hearing pursuant to the provisions of this subpart provided such a request is received by the Commission within thirty (30) days of the action or decision which is the subject of the requested hearing. Requests shall be submitted in writing to the Secretary of the Commission and shall identify the specific action or decision for which a hearing is requested, the date of the action or decision, the interest of the person requesting the hearing in the subject matter of the proposed hearing and a summary statement setting forth the basis for objecting to or seeking review of the action or decision. Any request filed more than thirty days after an action or decision will be deemed untimely and such request for a hearing shall be considered denied unless the Commission by unanimous vote otherwise directs. Receipt of requests for hearings, pursuant to this subpart, whether timely filed or not, shall be submitted by the Secretary to the Commissioners for their information.
(d) Optional joint hearings. Whenever designated by a department, agency or instrumentality of a signatory party, and within any limitations prescribed by the designation, a Hearing Officer designated pursuant to this subpart may also serve as a Hearing Officer, examiner or agent pursuant to such additional designation and may conduct joint hearings for the Commission and for such other department, agency or instrumentality. Pursuant to the additional designation, a Hearing Officer shall cause to be filed with the department, agency or instrumentality making the designation, a certified copy of the transcript of the evidence taken before him and, if requested, of his findings and recommendations. Neither the Hearing Officer nor the Delaware River Basin Commission shall have or exercise any power or duty as a result of such additional designation to decide the merits of any matter arising under the separate laws of a signatory party (other than the Delaware River Basin Compact).
(e) Schedule. The Executive Director shall cause the schedule for each hearing to be listed in advance upon a “hearing docket” which shall be posted in public view at the office of the Commission.
(f) Notice of hearing. Notice of any hearing to be conducted pursuant to this subpart shall comply with the provisions of Section 14.4(b) of the Compact relating to public notice unless otherwise directed by the Commission.
(a) Written requests for hearings. Upon receipt of a written request for a hearing pursuant to this subpart, the Executive Director shall review the record available with regard to the action or decision for which a hearing is requested. Thereafter, the Executive Director shall present the request for a hearing to the Commission for its consideration. The Commission shall grant a request for a hearing pursuant to this subpart if it determines that an adequate record with regard to the action or decision is not available, the contested case involves a determination by the Executive Director or staff which requires further action by the Commission or that the Commission has found that an administrative hearing is necessary or desirable. If the Commission denies any request for a hearing in a contested case, the party seeking such a hearing shall be limited to such remedies as may be provided by the Compact or other applicable law or court rule.
(b) Commission directed hearings. This subpart shall be applicable to any proceeding which Commission regulation or the Commission directs be conducted in accordance with the provisions, of this subpart.
(a) Generally. Hearings shall be conducted by one or more members of the Commission, by the Executive Director, or by such other Hearing Officer as the Chairman may designate, except as provided in paragraph (b) of this section.
(b) Wasteload allocation cases. In cases involving the allocation of the assimilative capacity of a stream:
(1) The Executive Director shall appoint a hearing board of at least two persons. One of them shall be nominated by the water pollution control agency of the state in which the discharge originates, and he shall be chairman. The board shall have and exercise the powers and duties of a Hearing Officer;
(2) A quorum of the board for purposes of the hearing shall consist of two members; and
(3) Questions of practice or procedure during the hearing shall be determined by the Chairman.
(a) Participation in the hearing. In any hearing, the person requesting the hearing shall be deemed an interested party and shall be entitled to participate fully in the hearing procedure. In addition, any person whose legal rights may be affected by the decision rendered in a contested case shall be deemed an interested party. Interested parties shall have the right to be represented by counsel, to present evidence and to examine and cross-examine witnesses. In addition to interested parties, any persons having information concerning a contested case or desiring to present comments concerning the subject matter of the Hearing for inclusion in the record may submit a written statement to the Commission. Any interested party may request the right to examine or cross-examine any person who submits a written statement. In the absence of a request for examination of such person, all written statements submitted shall be included within the record and such statements may be relied upon to the extent determined by the Hearing Officer or the Commission.
(b) Powers of the Hearing Officer. The Hearing Officer shall:
(1) Rule upon offers of proof and the admissibility of evidence, regulate the course of the hearings, hold conferences for the settlement or simplification of procedures or issues, and shall schedule submission of documents, briefs and the time for the hearing.
(2) Cause each witness to be sworn or to make affirmation.
