The authority for this part derives from section 8 of the Outer Continental Shelf Lands Act (OCS Lands Act) (43 U.S.C. 1337). The Secretary of the Interior delegated to the Bureau of Ocean Energy Management (BOEM) the authority to manage the development of energy on the Outer Continental Shelf (OCS) from sources other than oil and gas, including renewable energy, through the issuance of leases, easements, and right-of-way for activities that produce or support the production, transportation, or transmission of energy.
資料由法律人 LawPlayer整理提供·U.S. federal law / curated by LawPlayer from GPO govinfo & eCFR
RENEWABLE ENERGY ON THE OUTER CONTINENTAL SHELF
The purpose of this part is to:
(a) Establish procedures for issuance and administration of leases, right-of-way (ROW) grants, and right-of-use and easement (RUE) grants for renewable energy production on the OCS;
(b) Inform you and third parties of your obligations when you undertake activities authorized in this part; and
(c) Ensure that renewable energy activities on the OCS are conducted in a safe and environmentally sound manner, in conformance with the requirements of subsection 8(p) of the OCS Lands Act, other applicable laws and regulations, and the terms of your lease, ROW grant, or RUE grant.
(d) This part will not convey access rights for oil, gas, or other minerals.
(a) BOEM will ensure that any activities authorized in this part are carried out in a manner that provides for and reaches a rational balance among the following goals to the extent they conflict or are otherwise in tension, none of which inherently outweighs or supplants any other:
(1) Safety;
(2) Protection of the environment;
(3) Prevention of waste, including economic waste and physical waste of energy resources from sources other than oil and gas;
(4) Conservation of the natural resources of the OCS;
(5) Coordination with relevant Federal agencies (including, in particular, those agencies involved in planning activities that are undertaken to avoid conflicts among users and to maximize the economic and ecological benefits of the OCS, including multifaceted spatial planning efforts);
(6) Protection of national security interests of the United States;
(7) Protection of the rights of other authorized users of the OCS;
(8) A fair return to the United States;
(9) Prevention of interference with reasonable uses of the exclusive economic zone, the high seas, and the territorial seas (as determined by the Secretary);
(10) Consideration of the location of and any schedule relating to a lease or grant under this part for an area of the OCS, and any other use of the sea or seabed;
(11) Public notice and comment on any proposal submitted for a lease or grant under this part; and
(12) Oversight, research, monitoring, and enforcement of activities authorized by a lease or grant under this part.
(b) BOEM will require compliance with all applicable laws, regulations, other requirements, and the terms of your lease or grant and approved plans under this part. BOEM will approve, disapprove, or approve with conditions any plans, applications, or other documents submitted to BOEM for approval under the provisions of this part.
(c) Unless otherwise provided in this part, BOEM may give oral directives or decisions whenever prior BOEM approval is required under this part. BOEM will document in writing any such oral directives within 10 business days.
(d) BOEM will establish practices and procedures to govern the collection of all payments due to the Federal Government required under the regulations of this part, including any cost recovery fees, rents, operating fees, and other fees or payments. BOEM will do this in accordance with the terms of this part, the leasing notice, the lease or grant under this part, and applicable Office of Natural Resources Revenue (ONRR) regulations or guidance.
(e) BOEM will provide for coordination and consultation with the Governor of any State, the executive of any local government, and the executive of any Indian Tribe that may be affected by a lease, easement, or ROW under this section. BOEM may invite any affected State Governor, representative of an affected Indian Tribe, and affected local government executive to join in establishing a task force or other joint planning or coordination agreement in carrying out our responsibilities under this part.
(a) BOEM may prescribe or approve departures from the provisions of this part when BOEM deems the departure necessary because the applicable provisions as applied to a specific circumstance:
(1) Are impractical or unduly burdensome and the departure is necessary to achieve the intended objectives of the renewable energy program;
(2) Fail to conserve the natural resources of the OCS;
(3) Fail to protect life (including human and wildlife), property, or the marine, coastal, or human environment; or
(4) Fail to protect sites, structures, or objects of historical or archaeological significance.
(b) Any departure approved under this section and its rationale must:
(1) Be consistent with subsection 8(p) of the OCS Lands Act;
(2) Protect the environment and the public health and safety to the same degree as if there was no approved departure from this part;
(3) Not impair the rights of third parties; and
(4) Be documented in writing.
Except as otherwise authorized by law, it is unlawful for any person to construct, operate, or maintain any facility to produce, transport, or support generation of electricity or other energy product derived from a renewable energy resource on any part of the OCS, except in accordance with the terms of a lease, easement, or ROW issued under the OCS Lands Act.
As a lessee, applicant, operator, or holder of a ROW or RUE grant, you must:
(a) Design your projects and conduct all activities in a manner that ensures safety and will not cause undue harm or damage to natural resources, including their physical, atmospheric, and biological components to the extent practicable; and take measures to prevent unauthorized discharge of pollutants including marine trash and debris into the offshore environment;
(b) Submit requests, applications, plans, notices, modifications, and supplemental information to BOEM as required by this part;
(c) Follow up, in writing, any oral request or notification you made, within 3 business days;
(d) Comply with all applicable laws and regulations, the terms of your lease or grant under this part, reports, notices, and approved plans prepared under this part, and any conditions imposed by BOEM through its review of any of these reports, notices, and approved plans, as provided in this part;
(e) Make all applicable payments on time;
(f) Comply with the DOI's nonprocurement debarment regulations at 2 CFR part 1400;
(g) Include the requirement to comply with 2 CFR part 1400 in all contracts and transactions related to a lease or grant under this part;
(h) Conduct all activities authorized by the lease or grant in a manner consistent with the provisions of subsection 8(p) of the OCS Lands Act;
(i) Compile, retain, and make available to BOEM representatives, within the time specified by BOEM, any data and information related to the site assessment, design, and operations of your project; and
(j) Respond to requests from the Director in a timely manner.
(a) BOEM may take appropriate corrective action under this part if you fail to comply with applicable provisions of Federal law, the regulations in this part, other applicable regulations, any order of the Director, the provisions of a lease or grant issued under this part, or the requirements of an approved plan or other approval under this part.
(b) BOEM may issue to you a notice of noncompliance if we determine that there has been a violation of the regulations in this part, any order of the Director, or any provision of your lease, grant, or other approval issued under this part. When issuing a notice of noncompliance, BOEM will serve you at your last known address.
(c) A notice of noncompliance will tell you how you failed to comply with this part, any order of the Director and/or the provisions of your lease, grant or other approval, and will specify what you must do to correct the noncompliance and the time limits within which you must act.
(d) Failure of a lessee, operator, or grant holder to take the actions specified in a notice of noncompliance issued under this part within the time limit specified provides the basis for issuance of a cessation order by BSEE, as provided in 30 CFR 285.401 and/or cancellation of the lease or grant by the Secretary as provided in § 585.422.
(e) BOEM may assess civil penalties, as authorized by section 24 of the OCS Lands Act and as determined under the procedures set forth in 30 CFR part 550, subpart N, if you fail to comply with any provision of this part or any term of a lease, grant, or order issued under the authority of this part:
(1) After notice of such failure and expiration of any reasonable period allowed for corrective action; or
(2) BOEM determines that the failure constitutes, or constituted, a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, or the marine, coastal, or human environment.
