§ 250.101Authority and applicability.

The Secretary of the Interior (Secretary) authorized the Bureau of Safety and Environmental Enforcement (BSEE) to regulate oil, gas, and sulphur exploration, development, and production operations on the Outer Continental Shelf (OCS). Under the Secretary's authority, the Director requires that all operations:

(a) Be conducted according to the OCS Lands Act (OCSLA), the regulations in this part, BSEE orders, the lease or right-of-way, and other applicable laws, regulations, and amendments; and

(b) Conform to sound conservation practice to preserve, protect, and develop mineral resources of the OCS to:

(1) Make resources available to meet the Nation's energy needs;

(2) Balance orderly energy resource development with protection of the human, marine, and coastal environments;

(3) Ensure the public receives a fair and equitable return on the resources of the OCS;

(4) Preserve and maintain free enterprise competition; and

(5) Minimize or eliminate conflicts between the exploration, development, and production of oil and natural gas and the recovery of other resources.

§ 250.102What does this part do?

(a) This part 250 contains the regulations of the BSEE Offshore program that govern oil, gas, and sulphur exploration, development, and production operations on the OCS. When you conduct operations on the OCS, you must submit requests, applications, and notices, or provide supplemental information for BSEE approval.

(b) The following table of general references shows where to look for information about these processes.

For information about . . .

Refer to . . .

(1) Applications for permit to drill,

30 CFR part 250, subpart D.

(2) Development and Production Plans (DPP),

30 CFR part 550, subpart B.

(3) Downhole commingling,

30 CFR part 250, subpart K.

(4) Exploration Plans (EP),

30 CFR part 550, subpart B.

(5) Flaring,

30 CFR part 250, subpart K.

(6) Gas measurement,

30 CFR part 250, subpart L.

(7) Off-lease geological and geophysical permits,

30 CFR part 551.

(8) Oil spill financial responsibility coverage,

30 CFR part 553.

(9) Oil and gas production safety systems,

30 CFR part 250, subpart H.

(10) Oil spill response plans,

30 CFR part 254.

(11) Oil and gas well-completion operations,

30 CFR part 250, subpart E.

(12) Oil and gas well-workover operations,

30 CFR part 250, subpart F.

(13) Decommissioning Activities,

30 CFR part 250, subpart Q.

(14) Platforms and structures,

30 CFR part 250, subpart I.

(15) Pipelines and Pipeline Rights-of-Way,

30 CFR part 250, subpart J and 30 CFR part 550, subpart J.

(16) Sulphur operations,

30 CFR part 250, subpart P.

(17) Training,

30 CFR part 250, subpart O.

(18) Unitization,

30 CFR part 250, subpart M.

(19) Safety and Environmental Management Systems (SEMS),

30 CFR part 250, subpart S.

§ 250.103Where can I find more information about the requirements in this part?

BSEE may issue Notices to Lessees and Operators (NTLs) that clarify, supplement, or provide more detail about certain requirements. NTLs may also outline what you must provide as required information in your various submissions to BSEE.

§ 250.104How may I appeal a decision made under BSEE regulations?

To appeal orders or decisions issued under BSEE regulations in 30 CFR parts 250 to 282, follow the procedures in 30 CFR part 290.

§ 250.105Definitions.

Terms used in this part will have the meanings given in the Act and as defined in this section:

Act means the OCS Lands Act, as amended (43 U.S.C. 1331 et seq. ).

Affected State means with respect to any program, plan, lease sale, or other activity proposed, conducted, or approved under the provisions of the Act, any State:

(1) The laws of which are declared, under section 4(a)(2) of the Act, to be the law of the United States for the portion of the OCS on which such activity is, or is proposed to be, conducted;

(2) Which is, or is proposed to be, directly connected by transportation facilities to any artificial island or installation or other device permanently or temporarily attached to the seabed;

(3) Which is receiving, or according to the proposed activity, will receive oil for processing, refining, or transshipment that was extracted from the OCS and transported directly to such State by means of vessels or by a combination of means including vessels;

(4) Which is designated by the Secretary as a State in which there is a substantial probability of significant impact on or damage to the coastal, marine, or human environment, or a State in which there will be significant changes in the social, governmental, or economic infrastructure, resulting from the exploration, development, and production of oil and gas anywhere on the OCS; or

(5) In which the Secretary finds that because of such activity there is, or will be, a significant risk of serious damage, due to factors such as prevailing winds and currents to the marine or coastal environment in the event of any oil spill, blowout, or release of oil or gas from vessels, pipelines, or other transshipment facilities.

Air pollutant means any airborne agent or combination of agents for which the Environmental Protection Agency (EPA) has established, under section 109 of the Clean Air Act, national primary or secondary ambient air quality standards.

Analyzed geological information means data collected under a permit or a lease that have been analyzed. Analysis may include, but is not limited to, identification of lithologic and fossil content, core analysis, laboratory analyses of physical and chemical properties, well logs or charts, results from formation fluid tests, and descriptions of hydrocarbon occurrences or hazardous conditions.

Ancillary activities mean those activities on your lease or unit that you:

(1) Conduct to obtain data and information to ensure proper exploration or development of your lease or unit; and

(2) Can conduct without Bureau of Ocean Energy Management (BOEM) approval of an application or permit.

Archaeological interest means capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurement, controlled collection, analysis, interpretation, and explanation.

Archaeological resource means any material remains of human life or activities that are at least 50 years of age and that are of archaeological interest.

Arctic OCS means the Beaufort Sea and Chukchi Sea Planning Areas (for more information on these areas, see the Proposed Final OCS Oil and Gas Leasing Program for 2012-2017 (June 2012) at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/2012-2017/Program-Area-Maps/index.aspx ).

Arctic OCS conditions means, for the purposes of this part, the conditions operators can reasonably expect during operations on the Arctic OCS. Such conditions, depending on the time of year, include, but are not limited to: Extreme cold, freezing spray, snow, extended periods of low light, strong winds, dense fog, sea ice, strong currents, and dangerous sea states. Remote location, relative lack of infrastructure, and the existence of subsistence hunting and fishing areas are also characteristic of the Arctic region.

Attainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) not to exceed any primary or secondary ambient air quality standards established by EPA.

Best available and safest technology (BAST) means the best available and safest technologies that the BSEE Director determines to be economically feasible wherever failure of equipment would have a significant effect on safety, health, or the environment.

Best available control technology (BACT) means an emission limitation based on the maximum degree of reduction for each air pollutant subject to regulation, taking into account energy, environmental and economic impacts, and other costs. The Regional Supervisor will verify the BACT on a case-by-case basis, and it may include reductions achieved through the application of processes, systems, and techniques for the control of each air pollutant.

BOP systems and related equipment includes all pressure controlling and pressure containing well control equipment that may or will be exposed to the well's MASP during drilling, completion, workover, intervention, or abandonment. Well control equipment includes equipment that is installed for the purpose of pressure control and pressure containment when it becomes necessary to physically enter a well bore during drilling, completion, workover, intervention, or abandonment modes of operation.