(3) Limit the number of times any witness may testify, limit repetitious examination or cross-examination of witnesses or the extent to which corroborative or cumulative testimony shall be accepted.
(4) Exclude irrelevant, immaterial or unduly repetitious evidence, but the interested parties shall not be bound by technical rules of evidence and all relevant evidence of reasonably probative value may be received.
(5) Require briefs and oral arguments to the extent determined necessary which shall be included as part of the record unless otherwise ordered by the Hearing Officer.
(a) Presentation on behalf of the Commission. The Executive Director shall arrange for the presentation of testimony by the Commission's technical staff and other experts, as he may deem necessary or desirable, to incorporate in the record or support the administrative action, determination or decision which is the subject of the hearing.
(b) Expert witnesses. An interested party may submit in writing to the Hearing Officer the report and proposed testimony of an expert witness. No expert report or proposed testimony, however, shall be included in the record if the expert is not available for examination unless the report and proposed testimony shall have been provided to the Commission and all interested parties prior to the hearing and the Commission and interested parties have waived the right of cross-examination.
(c) The Executive Director may designate for inclusion in the record those records of the Commission which the Executive Director deems relevant to a decision in a contested case or to provide an understanding of applicable Commission policies, regulations or other requirements relating to the issues in the contested case. The designation of such Commission documents shall be provided to all interested parties prior to the hearing.
A record of the proceedings and evidence at each hearing shall be made by a qualified stenographer designated by the Executive Director. Where demanded by the applicant, objector, or any other person who is a party to these proceedings, or where deemed necessary by the Hearing Officer, the testimony shall be transcribed. In those instances where a transcript of proceedings is made, two copies shall be delivered to the Commission. The applicant, objector, or other persons who desire copies shall obtain them from the stenographer at such price as may be agreed upon by the stenographer and the person desiring the transcript.
(a) Whenever a hearing is conducted under this subpart, the costs thereof, as defined in this subpart, shall be assessed by the Hearing Officer to the party requesting the hearing unless apportioned between the interested parties where cost sharing is deemed fair and equitable by the Hearing Officer. For the purposes of this section costs include all incremental costs incurred by the Commission, including, but not limited to, hearing examiner and expert consultants reasonably necessary in the matter, stenographic record, rental of a hearing room and other related expenses.
(b) Upon scheduling of a matter for hearing, the Secretary shall furnish to the applicant and/or interested parties a reasonable estimate of the costs to be incurred under this section. The applicant and/or interested parties may be required to furnish security for such costs either by cash deposit or by a surety bond of a corporate surety authorized to do business in a signatory state.
(c) An appeal of the assessment of costs may be submitted in writing to the Commission within ten (10) days of the assessment. A copy of the appeal shall be filed with the Secretary and served on all interested parties. The filing of said appeal shall not stay the Hearing.
(a) The Hearing Officer shall prepare a report of his findings and recommendations. In the case of an objection to a waste load allocation, the Hearing Officer shall make specific findings of a recommended allocation which may increase, reduce or confirm the Executive Director's determination. The report shall be served by personal service or certified mail (return receipt requested) upon each party to the hearing or its counsel unless all parties have waived service of the report. The applicant and any objector may file objections to the report within 20 days after the service upon him of a copy of the report. A brief shall be filed together with any objections. The report of the Hearing Officer together with objections and briefs shall be promptly submitted to the Commission. The Commission may require or permit oral argument upon such submission prior to its decision.
(b) The Executive Director, in addition to any submission to the Hearing Officer, may also submit to the Commission staff comments upon, or a response to, the Hearing Officer's findings and report and, where appropriate, a draft docket or other recommended Commission action. Interested parties shall be served with a copy of such submission and may have not less than ten (10) days to respond before action by the Commission.
(a) The Commission will act upon the findings and recommendations of the Hearing Officer pursuant to law.
(b) Commission Counsel shall assist the Commission with its review of the hearing record and the preparation of a Commission decision to the extent directed to do so by the Chairman.
(c) The determination of the Commission will be in writing and shall be filed together with any transcript of the hearing, report of the Hearing Officer, objections thereto, and all plans, maps, exhibits and other papers, records or documents relating to the hearing. All such records, papers and documents may be examined by any person at the office of the Commission, and shall not be removed therefrom except temporarily upon the written order of the Secretary after the filing of a receipt therefor in form prescribed by the Secretary. Copies of any such records and papers may be made in the office of the Commission by any person, subject to such reasonable safeguards for the protection of the records as the Executive Director may require.