(a) You may acquire or hold a lease or grant under this part if you can demonstrate that you have the technical and financial capabilities to conduct the activities authorized by the lease or grant and you are a(n):
(1) Citizen or national of the United States;
(2) Alien lawfully admitted for permanent residence in the United States as defined in 8 U.S.C. 1101(a)(20);
(3) Private, public, or municipal corporations organized under the laws of any State of the United States, the District of Columbia, or any territory or insular possession subject to U.S. jurisdiction;
(4) Association of such citizens, nationals, resident aliens, or corporations;
(5) Executive agency of the United States as defined in 5 U.S.C. 105;
(6) State of the United States; or
(7) Political subdivision of a State of the United States.
(b) You may not acquire or hold a lease or grant under this part or acquire an interest in a lease or grant under this part if:
(1) You or your principals are excluded or disqualified from participating in transactions covered by the Federal nonprocurement debarment and suspension system (2 CFR part 1400), unless BOEM explicitly has approved an exception for this transaction;
(2) BOEM determines or has previously determined after notice and opportunity for a hearing that you or your principals have failed to meet or exercise due diligence under any OCS lease or grant; or
(3) After written notice and your opportunity to be heard, BOEM determines that:
(i) You no longer meet the qualification requirements for acquiring or holding a lease or grant in paragraph (a) of this section.
(ii) You have:
(A) Violated an applicable law, regulation, order, lease or grant provision, approved plan, or the prohibitions prescribed in a final sale notice; or otherwise engaged in illegal activity, anti-competitive or collusive behavior, fraud, or misrepresentation; and
(B) Failed to take timely remedial action as specified in the written notice provided by BOEM of the basis for the disqualification.
(c) As long as a party is excluded or disqualified from acquiring or holding a lease or grant under this part, it is also ineligible to participate in BOEM's competitive and noncompetitive lease or grant issuance processes, including auctions, conducted under this part, even as an agent for another entity. A party can restore its eligibility by completing the remedial action specified in the notice of the proposed disqualification.
(d) You may share ownership interests in a lease with one or more other persons, provided that all interest holders in the lease are eligible to hold a lease pursuant to this section and § 585.108.
(a) You must demonstrate your technical and financial capability to construct, operate, maintain, and terminate/decommission projects for which you are requesting authorization. Documentation can include:
(1) Descriptions of international or domestic experience with renewable energy projects or other types of electric-energy-related projects; and
(2) Information establishing access to sufficient capital to carry out development.
(b) An individual must submit a written statement of citizenship status attesting to U.S. citizenship. It does not need to be notarized nor give the age of individual. A resident alien may submit a photocopy of the U.S. Citizenship and Immigration Services form issued by the appropriate Federal immigration authority evidencing legal status as a resident alien.
(c) A corporation or association must submit evidence, as specified in the table in paragraph (d) of this section, acceptable to BOEM that:
(1) It is qualified to hold leases or grants under this part;
(2) It is authorized to conduct business under the laws of its State;
(3) It is authorized to hold leases or grants on the OCS under the operating rules of its business; and
(4) The persons holding the titles listed are authorized to bind the corporation or association when conducting business with BOEM.
(d) Acceptable evidence under paragraph (c) of this section includes, but is not limited to the following:
Requirements to qualify to hold leases or grants on the OCS:
Corp.
Ltd.
prtnsp.
Gen.
prtnsp.
LLC
Trust
(1) Original certificate or certified copy from the State of incorporation stating the name of the corporation exactly as it must appear on all legal documents
XX
(2) Certified statement by Secretary/Assistant Secretary over corporate seal, certifying that the corporation is authorized to hold OCS leases
XX
(3) Evidence of authority of titled positions to bind corporation, certified by Secretary/Assistant Secretary over corporate seal, including the following:
XX
(i) Certified copy of resolution of the board of directors with titles of officers authorized to bind corporation
(ii) Certified copy of resolutions granting corporate officer authority to issue a power of attorney
(iii) Certified copy of power of attorney or certified copy of resolution granting power of attorney
(4) Original certificate or certified copy of partnership or organization paperwork registering with the appropriate State official
XX
XX
XX
(5) Copy of articles of partnership or organization evidencing filing with appropriate Secretary of State, certified by Secretary/Assistant Secretary of partnership or member or manager of LLC
XX
XX
XX
(6) Original certificate or certified copy evidencing State where partnership or LLC is registered. Statement of authority to hold OCS leases, certified by Secretary/Assistant Secretary, OR original paperwork registering with the appropriate State official
XX
XX
XX
(7) Statements from each partner or LLC member indicating the following:
XX
XX
XX
(i) If a corporation or partnership, statement of State of organization and authorization to hold OCS leases, certified by Secretary/Assistant Secretary over corporate seal, if a corporation
(ii) If an individual, a statement of citizenship
(8) Statement from general partner, certified by Secretary/Assistant Secretary that:
XX
(i) Each individual limited partner is a U.S. citizen and;
(ii) Each corporate limited partner or other entity is incorporated or formed and organized under the laws of a U.S. State or territory
(9) Evidence of authority to bind partnership or LLC, if not specified in partnership agreement, articles of organization, or LLC regulations, i.e., certificates of authority from Secretary/Assistant Secretary reflecting authority of officers
XX
XX
XX
(10) Listing of members of LLC certified by Secretary/Assistant Secretary or any member or manager of LLC
XX
(11) Copy of trust agreement or document establishing the trust and all amendments, properly certified by the trustee with reference to where the original documents are filed
XX
(12) Statement indicating the law under which the trust is established and that the trust is authorized to hold OCS leases or grants
XX
(e) A local, State, or Federal executive entity must submit a written statement that:
(1) It is qualified to hold leases or grants under this part; and
(2) The person(s) acting on behalf of the entity is authorized to bind the entity when conducting business with us.
(f) BOEM may require you to submit additional information at any time considering your bid or request for a noncompetitive lease.
You must notify BOEM within 3 business days after you learn of any action filed alleging that you are insolvent or bankrupt.
You must notify BOEM in writing of any merger, name change, or change of business form. You must notify BOEM as soon as practicable following the merger, name change, or change in business form, but no later than 120 days after the earliest of either the effective date, or the date of filing the change or action with the Secretary of the State or other authorized official in the State of original registry.
Unless otherwise stated, you must submit one electronic copy of all plans, applications, reports, or notices required by this part to BOEM. BOEM will inform you if it requires paper copies of specific documents. Unless stated otherwise, documents should be submitted to the relevant contacts listed on the BOEM website.
(a) BOEM will charge a processing fee on a case-by-case basis under the procedures in this section with regard to any application or request under this part if we decide at any time that the preparation of a particular document or study is necessary for the application or request and it will have a unique processing cost, such as the preparation of an Environmental Assessment (EA) or Environmental Impact Statement (EIS).
(1) Processing costs will include contract oversight and efforts to review and approve documents prepared by contractors, whether the contractor is paid directly by the applicant or through BOEM.
(2) We may apply a standard overhead rate to direct processing costs.
(b) We will assess the ongoing processing fee for each individual application or request according to the following procedures:
(1) Before we process your application or request, we will give you a written estimate of the proposed fee based on reasonable processing costs.
(2) You may comment on the proposed fee.
(3) You may:
(i) Ask for our approval to perform, or to directly pay a contractor to perform, all or part of any document, study, or other activity according to standards we specify, thereby reducing our costs for processing your application or request; or
(ii) Ask to pay us to perform, or contract for, all or part of any document, study, or other activity.
(4) We will then give you the final estimate of the processing fee amount with payment terms and instructions after considering your comments and any BOEM-approved work you will do.