Cap and flow system means an integrated suite of equipment and vessels, including a capping stack and associated flow lines, that, when installed or positioned, is used to control the flow of fluids escaping from the well by conveying the fluids to the surface to a vessel or facility equipped to process the flow of oil, gas, and water. A cap and flow system is a high pressure system that includes the capping stack and piping necessary to convey the flowing fluids through the choke manifold to the surface equipment.

Capping stack means a mechanical device, including one that is pre-positioned, that can be installed on top of a subsea or surface wellhead or blowout preventer to stop the uncontrolled flow of fluids into the environment.

Coastal environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the terrestrial ecosystem from the shoreline inward to the boundaries of the coastal zone.

Coastal zone means the coastal waters (including the lands therein and thereunder) and the adjacent shorelands (including the waters therein and thereunder) strongly influenced by each other and in proximity to the shorelands of the several coastal States. The coastal zone includes islands, transition and intertidal areas, salt marshes, wetlands, and beaches. The coastal zone extends seaward to the outer limit of the U.S. territorial sea and extends inland from the shorelines to the extent necessary to control shorelands, the uses of which have a direct and significant impact on the coastal waters, and the inward boundaries of which may be identified by the several coastal States, under the authority in section 305(b)(1) of the Coastal Zone Management Act (CZMA) of 1972.

Competitive reservoir means a reservoir in which there are one or more producible or producing well completions on each of two or more leases or portions of leases, with different lease operating interests, from which the lessees plan future production.

Containment dome means a non-pressurized container that can be used to collect fluids escaping from the well or equipment below the sea surface or from seeps by suspending the device over the discharge or seep location. The containment dome includes all of the equipment necessary to capture and convey fluids to the surface.

Correlative rights when used with respect to lessees of adjacent leases, means the right of each lessee to be afforded an equal opportunity to explore for, develop, and produce, without waste, minerals from a common source.

Data means facts and statistics, measurements, or samples that have not been analyzed, processed, or interpreted.

Departures mean approvals granted by the appropriate BSEE or BOEM representative for operating requirements/procedures other than those specified in the regulations found in this part. These requirements/procedures may be necessary to control a well; properly develop a lease; conserve natural resources, or protect life, property, or the marine, coastal, or human environment.

Development means those activities that take place following discovery of minerals in paying quantities, including but not limited to geophysical activity, drilling, platform construction, and operation of all directly related onshore support facilities, and which are for the purpose of producing the minerals discovered.

Development geological and geophysical (G&G) activities mean those G&G and related data-gathering activities on your lease or unit that you conduct following discovery of oil, gas, or sulphur in paying quantities to detect or imply the presence of oil, gas, or sulphur in commercial quantities.

Director means the Director of BSEE of the U.S. Department of the Interior, or an official authorized to act on the Director's behalf.

District Manager means the BSEE officer with authority and responsibility for operations or other designated program functions for a district within a BSEE Region. For activities on the Alaska OCS, any reference in this part to District Manager means the BSEE Regional Supervisor.

Eastern Gulf of America means all OCS areas of the Gulf of America the BOEM Director decides are adjacent to the State of Florida. The Eastern Gulf of America-is not the same as the Eastern Planning Area, an area established for OCS lease sales.

Emission offsets mean emission reductions obtained from facilities, either onshore or offshore, other than the facility or facilities covered by the proposed Exploration Plan (EP) or Development and Production Plan (DPP).

Enhanced recovery operations mean pressure maintenance operations, secondary and tertiary recovery, cycling, and similar recovery operations that alter the natural forces in a reservoir to increase the ultimate recovery of oil or gas.

Existing facility, as used in 30 CFR 550.303, means an OCS facility described in an Exploration Plan or a Development and Production Plan approved before June 2, 1980.

Exploration means the commercial search for oil, gas, or sulphur. Activities classified as exploration include but are not limited to:

(1) Geophysical and geological (G&G) surveys using magnetic, gravity, seismic reflection, seismic refraction, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur; and

(2) Any drilling conducted for the purpose of searching for commercial quantities of oil, gas, and sulphur, including the drilling of any additional well needed to delineate any reservoir to enable the lessee to decide whether to proceed with development and production.

Facility means:

(1) As used in § 250.130, all installations permanently or temporarily attached to the seabed on the OCS (including manmade islands and bottom-sitting structures). They include mobile offshore drilling units (MODUs) or other vessels engaged in drilling or downhole operations, used for oil, gas or sulphur drilling, production, or related activities. They include all floating production systems (FPSs), variously described as column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. They also include facilities for product measurement and royalty determination (e.g., lease Automatic Custody Transfer Units, gas meters) of OCS production on installations not on the OCS. Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with processing equipment and one or more satellite or secondary installations is a single facility. The Regional Supervisor may decide that the complexity of the individual installations justifies their classification as separate facilities.

(2) As used in 30 CFR 550.303, means all installations or devices permanently or temporarily attached to the seabed. They include mobile offshore drilling units (MODUs), even while operating in the “tender assist” mode ( i.e., with skid-off drilling units) or other vessels engaged in drilling or downhole operations. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.

(3) As used in § 250.490(b), means a vessel, a structure, or an artificial island used for drilling, well completion, well-workover, or production operations.

(4) As used in §§ 250.900 through 250.921, means all installations or devices permanently or temporarily attached to the seabed. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.

(5) As used in subpart S of this part, all types of structures permanently or temporarily attached to the seabed (e.g., mobile offshore drilling units (MODUs); floating production systems; floating production, storage and offloading facilities; tension-leg platforms; and spars) that are used for exploration, development, and production activities for oil, gas, or sulphur in the OCS. Facilities also include DOI-regulated pipelines.

Flaring means the burning of natural gas as it is released into the atmosphere.

Gas reservoir means a reservoir that contains hydrocarbons predominantly in a gaseous (single-phase) state.

Gas-well completion means a well completed in a gas reservoir or in the associated gas-cap of an oil reservoir.

Geological and geophysical (G&G) explorations mean those G&G surveys on your lease or unit that use seismic reflection, seismic refraction, magnetic, gravity, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur in commercial quantities.

Governor means the Governor of a State, or the person or entity designated by, or under, State law to exercise the powers granted to such Governor under the Act.

H 2 S absent means:

(1) Drilling, logging, coring, testing, or producing operations have confirmed the absence of H 2 S in concentrations that could potentially result in atmospheric concentrations of 20 ppm or more of H 2 S; or

(2) Drilling in the surrounding areas and correlation of geological and seismic data with equivalent stratigraphic units have confirmed an absence of H 2 S throughout the area to be drilled.

H 2 S present means drilling, logging, coring, testing, or producing operations have confirmed the presence of H 2 S in concentrations and volumes that could potentially result in atmospheric concentrations of 20 ppm or more of H 2 S.

H 2 S unknown means the designation of a zone or geologic formation where neither the presence nor absence of H 2 S has been confirmed.

HPHT environment means when one or more of the following well conditions exist:

(1) The drilling, completion, workover, intervention, injection, production, or abandonment of the well requires pressure controlling or pressure containing equipment, including well control equipment, assigned a pressure rating greater than 15,000 psia or a temperature rating greater than 350 degrees Fahrenheit;

(2) The MASP or SITP is greater than 15,000 psia at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead; or

(3) The flowing temperature is greater than 350 degrees Fahrenheit at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead.