Any party participating in a hearing conducted pursuant to the provisions of this subpart may appeal any final Commission action. To be timely, such an appeal must be filed with an appropriate federal court, as provided in Article 15.1(p) of the Commission's Compact, within forty-five (45) days of final Commission action.
This subpart shall be applicable where the Commission shall have information indicating that a person has violated or attempted to violate any provision of the Commission's Compact or any of its rules, regulations or orders (hereafter referred to as possible violator). For the purposes of this subpart, person shall include person, partnership, corporation, business association, governmental agency or authority.
Upon direction of the Commission the Executive Director shall, and in all other instances, the Executive Director may require a possible violator to show cause before the Commission why a penalty should not be assessed in accordance with the provisions of these rules and section 14.17 of the Compact. The notice to the possible violator shall:
(a) Set forth the date on which the possible violator shall respond; and
(b) Set forth any information to be submitted or produced by the possible violator.
(a) Written submission. In addition to the information required by the Commission, any possible violator shall be entitled to submit in writing any other information that it desires to make available to the Commission before it shall act. The Executive Director may require documents to be certified or otherwise authenticated and statements to be verified. The Commission may also receive written submissions from any other persons as to whether a violation has occurred and the adverse consequences resulting from a violation of the Commission's Compact or its rules, regulations and orders.
(b) Presentation to the Commission. At the date set in the Notice, the possible violator shall have the opportunity to supplement its written presentation before the Commission by any oral statement it wishes to present and shall be prepared to respond to any questions from the Commission or its staff or to the statements submitted by persons affected by the possible violation.
(a) An adjudicatory hearing, which may be in lieu of or in addition to proceedings pursuant to § 401.93 at which testimony may be presented and documents received shall not be scheduled unless:
(1) The Executive Director determines that a hearing is required to have an adequate record for the Commission; or
(2) The Commission directs that such a hearing be held.
(b) If an adjudicatory hearing is scheduled, the possible violator shall be given at least 14 days written notice of the hearing date unless waived by consent. Notice of such a hearing may be given to the general public and the press in the manner provided in section 14.4(b) of the Compact but may be waived by the Executive Director.
(c) Except to the extent inconsistent with the provisions of this subpart adjudicatory hearings shall be conducted in accordance with the provisions of §§ 491.83 through 401.88 (including § 401.86 et seq. ).
The Executive Director may recommend to the Commission the amount of the penalty to be imposed. Such a recommendation shall be in writing and shall set forth the basis for the penalty amount proposed. Based upon the record submitted to the Commission, the Commission shall decide whether a violation has occurred that justifies the imposition of a penalty pursuant to § 14.17 of the Compact. If it is found that such a violation has occurred, the Commission shall determine the amount of the penalty to be paid.
(a) Consideration shall be given to the following factors in deciding the amount of any penalty or any settlement in lieu of penalty:
(1) Previous violation, if any, of the Commission's Compact and regulations;
(2) Whether the violation was unintentional or willful and deliberate;
(3) Whether the violation caused adverse environmental consequences and the extent of any harm;
(4) The costs incurred by the Commission or any signatory party relating to the failure to comply with the Commission's Compact and regulations;
(5) The extent to which the violator has cooperated with the Commission in correcting the violation and remediating any adverse consequences or harm that resulted therefrom; and
(6) Whether the failure to comply with the Commission's Compact and regulations was economically beneficial to the violator.
(b) The Commission retains the right to waive any penalty or reduce the amount of the penalty should it determine that, after consideration of the factors in paragraph (a) of this section, extenuating circumstances justify such action.
Any penalty imposed by the Commission shall be paid within 30 days or such further time period as shall be fixed by the Commission. The Executive Director and Commission counsel are authorized to take such action as may be necessary to assure enforcement of this subpart. If a proceeding before a court becomes necessary, the action of the Commission in determining a penalty amount shall constitute the penalty amount recommended by the Commission to be fixed by the court pursuant to § 14.17 of the Compact.
Cite this law
RULES OF PRACTICE AND PROCEDURE (U.S.C.). Retrieved via LawPlayer, https://lawplayer.com/us/act/cfr-title-18-part-401
United States government works (U.S. Code, Code of Federal Regulations) are in the public domain under 17 U.S.C. § 105.