(i) If we encounter higher or lower processing costs than anticipated, we will re-estimate our reasonable processing costs following the procedures in paragraphs (b)(1) through (4) of this section, but we will not stop ongoing processing unless you do not pay in accordance with paragraph (b)(5) of this section.
(ii) Once processing is complete, we will refund to you the amount of money that we did not spend on processing costs.
(5) Consistent with the payment and billing terms provided in the final estimate, we will periodically estimate what our reasonable processing costs will be for a specific period and will bill you for that period. Payment is due to us 30 days after you receive your bill. We will stop processing your document if you do not pay the bill by the date payment is due. If a periodic payment turns out to be more or less than our reasonable processing costs for the period, we will adjust the next billing accordingly or make a refund. Do not deduct any amount from a payment without our prior written approval.
(6) You must pay the entire fee before we will issue the final document or take final action on your application or request.
(7) You may appeal our estimated processing costs in accordance with the regulations in § 585.118 and 43 CFR part 4. We will not process the document further until the appeal is resolved, unless you pay the fee under protest while the appeal is pending. If the appeal results in a decision changing the proposed fee, we will adjust the fee in accordance with this section. If we adjust the fee downward, we will not pay interest.
Terms used in this part have the meanings as defined in this section:
Affected local government means with respect to any activities proposed, conducted, or approved under this part or 30 CFR part 285, any locality:
(1) That is, or is proposed to be, the site of gathering, transmitting, or distributing electricity or other energy product, or is otherwise receiving, processing, refining, or transshipping product, or services derived from activities approved under this part or 30 CFR part 285;
(2) That is used, or is proposed to be used, as a support base for activities approved under this part or 30 CFR part 285; or
(3) In which there is a reasonable probability of significant effect on land or water uses from activities approved under this part, or 30 CFR part 285.
Affected State means with respect to any activities proposed, conducted, or approved under this part or 30 CFR part 285, any coastal State—
(1) That is, or is proposed to be, the site of gathering, transmitting, or distributing energy or is otherwise receiving, processing, refining, or transshipping products, or services derived from activities approved under this part or 30 CFR part 285;
(2) That is used, or is scheduled to be used, as a support base for activities approved under this part or 30 CFR part 285; or
(3) In which there is a reasonable probability of significant effect on land or water uses from activities approved under this part or 30 CFR part 285.
Archaeological resource means any material remains of human life or activities that are at least 50 years of age and that are of archaeological interest ( i.e., which are capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurement, controlled collection, analysis, interpretation, and explanation).
Best available and safest technology means the best available and safest technologies that BOEM determines to be economically feasible wherever failure of equipment would have a significant effect on safety, health, or the environment.
Best management practices mean practices recognized within their respective industry, or by government, as one of the best for achieving the desired output while reducing undesirable outcomes.
Bidding credits means the value assigned by BOEM, expressed in monetary terms, to the factors or actions demonstrated, or committed to, by a bidder at a BOEM lease auction during the competitive lease award process. The type(s) and value(s) of any bidding credit(s) awarded to any given bidder will be set forth in the Final Sale Notice.
BOEM means Bureau of Ocean Energy Management of the Department of the Interior.
BSEE means Bureau of Safety and Environmental Enforcement of the Department of the Interior.
Certified Verification Agent (CVA) means an individual or organization, experienced in the design, fabrication, and installation of offshore marine facilities or structures, who will conduct specified third-party reviews, inspections, and verifications in accordance with 30 CFR part 285.
Coastal environment means the physical atmospheric, and biological components, conditions, and factors which interactively determine the productivity, state, condition, and quality of the terrestrial ecosystem from the shoreline inward to the boundaries of the coastal zone.
Coastline means the same as the term “coast line” in section 2 of the Submerged Lands Act (43 U.S.C. 1301(c)).
Commercial activities means, under renewable energy leases and grants, all activities associated with the generation, storage, or transmission of electricity or other energy product from a renewable energy project on the OCS, and for which such electricity or other energy product is intended for distribution, sale, or other commercial use, except for electricity or other energy product distributed or sold pursuant to technology-testing activities on a limited lease. This term also includes activities associated with all stages of development, including initial site characterization and assessment, facility construction, and project decommissioning.
Commercial lease means a lease issued under this part that specifies the terms and conditions under which a person can conduct commercial activities.
Commercial operations means the generation of electricity or other energy product for commercial use, sale, transmission, or distribution from a commercial lease.
Critical Safety Systems and Equipment means safety systems and equipment designed to prevent or ameliorate fire, spillages, or other major accidents that could result in harm to health, safety, or the environment in the area of your facilities.
Decommissioning means removing BOEM and BSEE approved facilities and returning the site of the lease or grant to a condition that meets the requirements under subpart I of 30 CFR part 285.
Director means the Director of BOEM, or an official authorized to act on the Director's behalf.
Distance means the minimum great circle distance.
Eligible State means a coastal State having a coastline (measured from the nearest point) no more than 15 miles from the geographic center of a qualified project area.
Fabrication means the cutting, fitting, welding, or other assembly of project elements.
Facility means an installation that is permanently or temporarily attached to the seabed of the OCS. Facilities include any structures; devices; appurtenances; gathering, transmission, and distribution cables; pipelines; and permanently moored vessels. Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with one or more satellite or secondary installations, is a single facility. BOEM and BSEE may decide that the complexity of the installations justifies their classification as separate facilities.
Geographic center of a project means the centroid (geometric center point) of a qualified project area. The centroid represents the point that is the weighted average of coordinates of the same dimension, with the weights determined by a density function. For example, in the case of a project area shaped as a rectangle or other parallelogram, the geographic center would be that point where lines between opposing corners intersect. The geographic center of a project could be outside the project area itself if that area is irregularly shaped.
Governor means the Governor of a State or the person or entity lawfully designated by or under State law to exercise the powers granted to a Governor.
Grant means a right-of-way or a right-of-use and easement issued under the provisions of this part.
Human environment means the physical, social, and economic components, conditions, and factors that interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.
Lease means an agreement authorizing the use of a designated portion of the OCS for activities allowed under this part. The term also means the area covered by that agreement, when the context requires.
Lease area means an area on the OCS that BOEM has identified for leasing for potential development of renewable energy resources.
Lessee means the holder of a lease, a BOEM-approved assignee, and, when describing the conduct required of parties engaged in activities on the lease, it also refers to the operator and all persons authorized by the holder of the lease or operator to conduct activities on the lease.
Limited lease means a lease issued under this part that specifies the terms and conditions under which a person may conduct activities on the OCS that support the production of energy, but do not result in the production of electricity or other energy product for sale, distribution, or other commercial use exceeding a limit specified in the lease.
Marine environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the marine ecosystem. These include the waters of the high seas, the contiguous zone, transitional and intertidal areas, salt marshes, and wetlands within the coastal zone and on the OCS.
Miles means nautical miles, as opposed to statute miles.
Multiple factor auction means an auction that involves the use of bidding credits to incentivize goals or actions that support public policy objectives or maximize public benefits through the competitive leasing auction process. For any multiple factor auction, the monetary value of the bidding credits, if any, would be added to the value of the cash bid to determine the highest bidder.
Natural resources include, without limiting the generality thereof, renewable energy, oil, gas, and all other minerals (as defined in section 2(q) of the OCS Lands Act), and marine animal and marine plant life.