Human environment means the physical, social, and economic components, conditions, and factors that interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.

Interpreted geological information means geological knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of data and analyzed geological information.

Interpreted geophysical information means geophysical knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of geophysical data and analyzed geophysical information.

Lease means an agreement that is issued under section 8 or maintained under section 6 of the Act and that authorizes exploration for, and development and production of, minerals. The term also means the area covered by that authorization, whichever the context requires.

Lease term pipelines mean those pipelines owned and operated by a lessee or operator that are completely contained within the boundaries of a single lease, unit, or contiguous (not cornering) leases of that lessee or operator.

Lessee means a person who has entered into a lease with the United States to explore for, develop, and produce the leased minerals. The term lessee also includes the BOEM-approved assignee of the lease, and the owner or the BOEM-approved assignee of operating rights for the lease.

Major Federal action means any action or proposal by the Secretary that is subject to the provisions of section 102(2)(C) of the National Environmental Policy Act of 1969, 42 U.S.C. (2)(C) ( i.e., an action that will have a significant impact on the quality of the human environment requiring preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act).

Marine environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the marine ecosystem. These include the waters of the high seas, the contiguous zone, transitional and intertidal areas, salt marshes, and wetlands within the coastal zone and on the OCS.

Material remains mean physical evidence of human habitation, occupation, use, or activity, including the site, location, or context in which such evidence is situated.

Maximum efficient rate (MER) means the maximum sustainable daily oil or gas withdrawal rate from a reservoir that will permit economic development and depletion of that reservoir without detriment to ultimate recovery.

Maximum production rate (MPR) means the approved maximum daily rate at which oil or gas may be produced from a specified oil-well or gas-well completion.

Minerals include oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals that are authorized by an Act of Congress to be produced.

Natural resources include, without limiting the generality thereof, oil, gas, and all other minerals, and fish, shrimp, oysters, clams, crabs, lobsters, sponges, kelp, and other marine animal and plant life but does not include water power or the use of water for the production of power.

Nonattainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) to exceed any primary or secondary ambient air quality standard established by EPA.

Nonsensitive reservoir means a reservoir in which ultimate recovery is not decreased by high reservoir production rates.

Oil reservoir means a reservoir that contains hydrocarbons predominantly in a liquid (single-phase) state.

Oil reservoir with an associated gas cap means a reservoir that contains hydrocarbons in both a liquid and gaseous (two-phase) state.

Oil-well completion means a well completed in an oil reservoir or in the oil accumulation of an oil reservoir with an associated gas cap.

Operating rights mean any interest held in a lease with the right to explore for, develop, and produce leased substances.

Operator means the person the lessee(s) designates as having control or management of operations on the leased area or a portion thereof. An operator may be a lessee, the BSEE-approved or BOEM-approved designated agent of the lessee(s), or the holder of operating rights under a BOEM-approved operating rights assignment.

Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside of the area of lands beneath navigable waters as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301) whose subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Person includes a natural person, an association (including partnerships, joint ventures, and trusts), a State, a political subdivision of a State, or a private, public, or municipal corporation.

Pipelines are the piping, risers, and appurtenances installed for transporting oil, gas, sulphur, and produced waters.

Processed geological or geophysical information means data collected under a permit or a lease that have been processed or reprocessed. Processing involves changing the form of data to facilitate interpretation. Processing operations may include, but are not limited to, applying corrections for known perturbing causes, rearranging or filtering data, and combining or transforming data elements. Reprocessing is the additional processing other than ordinary processing used in the general course of evaluation. Reprocessing operations may include varying identified parameters for the detailed study of a specific problem area.

Production means those activities that take place after the successful completion of any means for the removal of minerals, including such removal, field operations, transfer of minerals to shore, operation monitoring, maintenance, and workover operations.

Production areas are those areas where flammable petroleum gas, volatile liquids or sulphur are produced, processed (e.g., compressed), stored, transferred (e.g., pumped), or otherwise handled before entering the transportation process.

Projected emissions mean emissions, either controlled or uncontrolled, from a source or sources.

Prospect means a geologic feature having the potential for mineral deposits.

Regional Director means the BSEE officer with responsibility and authority for a Region within BSEE.

Regional Supervisor means the BSEE officer with responsibility and authority for operations or other designated program functions within a BSEE Region.

Right-of-Use and Easement (RUE) means a right to use a portion of the seabed at an OCS site, other than on a lease you own, to construct, secure to the seafloor, use, modify, or maintain platforms, sea floor production equipment, artificial islands, facilities, installations, and other devices, established to support the exploration, development, or production of oil and gas, mineral, or energy resources from an OCS or State submerged lands lease.

Right-of-way pipelines are those pipelines that are contained within:

(1) The boundaries of a single lease or unit, but are not owned and operated by a lessee or operator of that lease or unit;

(2) The boundaries of contiguous (not cornering) leases that do not have a common lessee or operator;

(3) The boundaries of contiguous (not cornering) leases that have a common lessee or operator but are not owned and operated by that common lessee or operator; or

(4) An unleased block(s).

Routine operations, for the purposes of subpart F, mean any of the following operations conducted on a well with the tree installed:

(1) Cutting paraffin;

(2) Removing and setting pump-through-type tubing plugs, gas-lift valves, and subsurface safety valves that can be removed by wireline operations;

(3) Bailing sand;

(4) Pressure surveys;

(5) Swabbing;

(6) Scale or corrosion treatment;

(7) Caliper and gauge surveys;

(8) Corrosion inhibitor treatment;

(9) Removing or replacing subsurface pumps;

(10) Through-tubing logging (diagnostics);

(11) Wireline fishing;

(12) Setting and retrieving other subsurface flow-control devices; and

(13) Acid treatments.

Sensitive reservoir means a reservoir in which the production rate will affect ultimate recovery.

Significant archaeological resource means those archaeological resources that meet the criteria of significance for eligibility to the National Register of Historic Places as defined in 36 CFR 60.4, or its successor.

Source control and containment equipment (SCCE) means the capping stack, cap and flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels the collective purpose of which is to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment. “Surface devices” refers to equipment mounted or staged on a barge, vessel, or facility to separate, treat, store and/or dispose of fluids conveyed to the surface by the cap and flow system or the containment dome. “Subsea devices” includes, but is not limited to, remotely operated vehicles, anchors, buoyancy equipment, connectors, cameras, controls and other subsea equipment necessary to facilitate the deployment, operation, and retrieval of the SCCE. The SCCE does not include a blowout preventer.

Suspension means a granted or directed deferral of the requirement to produce (Suspension of Production (SOP)) or to conduct leaseholding operations (Suspension of Operations (SOO)).

Venting means the release of gas into the atmosphere without igniting it. This includes gas that is released underwater and bubbles to the atmosphere.

Waste of oil, gas, or sulphur means:

(1) The physical waste of oil, gas, or sulphur;

(2) The inefficient, excessive, or improper use, or the unnecessary dissipation of reservoir energy;

(3) The locating, spacing, drilling, equipping, operating, or producing of any oil, gas, or sulphur well(s) in a manner that causes or tends to cause a reduction in the quantity of oil, gas, or sulphur ultimately recoverable under prudent and proper operations or that causes or tends to cause unnecessary or excessive surface loss or destruction of oil or gas; or

(4) The inefficient storage of oil.