Operator means the individual, corporation, or association having control or management of activities on the lease or grant under this part. The operator may be a lessee, grant holder, or a contractor designated by the lessee or holder of a grant issued under this part.
Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside of the area of lands beneath navigable waters, as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301), whose subsoil and seabed appertain to the United States and are subject to its jurisdiction and control or within the exclusive economic zone of the United States and adjacent to any territory of the United States and does not include any area conveyed by Congress to a territorial government for administration.
Person means, in addition to a natural person, an association (including partnerships and joint ventures); a Federal agency; a State; a political subdivision of a State; a Native American Tribal government; or a private, public, or municipal corporation.
Project, for the purposes of defining the source of revenues to be shared, means a lease, ROW, RUE, or Alternate Use RUE on which the activities authorized under this part and/or 30 CFR part 285 or 586 are conducted on the OCS. The term “project” may be used elsewhere in this part to refer to these same authorized activities, the facilities used to conduct these activities, or to the geographic area of the project, i.e., the project area.
Project area means the geographic surface leased, or granted, for the purpose of a specific project. If OCS acreage is granted for a project under some form of agreement other than a lease ( i.e., a ROW or RUE), the Federal acreage granted would be considered the project area. To avoid distortions in the calculation of the geometric center of the project area, project easements issued under this part are not considered part of the qualified project's area.
Project Design Envelope (PDE) means a reasonable range of design parameters proposed in a lessee's plan for components of the project, such as type, dimensions, and number of wind turbine generators; foundation type; location of the export cable route; location of an onshore substation; location of the grid connection point; and construction methods and timing.
Project easement means an easement to which, upon approval of your Construction and Operations Plan (COP) or General Activities Plan (GAP), you are entitled as part of the lease for the purpose of installing, maintaining, repairing and replacing: gathering, transmission, and distribution, and inter-array cables; power and pumping stations; facility anchors; pipelines; and associated facilities and other appurtenances on the OCS as necessary for the full enjoyment of the lease.
Provisional winner means a bidder that BOEM determines at the conclusion of the auction to have submitted the winning bid. The provisional winner becomes the winning bidder after the favorable completion of BOEM's bid review, Department of Justice antitrust review, bidder obligations under § 585.225(b), and any appeals process under § 585.118(c).
Receipt, as used in this part to describe the time when a document is received by any party in the absence of documentation to the contrary, is deemed to have taken place:
(1)(i) Five (5) business days after the date the document was given to the U.S. Postal Service (or deposited in one of its mailboxes), properly addressed and with proper postage affixed, or was given to a delivery service (or deposited in one of its receptacles), properly addressed and with the delivery cost prepaid; or
(ii) On the date on which the document was properly addressed and sent electronically.
(2) This definition also applies to variants of the words “receipt” and “receive” where those terms are used in this part to describe the receipt of a document when the timing of receipt triggers a regulatory time period or consequence.
Renewable Energy means energy resources other than oil and gas and minerals as defined in 30 CFR part 580. Such resources include, but are not limited to, wind, solar, and ocean waves, tides, and current.
Revenues mean bonuses, rents, operating fees, and similar payments made in connection with a project or project area. It does not include administrative fees such as those assessed for cost recovery, civil penalties, and forfeiture of financial assurance.
Right-of-use and easement (RUE) grant means an easement issued by BOEM under this part that authorizes use of a designated portion of the OCS to support activities on a lease or other use authorization for renewable energy activities. The term also means the area covered by the authorization.
Right-of-way (ROW) grant means an authorization issued by BOEM under this part to use a portion of the OCS for the construction and use of a cable or pipeline for the purpose of gathering, transmitting, distributing, or otherwise transporting electricity or other energy product generated or produced from renewable energy, but does not constitute a project easement under this part. The term also means the area c
overed by the authorization.
Secretary means the Secretary of the Interior or an official authorized to act on the Secretary's behalf.
Significant archaeological resource means an archaeological resource that meets the criteria of significance for eligibility for listing in the National Register of Historic Places, as defined in 36 CFR 60.4.
Site assessment activities mean those initial activities conducted to assess an area on the OCS, such as resource assessment surveys ( e.g., meteorological and oceanographic) or technology testing, involving the installation of bottom-founded facilities.
We, us, and our refer to BOEM, or its possessive, depending on the context.
You and your means an applicant, lessee, the operator, or designated operator, ROW grant holder or RUE grant holder under this part, or the designated agent of any of these, or the possessive of each, depending on the context. The terms you and your also include contractors and subcontractors of the entities specified in the preceding sentence.
(a) BOEM will make data and information available in accordance with the requirements and subject to the limitations of the Freedom of Information Act (FOIA) (5 U.S.C. 552) and the regulations contained in 43 CFR part 2.
(b) BOEM will not release such data and information that we have determined is exempt from disclosure under exemption 4 of FOIA. We will review such data and information and objections of the submitter by the following schedule to determine whether release at that time will result in substantial competitive harm or disclosure of trade secrets.
If you have a . . .
Then BOEM will review data and information for possible
release:
(1) Commercial lease
At the earlier of:
(i) 3 years after the commencement of commercial operations; or
(ii) 3 years after the lease terminates.
(2) Limited lease
At 3 years after the lease terminates.
(3) ROW or RUE grant
At the earliest of:
(i) 10 years after the approval of the grant;
(ii) Grant termination; or
(iii) 3 years after the completion of construction activities.
(c) After considering any objections from the submitter, if we determine that release of such data and information will result in:
(1) No substantial competitive harm or disclosure of trade secrets, then the data and information will be released.
(2) Substantial competitive harm or disclosure of trade secrets, then the data and information will not be released at that time but will be subject to further review every 3 years thereafter.
(a) The Office of Management and Budget (OMB) has approved the information collection requirements in this part under 44 U.S.C. 3501, et seq., and assigned OMB Control Number 1010-0176. The table in paragraph (e) of this section lists the subparts in the rule requiring the information and its title, summarizes the reasons for collecting the information, and summarizes how BOEM uses the information.
(b) Respondents are primarily renewable energy applicants, lessees, ROW grant holders, RUE grant holders, Alternate Use RUE grant holders, and operators. The requirement to respond to the information collection in this part is mandated under subsection 8(p) of the OCS Lands Act. Some responses are also required to obtain or retain a benefit or may be voluntary.
(c) The Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq. ) requires us to inform the public that an agency may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.
(d) Comments regarding any aspect of the collections of information under this part, including suggestions for reducing the burden, should be sent to the Information Collection Clearance Officer, Bureau of Ocean Energy Management, 45600 Woodland Road, Sterling, VA 20166.
(e) BOEM is collecting this information for the reasons given in the following table:
30 CFR 585 subpart and title
Reasons for collecting information and how used
(1) Subpart A—General Provisions
To inform BOEM of actions taken to comply with general operational requirements on the OCS. To ensure that operations on the OCS meet statutory and regulatory requirements, are safe and protect the environment, and result in diligent development on OCS leases.
(2) Subpart B—The Renewable Energy Leasing Schedule
To enable BOEM to publish a proposed five-year leasing schedule for the OCS renewable energy program.
(3) Subpart C—Issuance of OCS Renewable Energy Leases
To provide BOEM with information needed to determine when to use a competitive process for issuing a renewable energy lease, to identify auction formats and bidding systems and variables that we may use when that determination is affirmative, and to determine the terms under which we will issue renewable energy leases.
(4) Subpart D—ROW Grants and RUE Grants for Renewable Energy Activities
To issue ROW grants and RUE grants for OCS renewable energy activities that are not associated with a BOEM-issued renewable energy lease.
(5) Subpart E—Lease and Grant Administration
To ensure compliance with regulations pertaining to a lease or grant, including designation of operator, assignment, segregation, consolidation, suspension, renewal, termination, relinquishment, and cancellation.
(6) Subpart F—Payments and Financial Assurance Requirements
To ensure that payments and financial assurance payments for renewable energy leases comply with subpart E.
(7) Subpart G—Plans and Information Requirements
To enable BOEM to comply with the National Environmental Policy Act (NEPA) (42 U.S.C. 4321 et seq. ), the Coastal Zone Management Act (CZMA) (16 U.S.C. 1451 et seq. ), and other Federal laws and to ensure the safety of the environment on the OCS.
BOEM may publish a request for information (RFI) in the Federal Register for the following reasons:
(a) To solicit information from industry, federally recognized Tribes, State and local agencies, and other interested entities for evaluating the offshore renewable energy industry, including the identification of potential challenges or obstacles to its continued development. An RFI may relate to the identification of environmental, technical, regulatory, or economic matters that promote or detract from continued development of renewable energy technologies on the OCS. BOEM may use the information received to refine its renewable energy program, including to facilitate OCS renewable energy development in a safe and environmentally responsible manner and to ensure a fair return to the United States for use of the OCS.
(b) To assess interest in leasing all or part of the OCS for activities authorized in this part.
(c) To determine whether there is competitive interest in a specific OCS renewable energy proposal received by BOEM, such as an unsolicited request for a lease under § 585.231(b) or a RUE or ROW grant under § 585.307(a).
(d) To seek other information that BOEM needs for this program.
If a court holds any provisions of this part or their applicability to any persons or circumstances invalid, the remainder of the provisions and their applicability to any persons or circumstances will not be affected.
(a) Except as stated in paragraph (c) of this section, any party adversely affected by a final decision issued by BOEM under this part may appeal that decision to the Interior Board of Land Appeals (IBLA), under 30 CFR part 590 and 43 CFR part 4, subpart E.
(b) Any final decision will remain in full force and effect during the pendency of an appeal unless a stay is granted under 43 CFR part 4.
(c) A bidder adversely affected by BOEM's determination of a provisional winner made under this part may appeal to the BOEM Director, but decisions determining a provisional winner may not be appealed to the IBLA.
(1) A bidder that elects to appeal a provisional winner selection decision must file a written appeal with the Director within 15 business days after receipt of the decision.
(2) Such appeal must be accompanied by a statement of reasons. Before reversing a provisional winner selection decision, the Director will provide the provisional winner a reasonable opportunity to respond in writing to the appellant's statement of reasons. The Director will issue a written determination either affirming or reversing the decision. The Director's decision is not appealable to the IBLA under this section.
(3) BOEM will not execute a lease or grant until the 15-business-day appeal period closes and all timely filed appeals are resolved.
(4) The review authority of the Office of Hearings and Appeals does not apply to either the provisional winner selection decisions made under this part or the Director's final determination affirming or reversing a provisional winner selection decision.
(a) A lease issued under this part grants the lessee the right, subject to obtaining the necessary approvals, including but not limited to those required under the FERC hydrokinetic licensing process, and complying with all provisions of this part, to occupy, and install and operate facilities on, a designated portion of the OCS for the purpose of conducting:
(1) Commercial activities; or
(2) Other limited activities that support, result from, or relate to the production of energy from a renewable energy source.
(b) A lease issued under this part confers on the lessee the right to one or more project easements without further competition for the purpose of installing gathering, transmission, and distribution cables; pipelines; and appurtenances on the OCS as necessary for the full enjoyment of the lease.
(1) You must apply for the project easement as part of your COP or GAP, as provided under subpart G of this part; and
(2) BOEM will incorporate your approved project easement in your lease as an addendum.
(c) A commercial lease issued under this part may be developed in phases, with BOEM approval as provided in § 585.238.
BOEM will issue leases on a competitive basis, as provided under §§ 585.210 through 585.226. However, if we determine after public notice of a proposed lease that there is no competitive interest, we will issue leases noncompetitively, as provided under §§ 585.230 through 585.232. We will issue leases on forms approved by BOEM and will include terms, conditions, and stipulations identified and developed as appropriate.
BOEM may issue commercial or limited leases for OCS activities under § 585.104. BOEM may issue a lease for OCS renewable energy research activities under § 585.239.
For leases issued under this part, through either the competitive or noncompetitive process, BOEM, prior to issuing the lease, will coordinate and consult with relevant Federal agencies (including, in particular, those agencies involved in planning activities that are undertaken to avoid or minimize conflicts among users and maximize the economic and ecological benefits of the OCS, including multifaceted spatial planning efforts), any affected federally recognized Indian Tribes, the Native Hawaiian Community or Alaska Native Corporations, as appropriate, the Governor of any affected State, and the executive of any affected local government, as directed by subsections 8(p)(4) and (7) of the OCS Lands Act or other relevant Federal laws. Federal statutes that require BOEM to consult with interested parties or Federal agencies or to respond to findings of those agencies include the Endangered Species Act (ESA) and the Magnuson-Stevens Fishery Conservation and Management Act. BOEM also engages in consultation with Tribal and State historic preservation officers pursuant to the National Historic Preservation Act (NHPA).
BOEM may offer any appropriately platted area of the OCS, as provided in § 585.205, for a renewable energy lease, except any area within the exterior boundaries of any unit of the National Park System, National Wildlife Refuge System, National Marine Sanctuary System, or any National Monument.
BOEM will prepare leasing maps and official protraction diagrams of areas of the OCS. The areas included in each lease will be in accordance with the appropriate leasing map or official protraction diagram.
(a) BOEM will determine the size for each lease based on the area required to accommodate the anticipated activities. The processes leading to both competitive and noncompetitive issuance of leases will provide public notice of the lease size adopted. We will delineate leases by using mapped OCS blocks or portions, or aggregations of blocks.
(b) The lease size includes the minimum area that will allow the lessee sufficient space to develop the project and manage activities in a manner that is consistent with the provisions of this part and 30 CFR part 285. The lease may include whole lease blocks or portions of a lease block.
(a) BOEM may publish an RFI under § 585.116.
(b) BOEM will award leases through a competitive lease award process unless competitive interest does not exist. BOEM will publish details for each auction and lease through appropriate notices in the Federal Register. Each competitive lease award process will include the following steps:
(1) Call for information and nominations (Call). BOEM will publish a Call in the Federal Register requesting information to determine qualifications of prospective bidders and interest in preliminarily identified OCS lease areas.
(2) Area identification. BOEM will identify OCS areas for leasing consideration and related analysis in consultation with appropriate Federal agencies, State and local governments, federally recognized Tribes, Alaska Native Claims Settlement Act (ANCSA) corporations, and other interested parties.
(3) Proposed Sale Notice (PSN). BOEM will publish a PSN, or a notice of its availability, in the Federal Register, announcing BOEM's intention to conduct an auction for prospective lease areas. The PSN will set forth provisions and information concerning the proposed auction and lease and will invite stakeholder comments.
(4) Final Sale Notice (FSN). BOEM will publish an FSN, or a notice of its availability, in the Federal Register setting forth final information concerning the auction and lease.
(5) Auction. BOEM will hold an auction under the regulations in this part and the FSN.