Welding means all activities connected with welding, including hot tapping and burning.

Wellbay is the area on a facility within the perimeter of the outermost wellheads.

Well-completion operations mean the work conducted to establish production from a well after the production-casing string has been set, cemented, and pressure-tested.

Well-control fluid means drilling mud, completion fluid, or workover fluid as appropriate to the particular operation being conducted.

Western Gulf of America means all OCS areas of the Gulf of America except those the BOEM Director decides are adjacent to the State of Florida. The Western Gulf of America is not the same as the Western Planning Area, an area established for OCS lease sales.

Workover operations mean the work conducted on wells after the initial well-completion operation for the purpose of maintaining or restoring the productivity of a well.

You means a lessee, the owner or holder of operating rights, a designated operator or agent of the lessee(s), a pipeline right-of-way holder, or a State lessee granted a right-of-use and easement.

§ 250.106What standards will the Director use to regulate lease operations?

The Director will regulate all operations under a lease, right-of-use and easement, or right-of-way to:

(a) Promote orderly exploration, development, and production of mineral resources;

(b) Prevent injury or loss of life;

(c) Prevent damage to or waste of any natural resource, property, or the environment; and

(d) Cooperate and consult with affected States, local governments, other interested parties, and relevant Federal agencies.

§ 250.107What must I do to protect health, safety, property, and the environment?

(a) You must protect health, safety, property, and the environment by:

(1) Performing all operations in a safe and workmanlike manner;

(2) Maintaining all equipment and work areas in a safe condition;

(3) Utilizing recognized engineering practices that reduce risks to the lowest level practicable when conducting design, fabrication, installation, operation, inspection, repair, and maintenance activities; and

(4) Complying with all lease, plan, and permit terms and conditions.

(b) You must immediately control, remove, or otherwise correct any hazardous oil and gas accumulation or other health, safety, or fire hazard.

(c) Best available and safest technology. (1) On all new drilling and production operations and, except as provided in paragraph (c)(3) of this section, on existing operations, you must use the best available and safest technologies (BAST) which the Director determines to be economically feasible whenever the Director determines that failure of equipment would have a significant effect on safety, health, or the environment, except where the Director determines that the incremental benefits are clearly insufficient to justify the incremental costs of utilizing such technologies.

(2) Conformance with BSEE regulations will be presumed to constitute the use of BAST unless and until the Director determines that other technologies are required pursuant to paragraph (c)(1) of this section.

(3) The Director may waive the requirement to use BAST on a category of existing operations if the Director determines that use of BAST by that category of existing operations would not be practicable. The Director may waive the requirement to use BAST on an existing operation at a specific facility if you submit a waiver request demonstrating that the use of BAST would not be practicable.

(d) BSEE may issue orders to ensure compliance with this part, including, but not limited to, orders to produce and submit records and to inspect, repair, and/or replace equipment. BSEE may also issue orders to shut-in operations of a component or facility because of a threat of serious, irreparable, or immediate harm to health, safety, property, or the environment posed by those operations or because the operations violate law, including a regulation, order, or provision of a lease, plan, or permit.

§ 250.108What requirements must I follow for cranes and other material-handling equipment?

(a) All cranes installed on fixed platforms must be operated in accordance with American Petroleum Institute's Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D (as incorporated by reference in § 250.198).

(b) All cranes installed on fixed platforms must be equipped with a functional anti-two block device.

(c) If a fixed platform is installed after March 17, 2003, all cranes on the platform must meet the requirements of American Petroleum Institute Specification for Offshore Pedestal Mounted Cranes, API Spec 2C (as incorporated by reference in § 250.198).

(d) All cranes manufactured after March 17, 2003, and installed on a fixed platform, must meet the requirements of API Spec 2C.

(e) You must maintain records specific to a crane or the operation of a crane installed on an OCS fixed platform, as follows:

(1) Retain all design and construction records, including installation records for any anti-two block safety devices, for the life of the crane. The records must be kept at the OCS fixed platform.

(2) Retain all inspection, testing, and maintenance records of cranes for at least 4 years. The records must be kept at the OCS fixed platform.

(3) Retain the qualification records of the crane operator and all rigger personnel for at least 4 years. The records must be kept at the OCS fixed platform.

(f) You must operate and maintain all other material-handling equipment in a manner that ensures safe operations and prevents pollution.

§ 250.109What documents must I prepare and maintain related to welding?

(a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan.

(b) You must keep the following at the site where welding occurs:

(1) A copy of the plan and its approval letter; and

(2) Drawings showing the designated safe-welding areas.

§ 250.110What must I include in my welding plan?

You must include all of the following in the welding plan that you prepare under § 250.109:

(a) Standards or requirements for welders;

(b) How you will ensure that only qualified personnel weld;

(c) Practices and procedures for safe welding that address:

(1) Welding in designated safe areas;

(2) Welding in undesignated areas, including wellbay;

(3) Fire watches;

(4) Maintenance of welding equipment; and

(5) Plans showing all designated safe-welding areas.

(d) How you will prevent spark-producing activities ( i.e., grinding, abrasive blasting/cutting and arc-welding) in hazardous locations.

§ 250.111Who oversees operations under my welding plan?

A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is properly qualified according to the welding plan. This person also must inspect all welding equipment before welding.

§ 250.112What standards must my welding equipment meet?

Your welding equipment must meet the following requirements:

(a) All engine-driven welding equipment must be equipped with spark arrestors and drip pans;

(b) Welding leads must be completely insulated and in good condition;

(c) Hoses must be leak-free and equipped with proper fittings, gauges, and regulators; and

(d) Oxygen and fuel gas bottles must be secured in a safe place.

§ 250.113What procedures must I follow when welding?

(a) Before you weld, you must move any equipment containing hydrocarbons or other flammable substances at least 35 feet horizontally from the welding area. You must move similar equipment on lower decks at least 35 feet from the point of impact where slag, sparks, or other burning materials could fall. If moving this equipment is impractical, you must protect that equipment with flame-proofed covers, shield it with metal or fire-resistant guards or curtains, or render the flammable substances inert.

(b) While you weld, you must monitor all water-discharge-point sources from hydrocarbon-handling vessels. If a discharge of flammable fluids occurs, you must stop welding.

(c) If you cannot weld in one of the designated safe-welding areas that you listed in your safe welding plan, you must meet the following requirements:

(1) You may not begin welding until:

(i) The welding supervisor or designated person in charge advises in writing that it is safe to weld.

(ii) You and the designated person in charge inspect the work area and areas below it for potential fire and explosion hazards.

(2) During welding, the person in charge must designate one or more persons as a fire watch. The fire watch must:

(i) Have no other duties while actual welding is in progress;

(ii) Have usable firefighting equipment;

(iii) Remain on duty for 30 minutes after welding activities end; and

(iv) Maintain a continuous surveillance with a portable gas detector during the welding and burning operation if welding occurs in an area not equipped with a gas detector.

(3) You may not weld piping, containers, tanks, or other vessels that have contained a flammable substance unless you have rendered the contents inert and the designated person in charge has determined it is safe to weld. This does not apply to approved hot taps.