(6) Lease award. BOEM will award leases subsequent to the completion of the aforementioned steps under the regulations in this part and the FSN.
(a) The Call is a notice that BOEM will publish in the Federal Register requesting responses from stakeholders interested in bidding on designated OCS areas and comments from interested and potentially affected parties. The responses may inform the area identification process and will enable BOEM to determine whether there exists competitive interest in the proposed lease area. BOEM may request additional information from stakeholders related to environmental, economic, and other issues.
(b) The Call may include the following:
(1) The areas that BOEM has preliminarily identified for leasing consideration;
(2) A request for comments concerning geological conditions; archaeological sites on the seabed or nearshore; multiple uses of the proposed leasing area (including, for example, navigation, recreation, military, and fisheries); and other socioeconomic, biological, and environmental information;
(3) Request for comments regarding feasibility for development, including the energy resource and opportunity for grid connection;
(4) Possible lease terms and conditions;
(5) A request to potential bidders to nominate one or more areas for a commercial renewable energy lease within the preliminarily identified leasing areas. Such nominations must include:
(i) The specific OCS blocks that the respondent is interested in leasing;
(ii) A general description of the respondent's objectives and how respondent proposes to achieve those objectives;
(iii) A preliminary schedule of the respondent's proposed activities, including those potentially leading to commercial operations, to the extent known;
(iv) Information regarding respondent's coordination, or intent to coordinate, with any other entity for the purposes of acquiring a lease from BOEM, if applicable;
(v) Documentation demonstrating the respondent's qualification to acquire a lease or grant as specified in §§ 585.107 and 585.108;
(vi) Available and pertinent information concerning renewable energy and environmental conditions in the nominated areas, including energy and resource data and information used to evaluate the areas; and
(vii) Any additional information requested by BOEM in the Call;
(c) Respondents have 45 calendar days from the date the Call is published in the Federal Register to reply, unless BOEM specifies another time period of not less than 30 calendar days in the Call.
(d) BOEM may use the information received in response to a Call to:
(1) Identify lease areas;
(2) Develop options for its lease provisions ( e.g., stipulations, payments, terms, and conditions);
(3) Inform its environmental analysis conducted under applicable Federal requirements, including, but not limited to, NEPA, the Endangered Species Act (ESA) (16 U.S.C. 1531-1544), and the CZMA; and
(4) Determine whether competitive interest exists in all or a portion of any potential lease area. If BOEM determines no competitive interest exists, BOEM may follow the noncompetitive leasing process set forth in § 585.231(d) through (j).
(a) Area identification is the process by which BOEM delineates one or more OCS areas for leasing consideration and environmental analysis if the areas appear appropriate for renewable energy development. This process is based on an area's relevant attributes, such as other uses of the area, environmental factors or characteristics, stakeholder comments, industry nominations, feasibility for development, and other relevant information. BOEM consults with interested parties during this process as specified in § 585.210(b)(2).
(b) BOEM may consider areas nominated by respondents to a Call and other areas determined appropriate for leasing.
(c) For the identified areas, BOEM will evaluate:
(1) The potential effects of leasing the identified areas on the human, marine, and coastal environments;
(2) The feasibility of development; and
(3) Potential measures, including lease stipulations, to mitigate potential adverse impacts. Such measures are identified and refined through the area identification process, as well as through environmental review and consultations and published for comment in the Proposed Sale Notice.
(d) BOEM may hold public hearings on the environmental analyses associated with leasing the identified areas, after appropriate notice.
(e) At the end of the area identification, BOEM may offer selected areas for leasing.
(a) The PSN is a notice that BOEM will publish in the Federal Register for each prospective auction. The PSN will request public comment on the items listed in this section. Public comments will inform BOEM's decisions regarding auction format and lease terms and conditions. At a minimum, the PSN will include or describe the availability of information pertaining to:
(1) The proposed leases to be offered, including:
(i) The proposed lease areas, including size and location;
(ii) The proposed lease terms and conditions, including the proposed rental rate and operating fee rate;
(iii) Other proposed payment requirements, as applicable; and
(iv) Proposed requirements for performance under the lease, such as site-specific lease stipulations and environmental mitigation measures;
(2) Steps a bidder must take to obtain and maintain eligibility to participate in the auction (e.g., financial forms, bid deposits);
(3) The proposed availability and potential value of bidding credit(s), if any are offered, and the actions or commitments required to obtain them;
(4) A detailed description of the proposed auction format and procedures as further described in § 585.223;
(5) The maximum number or specific sets of lease areas that any given bidder may be allowed to bid on or to acquire in an auction, if applicable;
(6) Lease award procedures, including how and when a lease will be awarded and executed, and how BOEM will address unsuccessful bids and applications;
(7) A copy of, or a reference to, the official BOEM lease form; and
(8) Other relevant matters, as determined by BOEM.
(b) The PSN may be used to gauge competitive interest by requiring prospective bidders to reaffirm their intent to participate in the auction as a prerequisite for continued eligibility.
(c) A prospective bidder is encouraged to identify in its comments any specific proposed terms and conditions in the PSN that may preclude its participation in the auction.
(d) The PSN's public comment period is 60 calendar days from the date of its publication in the Federal Register, unless BOEM specifies another time period of not less than 30 calendar days in the PSN.
(e) BOEM will notify any potentially affected federally recognized Indian Tribes, States, local governments, and ANCSA corporations of the PSN's publication, and will provide copies of the PSN to these entities upon written request.
(a) The FSN is a notice that BOEM will publish in the Federal Register at least 30 calendar days before each prospective auction. The FSN will describe the final auction details and will include or describe the availability of information pertaining to:
(1) The leases to be offered, including:
(i) The lease areas, including size and location;
(ii) Lease terms and conditions, including the rental rate and the operating fee rate;
(iii) Other payment requirements, as applicable; and
(iv) Requirements for performance under the lease, including site-specific lease stipulations and environmental mitigation measures;
(2) Steps a bidder must take to ensure eligibility to participate in the auction (e.g. financial forms, bid deposits);
(3) The availability and potential value of bidding credit(s), if any are offered, and the actions or commitments required to obtain them.
(4) A detailed description of the auction format and procedures as further described in § 585.223;
(5) The maximum number or specific sets of lease areas that any given bidder may be allowed to bid on or to acquire in an auction, if applicable;
(6) Lease award procedures, including how and when a lease will be awarded and executed, and how BOEM will handle unsuccessful bids and applications;
(7) A copy of, or a reference to, the official BOEM lease form; and
(8) Other relevant matters as determined by BOEM.
(b) The terms of the FSN may differ from the proposed terms of the PSN.
(a) At any time BOEM has reason to believe that competitive interest in any lease area no longer exists before the area's auction, BOEM may issue a notice in the Federal Register, as described in § 585.116, requesting information regarding competitive interest in that area. BOEM will consider respondents' comments to determine whether competitive interest in that area remains. BOEM may decide to end the competitive process for any area if it determines that competitive interest no longer exists.
(b) If BOEM determines after considering respondents' comments to such a notice that competitive interest remains, BOEM will continue with the competitive process set forth in §§ 585.210 through 585.226.
(c) If BOEM determines at any time before the auction that only a single party remains interested in a lease area, BOEM may proceed either with the auction or with the noncompetitive process set forth in § 585.231(d) through (j) following payment by that party of the acquisition fee specified in § 585.502(a).
(a) BOEM will determine the highest bid, taking into account the combined value of the monetary (cash) component and the non-monetary component(s), represented by bidding credits. The PSN and FSN will explain the following details, if bidding credit(s) are available for that auction:
(1) Eligibility and application requirements;
(2) The value of each available bidding credit, which will be either a sum certain or a percentage of the bid; and
(3) Procedures for applying each available bidding credit to bids submitted during the auction.
(b) Eligibility for bidding credits must be established in advance of any lease auction, in accordance with the specifications of the FSN. Such eligibility may be based on actions that the bidder has already undertaken or actions that it has committed to undertake in the future, provided that BOEM has agreed to the terms by which such a commitment will be made. BOEM may offer bidding credits for any of the following:
(1) Power purchase agreements;
(2) Eligibility for, or applicability of, renewable energy credits or subsidies;
(3) Development agreements by a potential lessee that facilitate shared transmission solutions and grid interconnection;
(4) Technical merit, timeliness, or financing and economic considerations;
(5) Environmental considerations, public benefits, or compatibility with State and local needs;
(6) Agreements or commitments by the developer that would facilitate OCS renewable energy development or other OCSLA goals; or
(7) Any other factor or criteria to further development of offshore renewable energy, as identified by BOEM in the PSN and FSN.
(c) Before the auction, bidders seeking to use bidding credits must establish that they meet the eligibility criteria for each bidding credit according to the FSN provisions.
(d) Before the auction, BOEM will determine each bidder's eligibility for bidding credits, and the value of those bidding credits, and will inform each eligible bidder of the value of the bidding credits to which it may be entitled.
(e) A provisional winner who is awarded bidding credits must pay an amount equal to the cash component of its winning bid less any bid deposit retained by BOEM under § 585.501.
(a) BOEM will award leases competitively using an objective, fair, reasonable, and competitive auction process that provides a fair return to the United States. As described in the FSN, leases will be awarded to the highest bidder.
(b) BOEM may use any analog or digital method to conduct the auction. The specific process and procedural details for each auction will be noticed in the PSN and finalized in the FSN.
(a) If BOEM determines competitive interest exists to develop a renewable energy resource in any OCS area and decides to issue a lease for that area, BOEM will conduct an auction to award the lease.
(b) The auction's format, procedures, and other details will be specified in the FSN, as outlined in § 585.214. Possible auction formats include, but are not limited to, sealed bidding and ascending bidding.
(c) The FSN will specify the potential use of alternatives if the primary auction method, system, or mechanism malfunctions. Alternatively, BOEM may take action consistent with paragraph (d) of this section until the malfunction is resolved.
(d) Any time before a provisional winner is determined, BOEM may delay, suspend, or cancel an auction due to a natural or man-made disaster, technical malfunction, security breach, unlawful bidding activity, administrative necessity, or any other reason that BOEM determines may adversely affect the fair and efficient conduct of the auction. In its discretion, BOEM may restart the auction at whatever point it deems appropriate, reasonable, fair, and efficient for all participants; or, alternatively, BOEM may cancel the auction in its entirety.
(e) BOEM will determine the provisional winner for each lease area under the auction rules and bidding procedures prescribed in the FSN.
(a) Bidders must submit a deposit to participate in an auction under § 585.501(a), unless otherwise specified in the FSN. A provisional winner's bid deposit will be credited toward the balance due on its bid.
(b) Only bidders qualified by BOEM under §§ 585.107 and 585.108 are permitted to bid during an auction.
(c) Only an authorized agent may act on a bidder's behalf during an auction. Bidders must submit the names of their authorized agents to BOEM before the auction, as prescribed in the FSN.
(d) Each bidder must follow the auction process specified in the FSN and may not take any action to disrupt or alter the process beyond its intended function.
(e) A bidder is responsible for immediately contacting BOEM if it is unable to submit its bid for any reason during an auction. If a bidder fails to timely notify BOEM of its inability to bid, it may not dispute the auction or lease award on that basis. If a bidder timely notifies BOEM of its inability to submit a bid, BOEM, in its discretion, may suspend the auction, continue the auction using an alternative method, or continue the auction without the participation of the affected bidder.
(a) In addition to the information described in §§ 585.213 and 585.214, BOEM may provide the following auction information, as appropriate, in the PSN and FSN:
(1) Bidding instructions, procedures, and systems, including the bid variables. How the auction will be conducted and what systems and procedures will be utilized.
(2) Bid deposit. The amount a bidder must pay under § 585.501(a) to be eligible to bid. The FSN will prescribe the process and deadline for submitting a bid deposit.
(3) Mock auction. Notice of a practice auction before the actual auction. Only bidders eligible for the actual auction will be permitted to participate in the mock ( i.e., practice) auction.
(4) Auction date, starting time and location. The starting time will include the relevant time zone, and the location will indicate where the auction will take place.
(5) Minimum bid. The price at which the bidding will start.
(6) Information BOEM will release to bidders between rounds. This information may include prior round results and other updates.
(7) Tie-breaking provision. This provision describes the method that BOEM will use to break a tie between two or more identical high bids offered for the same lease area, or package of lease areas.
(8) Next highest bidder. The method that BOEM will use to determine the next highest bidder of a completed auction in the event the provisional winner fails to meet its obligations or is unable to acquire a lease for any reason, or if a competitively issued lease or any portion thereof is relinquished or cancelled within six months of the auction.
(b) The list in paragraph (a) of this section is not exhaustive. BOEM may include in the FSN any other information relevant to that auction.
(a) At the conclusion of the auction, BOEM will:
(1) Declare the bidding closed.
(2) Assess whether the bids meet the requirements of BOEM's regulations and the FSN. BOEM may disqualify bids based on this review.
(3) Under 43 U.S.C. 1337(c), provide the Department of Justice, in consultation with the Federal Trade Commission, the opportunity to conduct an antitrust review of the lease sale results. BOEM may disqualify bids based on the results of this review.
(4) BOEM will declare the provisional winner of each lease area.
(b) BOEM may reject any and all bids received, regardless of the amount offered.
(c) BOEM will accept or reject bids within 90 calendar days of auction closure; BOEM may extend that time by notice to bidders within 15 calendar days before the 90 calendar day period ends.
(d) BOEM will deem rejected any bid not accepted within the 90 calendar-day period, or any extension. BOEM will provide each rejected bidder a written explanation for the rejection and will refund, without interest, any monies deposited by the rejected bidder.
(e) BOEM may withdraw all or part of a lease area from the lease sale between auction closure and lease execution. In the event that a portion of the lease area is withdrawn, the provisional winner has the option to refuse the lease without penalty, to propose new lease terms for BOEM's concurrence, or to accept the lease with the reduced area.
(f) BOEM may re-auction any lease area or portions thereof that remain unsold at the conclusion of an auction. BOEM may restart the competitive leasing process at any point in the process set forth in § 585.210 that it deems reasonable and appropriate ( e.g., Call, area identification, PSN, or FSN).
(a) BOEM will identify and notify the lease area's provisional winner of the amount due on each winning bid, which equals the cash component of the provisional winner's bid less its bid deposit retained by BOEM under § 585.501. BOEM will provide an unsigned copy of the lease to the provisional winner.
(b) Within 10 business days after receipt of the unsigned copy, or as otherwise specified by BOEM under paragraph (d) of this section, the provisional winner must:
(1) Execute the lease and return it to BOEM;
(2) File financial assurance as required by §§ 585.516 through 585.529; and
(3) Pay the amount due.
(c) When the bid deposit exceeds the amount due, BOEM will refund the overage without interest.