(4) You may not weld within 10 feet of a wellbay unless you have shut in all producing wells in that wellbay.

(5) You may not weld within 10 feet of a production area, unless you have shut in that production area.

(6) You may not weld while you drill, complete, workover, or conduct wireline operations unless:

(i) The fluids in the well (being drilled, completed, worked over, or having wireline operations conducted) are noncombustible; and

(ii) You have precluded the entry of formation hydrocarbons into the wellbore by either mechanical means or a positive overbalance toward the formation.

§ 250.114How must I install, maintain, and operate electrical equipment?

The requirements in this section apply to all electrical equipment on all platforms, artificial islands, fixed structures, and their facilities.

(a) You must classify all areas according to API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 (as incorporated by reference in § 250.198), or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2 (as incorporated by reference in § 250.198).

(b) Employees who maintain your electrical systems must have expertise in area classification and the performance, operation and hazards of electrical equipment.

(c) You must install all electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Division 1, and Division 2 Locations (as incorporated by reference in § 250.198), or API RP 14FZ, Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1, and Zone 2 Locations (as incorporated by reference in § 250.198).

(d) On each engine that has an electric ignition system, you must use an ignition system designed and maintained to reduce the release of electrical energy.

§ 250.115What are the procedures for, and effects of, incorporation of documents by reference in this part?

For the documents incorporated by reference in this part:

(a) Incorporation by reference of a document is limited to the edition of the document, or the specific edition and supplement or addendum, that is cited in § 250.198. Future amendments or revisions of the incorporated document are not included. BSEE will publish any changes to the incorporation of the document in the Federal Register and amend § 250.198 as appropriate.

(b) BSEE may make a rule amending the incorporation of a document effective without prior opportunity for public comment when BSEE determines:

(1) That the revisions to the document result in safety improvements or represent new industry standard technology and do not impose undue costs on the affected parties; and

(2) BSEE meets the requirements for making a rule immediately effective under 5 U.S.C. 553.

(c) The effect of incorporation by reference of a document into the regulations in this part is that the incorporated document is a requirement. When a section in this part refers to an incorporated document, you are responsible for complying with the provisions of that entire document, except to the extent that the section that refers to the document provides otherwise. When a section in this part refers to a part of an incorporated document, you are responsible for complying with that part of the document as provided in that section.

(d) Under §§ 250.141 and 250.142, you may comply with a later edition of a specific document incorporated by reference, provided:

(1) You show that complying with the later edition provides a degree of protection, safety, or performance equal to or better than would be achieved by compliance with the listed edition; and

(2) You obtain prior written approval for alternative compliance from the authorized BSEE official.

§ 250.118Will BSEE approve gas injection?

The Regional Supervisor may authorize you to inject gas on the OCS, on and off-lease, to promote conservation of natural resources and to prevent waste.

(a) To receive BSEE approval for injection, you must:

(1) Show that the injection will not result in undue interference with operations under existing leases; and

(2) Submit a written application to the Regional Supervisor for injection of gas.

(b) The Regional Supervisor will approve gas injection applications that:

(1) Enhance recovery;

(2) Prevent flaring of casinghead gas; or

(3) Implement other conservation measures approved by the Regional Supervisor.

§ 250.120How does injecting, storing, or treating gas affect my royalty payments?

(a) If you produce gas from an OCS lease and inject it into a reservoir on the lease or unit for the purposes cited in § 250.118(b), you are not required to pay royalties until you remove or sell the gas from the reservoir.

(b) If you produce gas from an OCS lease and store it according to 30 CFR 550.119, you must pay royalty before injecting it into the storage reservoir.

(c) If you produce gas from an OCS lease and treat it at an off-lease or off-unit location, you must pay royalties when the gas is first produced.

§ 250.121What happens when the reservoir contains both original gas in place and injected gas?

If the reservoir contains both original gas in place and injected gas, when you produce gas from the reservoir you must use a BSEE-approved formula to determine the amounts of injected or stored gas and gas original to the reservoir.

§ 250.122What effect does subsurface storage have on the lease term?

If you use a lease area for subsurface storage of gas, it does not affect the continuance or expiration of the lease.

§ 250.124Will BSEE approve gas injection into the cap rock containing a sulphur deposit?

To receive the Regional Supervisor's approval to inject gas into the cap rock of a salt dome containing a sulphur deposit, you must show that the injection:

(a) Is necessary to recover oil and gas contained in the cap rock; and

(b) Will not significantly increase potential hazards to present or future sulphur mining operations.

§ 250.125Service fees.

(a) The table in this paragraph (a) shows the fees that you must pay to BSEE for the services listed. The fees will be adjusted periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document in the Federal Register. If a significant adjustment is needed to arrive at the new actual cost for any reason other than inflation, then a proposed rule containing the new fees will be published in the Federal Register for comment.

Service—processing of the following:

Fee amount

30 CFR citation

(1) Suspension of Operations/Suspension of Production (SOO/SOP) Request

$2,469

§ 250.171(e).

(2) Deepwater Operations Plan (DWOP) Process:

(i) Project Conceptual Plan

$2,697

250.226.

(ii) New or Unusual Technology Conceptual Plan

7,964

250.226.

(iii) New or Unusual Technology Barrier Equipment Conceptual Plan

15,104

250.226.

(iv) DWOP

10,647

250.235.

(v) Revised DWOP

963

250.246.

(vi) Combined Project Conceptual Plan/DWOP

13,856

250.245.

(vii) Supplemental DWOP

9,626

250.247.

(3) Application for Permit to Drill (APD; Form BSEE-0123)

$2,458 for initial applications only; no fee for revisions

§ 250.410(d); § 250.513(b); § 250.1617(a).

(4) Application for Permit to Modify (APM; Form BSEE-0124)

$145

§ 250.465(b); § 250.513(b); § 250.613(b); § 250.1618(a); § 250.1704(g).

(5) New Facility Production Safety System Application for facility with more than 125 components

$6,312

A $16,610 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $8,638 for an inspection of a facility while in a shipyard

A component is a piece of equipment or ancillary system that is protected by one or more of the safety devices required by API RP 14C (as incorporated by reference in § 250.198)

§ 250.842.

(6) New Facility Production Safety System Application for facility with 25-125 components

$1,528

A $10,430 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $5,980 for an inspection of a facility while in a shipyard

§ 250.842.

(7) New Facility Production Safety System Application for facility with fewer than 25 components

$758

§ 250.842.

(8) Production Safety System Application—Modification with more than 125 components reviewed

$704

§ 250.842.

(9) Production Safety System Application—Modification with 25-125 components reviewed

$252

§ 250.842.

(10) Production Safety System Application—Modification with fewer than 25 components reviewed

$107

§ 250.842.

(11) Platform Application—Installation—Under the Platform Verification Program

$26,444

§ 250.905(l).

(12) Platform Application—Installation—Fixed Structure Under the Platform Approval Program

$3,787

§ 250.905(l).

(13) Platform Application—Installation—Caisson/Well Protector

$1,927

§ 250.905(l).

(14) Platform Application—Modification/Repair

$4,518

§ 250.905(l).

(15) New Pipeline Application (Lease Term)

$4,119

§ 250.1000(b).

(16) Pipeline Application—Modification (Lease Term)

$2,392

§ 250.1000(b).

(17) Pipeline Application—Modification (ROW)

$4,849

§ 250.1000(b).

(18) Pipeline Repair Notification

$451

§ 250.1008(e).

(19) Pipeline Right-of-Way (ROW) Grant Application

$3,223

§ 250.1015(a).

(20) Pipeline Conversion of Lease Term to ROW

$275

§ 250.1015(a).

(21) Pipeline ROW Assignment

$234

§ 250.1018(b).

(22) 500 Feet from Lease/Unit Line Production Request

$4,527

§ 250.1156(a).

(23) Gas Cap Production Request

$5,761

§ 250.1157(b).

(24) Downhole Commingling Request

$6,722

§ 250.1158(a).

(25) Complex Surface Commingling and Measurement Application

$4,718

§ 250.1202(a); § 250.1203(b); § 250.1204(a).

(26) Simple Surface Commingling and Measurement Application

$1,595

§ 250.1202(a); § 250.1203(b); § 250.1204(a).

(27) Voluntary Unitization Proposal or Unit Expansion

$14,678

§ 250.1303(d).

(28) Unitization Revision

$1,042

§ 250.1303(d).

(29) Application to Remove a Platform or Other Facility

$5,448

§ 250.1727.

(30) Application to Decommission a Pipeline (Lease Term)

$1,328

§ 250.1751(a) or § 250.1752(a).

(31) Application to Decommission a Pipeline (ROW)

$2,524

§ 250.1751(a) or § 250.1752(a).

(b) Payment of the fees listed in paragraph (a) of this section must accompany the submission of the document for approval or be sent to an office identified by the Regional Director. Once a fee is paid, it is nonrefundable, even if an application or other request is withdrawn. If your application is returned to you as incomplete, you are not required to submit a new fee when you submit the amended application.

(c) Verbal approvals are occasionally given in special circumstances. Any action that will be considered a verbal permit approval requires either a paper permit application to follow the verbal approval or an electronic application submittal within 72 hours. Payment must be made with the completed paper or electronic application.

§ 250.126Electronic payment instructions.

(a) You must file all payments electronically through the Fees for Services Page on the BSEE website at https://www.bsee.gov/who-we-are/working-with-us/Fees-for-Services. This includes, but is not limited to, all OCS applications, permits, or any filing fees. You must include a copy of the Pay.gov confirmation receipt page with your application, permit, or filing fee.

(b) If you submitted an application or permit through eWell, you must use the interactive payment feature in that system, which directs you through Pay.gov to make a payment. It is recommended that you keep a copy of your payment confirmation receipt in the event that any questions arise regarding your transaction.

§ 250.130Why does BSEE conduct inspections?

BSEE will inspect OCS facilities and any vessels engaged in drilling or other downhole operations. These include facilities under jurisdiction of other Federal agencies that we inspect by agreement. We conduct these inspections:

(a) To verify that you are conducting operations according to the Act, the regulations, the lease, right-of-way, the BOEM-approved Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws and regulations; and

(b) To determine whether equipment designed to prevent or ameliorate blowouts, fires, spillages, or other major accidents has been installed and is operating properly according to the requirements of this part.

§ 250.131Will BSEE notify me before conducting an inspection?

BSEE conducts both scheduled and unscheduled inspections.

§ 250.132What must I do when BSEE conducts an inspection?

(a) When BSEE conducts an inspection, you must provide:

(1) Access to all platforms, artificial islands, and other installations on your leases or associated with your lease, right-of-use and easement, or right-of-way; and

(2) Helicopter landing sites and refueling facilities for any helicopters we use to regulate offshore operations.

(b) You must make the following available for us to inspect:

(1) The area covered under a lease, right-of-use and easement, right-of-way, or permit;

(2) All improvements, structures, and fixtures on these areas; and

(3) All records of design, construction, operation, maintenance, repairs, or investigations on or related to the area.

§ 250.133Will BSEE reimburse me for my expenses related to inspections?

Upon request, BSEE will reimburse you for food, quarters, and transportation that you provide for BSEE representatives while they inspect lease facilities and operations. You must send us your reimbursement request within 90 days of the inspection.

§ 250.135What will BSEE do if my operating performance is unacceptable?

BSEE will determine if your operating performance is unacceptable. BSEE will refer a determination of unacceptable performance to BOEM, who may disapprove or revoke your designation as operator on a single facility or multiple facilities. We will give you adequate notice and opportunity for a review by BSEE officials before making a determination that your operating performance is unacceptable.

§ 250.136How will BSEE determine if my operating performance is unacceptable?

In determining if your operating performance is unacceptable, BSEE will consider, individually or collectively:

(a) Accidents and their nature;

(b) Pollution events, environmental damages and their nature;

(c) Incidents of noncompliance;

(d) Civil penalties;

(e) Failure to adhere to OCS lease obligations; or

(f) Any other relevant factors.

§ 250.140When will I receive an oral approval?

When you apply for BSEE approval of any activity, we normally give you a written decision. The following table shows circumstances under which we may give an oral approval.

When you . . .

We may . . .

And . . .

(a) Request approval orally,

Give you an oral approval,

You must then confirm the oral request by sending us a written request within 72 hours.

(b) Request approval in writing,

Give you an oral approval if quick action is needed,

We will send you a written approval afterward. It will include any conditions that we place on the oral approval.

(c) Request approval orally for gas flaring,

Give you an oral approval,

You don't have to follow up with a written request unless the Regional Supervisor requires it. When you stop the approved flaring, you must promptly send a letter summarizing the location, dates and hours, and volumes of liquid hydrocarbons produced and gas flared by the approved flaring (see 30 CFR 250, subpart K).

§ 250.141May I ever use alternate procedures or equipment?

You may use alternate procedures or equipment after receiving approval as described in this section.

(a) Any alternate procedures or equipment that you propose to use must provide a level of safety and environmental protection that equals or surpasses current BSEE requirements.

(b) You must receive the District Manager's or Regional Supervisor's written approval before you can use alternate procedures or equipment.

(c) To receive approval, you must either submit information or give an oral presentation to the appropriate Regional Supervisor. Your presentation must describe the site-specific application(s), performance characteristics, and safety features of the proposed procedure or equipment.

§ 250.142How do I receive approval for departures?

We may approve departures to the operating requirements. You may apply for a departure by writing to the District Manager or Regional Supervisor.

§ 250.145How do I designate an agent or a local agent?

(a) You or your designated operator may designate for the Regional Supervisor's approval, or the Regional Director may require you to designate an agent empowered to fulfill your obligations under the Act, the lease, or the regulations in this part.

(b) You or your designated operator may designate for the Regional Supervisor's approval a local agent empowered to receive notices and submit requests, applications, notices, or supplemental information.

§ 250.146Who is responsible for fulfilling leasehold obligations?

(a) When you are not the sole lessee, you and your co-lessee(s) are jointly and severally responsible for fulfilling your obligations under the provisions of 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 unless otherwise provided in these regulations.

(b) If your designated operator fails to fulfill any of your obligations under 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582, the Regional Supervisor may require you or any or all of your co-lessees to fulfill those obligations or other operational obligations under the Act, the lease, or the regulations.

(c) Whenever the regulations in 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 require the lessee to meet a requirement or perform an action, the lessee, operator (if one has been designated), and the person actually performing the activity to which the requirement applies are jointly and severally responsible for complying with the regulation.

§ 250.150How do I name facilities and wells in the Gulf of America Region?

(a) Assign each facility a letter designation except for those types of facilities identified in paragraph (c)(1) of this section. For example, A, B, CA, or CB.

(1) After a facility is installed, rename each predrilled well that was assigned only a number and was suspended temporarily at the mudline or at the surface. Use a letter and number designation. The letter used must be the same as that of the production facility, and the number used must correspond to the order in which the well was completed, not necessarily the number assigned when it was drilled. For example, the first well completed for production on Facility A would be renamed Well A-1, the second would be Well A-2, and so on; and

(2) When you have more than one facility on a block, each facility installed, and not bridge-connected to another facility, must be named using a different letter in sequential order. For example, EC 222A, EC 222B, EC 222C.

(3) When you have more than one facility on multiple blocks in a local area being co-developed, each facility installed and not connected with a walkway to another facility should be named using a different letter in sequential order with the block number corresponding to the block on which the platform is located. For example, EC 221A, EC 222B, and EC 223C.

(b) In naming multiple well caissons, you must assign a letter designation.

(c) In naming single well caissons, you must use certain criteria as follows:

(1) For single well caissons not attached to a facility with a walkway, use the well designation. For example, Well No. 1;

(2) For single well caissons attached to a facility with a walkway, use the same designation as the facility. For example, rename Well No.10 as A-10; and

(3) For single well caissons with production equipment, use a letter designation for the facility name and a letter plus number designation for the well. For example, the Well No. 1 caisson would be designated as Facility A, and the well would be Well A-1.

§ 250.151How do I name facilities in the Pacific Region?

The operator assigns a name to the facility.

§ 250.152How do I name facilities in the Alaska Region?

Facilities will be named and identified according to the Regional Director's directions.

§ 250.153Do I have to rename an existing facility or well?

You do not have to rename facilities installed and wells drilled before January 27, 2000, unless the Regional Director requires it.

§ 250.154What identification signs must I display?

(a) You must identify all facilities, artificial islands, and mobile offshore drilling units with a sign maintained in a legible condition.

(1) You must display an identification sign that can be viewed from the waterline on at least one side of the platform. The sign must use at least 3-inch letters and figures.

(2) When helicopter landing facilities are present, you must display an additional identification sign that is visible from the air. The sign must use at least 12-inch letters and figures and must also display the weight capacity of the helipad unless noted on the top of the helipad. If this sign is visible to both helicopter and boat traffic, then the sign in paragraph (a)(1) of this section is not required.

(3) Your identification sign must:

(i) List the name of the lessee or designated operator;

(ii) In the GOA-OCS Region, list the area designation or abbreviation and the block number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps;

(iii) In the Pacific OCS Region, list the lease number on which the facility is located; and

(iv) List the name of the platform, structure, artificial island, or mobile offshore drilling unit.

(b) You must identify singly completed wells and multiple completions as follows:

(1) For each singly completed well, list the lease number and well number on the wellhead or on a sign affixed to the wellhead;

(2) For wells with multiple completions, downhole splitter wells, and multilateral wells, identify each completion in addition to the well name and lease number individually on the well flowline at the wellhead; and

(3) For subsea wells that flow individually into separate pipelines, affix the required sign on the pipeline or surface flowline dedicated to that subsea well at a convenient location on the receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is required.

§ 250.168May operations or production be suspended?

(a) You may request approval of a suspension, or the Regional Supervisor may direct a suspension (Directed Suspension), for all or any part of a lease or unit area.

(b) Depending on the nature of the suspended activity, suspensions are labeled either Suspensions of Operations (SOO) or Suspensions of Production (SOP).

§ 250.169What effect does suspension have on my lease?

(a) A suspension may extend the term of a lease (see § 250.180(b), (d), and (e)). The extension is equal to the length of time the suspension is in effect, except as provided in paragraph (b) of this section.

(b) A Directed Suspension does not extend the term of a lease when the Regional Supervisor directs a suspension because of:

(1) Gross negligence; or

(2) A willful violation of a provision of the lease or governing statutes and regulations.

§ 250.170How long does a suspension last?

(a) BSEE may issue suspensions for up to 5 years per suspension. The Regional Supervisor will set the length of the suspension based on the conditions of the individual case involved. BSEE may grant consecutive suspension periods.

(b) An SOO ends automatically when the suspended operation commences.

(c) An SOP ends automatically when production begins.

(d) A Directed Suspension normally ends as specified in the letter directing the suspension.

(e) BSEE may terminate any suspension when the Regional Supervisor determines the circumstances that justified the suspension no longer exist or that other lease conditions warrant termination. The Regional Supervisor will notify you of the reasons for termination and the effective date.

§ 250.171How do I request a suspension?

You must submit your request for a suspension to the Regional Supervisor, and BSEE must receive the request before the end of the lease term ( i.e., end of primary term, end of the 1-year period following the last leaseholding operation, and end of a current suspension). Your request must include:

(a) The justification for the suspension including the length of suspension requested;

(b) A reasonable schedule of work leading to the commencement or restoration of the suspended activity;

(c) A statement that a well has been drilled on the lease and determined to be producible according to § 250.1603 (SOP only), 30 CFR 550.115, or 30 CFR 550.116;

(d) A commitment to production (SOP only); and

(e) The service fee listed in § 250.125 of this subpart.

§ 250.172When may the Regional Supervisor grant or direct an SOO or SOP?

The Regional Supervisor may grant or direct an SOO or SOP under any of the following circumstances:

(a) When necessary to comply with judicial decrees prohibiting any activities or the permitting of those activities. The effective date of the suspension will be the effective date required by the action of the court;

(b) When activities pose a threat of serious, irreparable, or immediate harm or damage. This would include a threat to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment. BSEE may require you to do a site-specific study (see § 250.177(a)).

(c) When necessary for the installation of safety or environmental protection equipment;

(d) When necessary to carry out the requirements of NEPA or to conduct an environmental analysis; or

(e) When necessary to allow for inordinate delays encountered in obtaining required permits or consents, including administrative or judicial challenges or appeals.

§ 250.173When may the Regional Supervisor direct an SOO or SOP?

The Regional Supervisor may direct a suspension when:

(a) You failed to comply with an applicable law, regulation, order, or provision of a lease or permit; or

(b) The suspension is in the interest of National security or defense.

§ 250.174When may the Regional Supervisor grant or direct an SOP?

The Regional Supervisor may grant or direct an SOP when the suspension is in the National interest, and it is necessary because the suspension will meet one of the following criteria:

(a) It will allow you to properly develop a lease, including time to construct and install production facilities;

(b) It will allow you time to obtain adequate transportation facilities;

(c) It will allow you time to enter a sales contract for oil, gas, or sulphur. You must show that you are making an effort to enter into the contract(s); or

(d) It will avoid continued operations that would result in premature abandonment of a producing well(s).

§ 250.175When may the Regional Supervisor grant an SOO?

(a) The Regional Supervisor may grant an SOO when necessary to allow you time to begin drilling or other operations when you are prevented by reasons beyond your control, such as unexpected weather, unavoidable accidents, or drilling rig delays.

(b) The Regional Supervisor may grant an SOO when all of the following conditions are met:

(1) The lease was issued with a primary lease term of 5 years, or with a primary term of 8 years with a requirement to drill within 5 years;

(2) Before the end of the third year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that indicates:

(i) The presence of a salt sheet;

(ii) That all or a portion of a potential hydrocarbon-bearing formation may lie beneath or adjacent to the salt sheet; and

(iii) The salt sheet interferes with identification of the potential hydrocarbon-bearing formation.

(3) The interpreted geophysical information required under paragraph (b)(2) of this section must include full 3-D depth migration beneath the salt sheet and over the entire lease area.

(4) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing formation.

(5) You demonstrate that additional time is necessary to:

(i) Complete current processing or interpretation of existing geophysical data or information;

(ii) Acquire, process, or interpret new geophysical data or information; or

(iii) Drill into the potential hydrocarbon-bearing formation identified as a result of the activities conducted in paragraphs (b)(2), (b)(4), and (b)(5) of this section.

(c) The Regional Supervisor may grant an SOO to conduct additional geological and geophysical data analysis that may lead to the drilling of a well below 25,000 feet true vertical depth below the datum at mean sea level (TVD SS) when all of the following conditions are met:

(1) The lease was issued with a primary lease term of:

(i) Five years; or

(ii) Eight years with a requirement to drill within 5 years.

(2) Before the end of the fifth year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that:

(i) Indicates that all or a portion of a potential hydrocarbon-bearing formation lies below 25,000 feet TVD SS; and

(ii) Includes full 3-D depth migration over the entire lease area.

(3) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing geologic structure or stratigraphic trap lying below 25,000 feet TVD SS.

(4) You demonstrate that additional time is necessary to:

(i) Complete current processing or interpretation of existing geophysical data or information;

(ii) Acquire, process, or interpret new geophysical or geological data or information that would affect the decision to drill the same geologic structure or stratigraphic trap, as determined by the Regional Supervisor, identified in paragraphs (c)(2) and (c)(3) of this section; or

(iii) Drill a well below 25,000 feet TVD SS into the geologic structure or stratigraphic trap identified as a result of the activities conducted in paragraphs (c)(2), (c)(3), and (c)(4)(i) and (ii) of this section.

§ 250.176Does a suspension affect my royalty payment?

A directed suspension may affect the payment of rental or royalties for the lease as provided in 30 CFR 1218.154.

§ 250.177What additional requirements may the Regional Supervisor order for a suspension?

If BSEE grants or directs a suspension under paragraph § 250.172(b), the Regional Supervisor may require you to:

(a) Conduct a site-specific study.

(1) The Regional Supervisor must approve or prescribe the scope for any site-specific study that you perform.

(2) The study must evaluate the cause of the hazard, the potential damage, and the available mitigation measures.

(3) You must pay for the study unless you request, and the Regional Supervisor agrees to arrange, payment by another party.

(4) You must furnish copies and results of the study to the Regional Supervisor.

(5) BSEE will make the results available to other interested parties and to the public.

(6) The Regional Supervisor will use the results of the study and any other information that becomes available:

(i) To decide if the suspension can be lifted; and

(ii) To determine any actions that you must take to mitigate or avoid any damage to the environment, life, or property.

(b) Submit a revised Exploration Plan (including any required mitigating measures);

(c) Submit a revised Development and Production Plan (including any required mitigating measures); or

(d) Submit a revised Development Operations Coordination Document according to 30 CFR part 550, subpart B.

§ 250.180What am I required to do to keep my lease term in effect?

(a) If your lease is in its primary term:

(1) You must submit a report to the District Manager according to paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases during the last year of the primary term, and whenever production resumes during the last year of the primary term.

(2) Your lease expires at the end of its primary term unless you are conducting operations on your lease (see 30 CFR part 556). For purposes of this section, the term operations means, drilling, well-reworking, or production in paying quantities. The objective of the drilling or well-reworking must be to establish production in paying quantities on the lease.

(b) If you stop conducting operations during the last year of your primary lease term, your lease will expire unless you either resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.

(c) If you extend your lease term under paragraph (b) of this section, you must pay rental or minimum royalty, as appropriate, for each year or part of the year during which your lease continues in force beyond the end of the primary lease term.

(d) If you stop conducting operations on a lease that has continued beyond its primary term, your lease will expire unless you resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.

(e) You may ask the Regional Supervisor to allow you more than a year to resume operations on a lease continued beyond its primary term when operating conditions warrant. The request must be in writing and explain the operating conditions that warrant a longer period. In allowing additional time, the Regional Supervisor must determine that the longer period is in the National interest, and it conserves resources, prevents waste, or protects correlative rights.

(f) When you begin conducting operations on a lease that has continued beyond its primary term, you must immediately notify the District Manager either orally or by fax or e-mail and follow up with a written report according to paragraph (g) of this section.

(g) If your lease is continued beyond its primary term, you must submit a report to the District Manager under paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases, whenever production resumes before the end of the 1-year period after having ceased, or whenever drilling or well-reworking operations begin before the end of the 1-year period.

(h) The reports required by paragraphs (a) and (g) of this section must contain:

(1) Name of lessee or operator;

(2) The well number, lease number, area, and block;

(3) As appropriate, the unit agreement name and number; and

(4) A description of the operation and pertinent dates.

(i) You must submit the reports required by paragraphs (a) and (g) of this section within the following timeframes:

(1) Initialization of production—within 5 days of initial production.

(2) Cessation of production—within 15 days after the first full month of zero production.

(3) Resumption of production—within 5 days of resuming production after ceasing production under paragraph (i)(2) of this section.

(4) Drilling or well reworking operations—within 5 days of beginning and completing the leaseholding operations.

(j) For leases continued beyond the primary term, you must immediately report to the District Manager if operations do not begin before the end of the 1-year period.

§ 250.186What reporting information and report forms must I submit?

(a) You must submit information and reports as BSEE requires.

(1) You may obtain copies of forms from, and submit completed forms to, the District Manager or Regional Supervisor.

(2) Instead of paper copies of forms available from the District Manager or Regional Supervisor, you may use your own computer-generated forms that are equal in size to BSEE's forms. You must arrange the data on your form identical to the BSEE form. If you generate your own form and it omits terms and conditions contained on the official BSEE form, we will consider it to contain the omitted terms and conditions.

(3) You may submit digital data when the Region/District is equipped to accept it.

(b) When BSEE specifies, you must include, for public information, an additional copy of such reports.

(1) You must mark it Public Information

(2) You must include all required information, except information exempt from public disclosure under § 250.197 or otherwise exempt from public disclosure under law or regulation.

445 sections

Cite this law

OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF (U.S.C.). Retrieved via LawPlayer, https://lawplayer.com/us/act/cfr-title-30-part-250

United States government works (U.S. Code, Code of Federal Regulations) are in the public domain under 17 U.S.C. § 105.

US-Gov-PublicDomain

本頁資料來源:GPO govinfo / eCFR·整理提供:法律人 LawPlayer· lawplayer.com