(d) A provisional winner may request in writing an extension of the 10-day time limit in paragraph (b) of this section. BOEM, in its discretion, may grant such a request.
(e) BOEM will execute the lease by signing the lease on behalf of the United States only after the provisional winner completes the requirements in paragraph (b) of this section and any appeals timely filed under § 585.118(c)(1) have been resolved. After BOEM executes the lease, the provisional winner becomes the winning bidder, and BOEM will send the winning bidder an electronic version of the fully executed copy of the lease. The lease takes effect as set forth in § 585.237.
(f) The winning bidder must pay the first 12 months' rent under § 585.503(a) within 45 calendar days after receiving a copy of the executed lease from BOEM.
(g) In the event that a lessee does not meet the commitments it made to obtain any bidding credits, the lessee will be required to repay the value of the bidding credits that it received adjusted for inflation.
(a) If BOEM determines that a provisional winner has failed to timely complete the steps outlined in § 585.225(b) or § 585.316, or has otherwise failed to comply with applicable laws, regulations, or FSN provisions, BOEM may take one or more of the following actions:
(1) Decline to execute the applicable lease.
(2) Decline to execute the lease for any other lease areas that the provisional winner won during the auction.
(3) Require forfeiture of the bid deposit. In the event the bid deposit exceeds the amount of the winning bid, BOEM would limit the required forfeiture to the lesser amount.
(4) Refer the matter to the Department of the Interior's Administrative Remedies Division for suspension or debarment review pursuant to 2 CFR part 180 as implemented at 2 CFR part 1400.
(5) Pursue any other remedy available.
(b) If BOEM declines to execute a lease with the provisional winner under paragraph (a) of this section, BOEM may decide to select a new provisional winner by either repeating the auction under § 585.224(f), or pursuant to the procedures in § 585.223(a)(8), by selecting the next highest bid submitted during the auction, or by using other procedures specified in the FSN.
(c) BOEM's decisions under this section are appealable under § 585.118.
You may submit an unsolicited request for a commercial lease or a limited lease under this part. Your unsolicited request must contain the following information:
(a) The area you are requesting for lease.
(b) A general description of your objectives and the facilities that you would use to achieve those objectives.
(c) A general schedule of proposed activities including those leading to commercial operations.
(d) Available and pertinent data and information concerning renewable energy and environmental conditions in the area of interest, including energy and resource data and information used to evaluate the area of interest. BOEM will withhold trade secrets and commercial or financial information that is privileged or confidential from public disclosure under exemption 4 of the FOIA and as provided in § 585.114.
(e) If available from the appropriate State or local government authority, a statement that the proposed activity conforms with State and local energy planning requirements, initiatives, or guidance.
(f) Documentation showing that you meet the qualifications to become a lessee, as specified in §§ 585.107 and 585.108.
(g) An acquisition fee, as specified in § 585.502(a).
(a) BOEM will consider unsolicited requests for a lease on a case-by-case basis and may issue a lease noncompetitively in accordance with this part. BOEM will issue a lease noncompetitively only if it has determined after public notice that no competitive interest exists. BOEM will not consider an unsolicited request for a lease under this part that is proposed in a lease area that is scheduled for a lease auction under this part.
(b) At BOEM's discretion, BOEM may issue an RFI under § 585.116 relating to your unsolicited lease request and will consider comments received to determine if competitive interest exists. If BOEM decides not to issue an RFI and, therefore, not to continue processing your unsolicited lease request, it will refund your acquisition fee.
(c) If BOEM determines that competitive interest exists in the lease area:
(1) BOEM will proceed with the competitive process set forth in §§ 585.210 through 585.226;
(2) If you submit a bid for the lease area in a competitive lease sale, your acquisition fee will be applied to the deposit for your bonus bid; and
(3) If you do not submit a bid for the lease area in a competitive lease sale, BOEM will not refund your acquisition fee.
(d) If BOEM determines that there is no competitive interest in a lease and that further investigation of the area is in the public interest, it will:
(1) Publish in the Federal Register a determination of no competitive interest.
(2) Prepare and provide you with a written estimate of the proposed fee to pay for the processing costs under § 585.112, including any environmental review that BOEM may require before lease issuance.
(3) Conduct environmental reviews required by Federal law and consult with affected Federal agencies, federally recognized Indian Tribes, and State and local governments.
(e) The following deadlines apply after issuance of a determination of no competitive interest:
(1) Within 90 calendar days of receiving the written estimate of the fee, or longer (as determined at BOEM's discretion), you must pay the fee for any environmental review under § 585.112. Failure to pay the required fee may result in withdrawal of the determination of no competitive interest.
(2) A determination of no competitive interest expires two years after its publication, unless BOEM determines that it should be extended for good cause. BOEM reserves the right to withdraw a determination of no competitive interest before it expires if BOEM determines that you have failed to exercise due diligence in obtaining a lease.
(f) After BOEM publishes the determination of no competitive interest, you will be responsible for submitting any consistency certification and necessary data and information in a timely manner to the applicable State CZMA agencies and BOEM pursuant to 15 CFR part 930, subpart D.
(g) After completing its review of your lease request, BOEM may offer you a noncompetitive lease.
(h) If you accept the terms and conditions of the lease, BOEM will issue the lease. You must comply with the terms and conditions of your lease and the applicable provisions of this part. If BOEM issues you a lease, BOEM will send you an electronic copy of the lease form.
(1) Within 10 business days after you receive the lease you must:
(i) Execute and return the lease; and
(ii) File financial assurance as required under §§ 585.516 through 585.529.
(2) You must pay the first 12 months' rent no later than 45 calendar days after you receive your copy of the executed lease from BOEM under § 585.503(a)(1).
(i) BOEM will publish in the Federal Register a notice announcing the issuance of your lease.
(j) If you do not accept the terms and conditions in a timely manner, BOEM will not issue a lease. Additionally, if you do not comply with the requirements for financial assurance, BOEM may decide not to issue a lease. If BOEM does not issue a lease due to your noncompliance or non-acceptance, BOEM will not refund your acquisition fee, or any fees paid under paragraph (e)(1) of this section.
(a) If you submit an area of interest for a possible lease and BOEM receives no competing submissions in response to the RFI or Call, we may inform you that there does not appear to be competitive interest, and ask if you wish to proceed with acquiring a lease.
(b) If you wish to proceed with acquiring a lease, you must submit your acquisition fee as specified in § 585.502(a).
(c) After receiving the acquisition fee, BOEM will follow the process outlined in § 585.231(d) through (j).
(a) The lease periods within the term of your commercial lease are defined as follows:
(1) Preliminary period. Each commercial lease has a preliminary period of up to five years. During the preliminary period, the lessee must submit a COP. The preliminary period begins on the effective date of the lease and ends either when a COP is received by BOEM for review or at the expiration of five years, whichever occurs first.
(2) COP review period. A commercial lease has a COP review period. The COP review period begins when BOEM receives a COP from the lessee and ends upon COP approval, disapproval, or approval with conditions pursuant to § 585.628. During the COP review period, BOEM conducts the necessary reviews and consultations associated with the COP.
(3) Design and construction period. The design and construction period begins at COP approval and ends when the operations period begins. During the design and construction period BSEE completes the FDR and FIR review(s), and the lessee undertakes project construction.
(4) Operations period. A commercial lease has an operations period of 35 years; or the duration specified in the lease; or the duration included and approved as part of your COP. The operations period begins when the requirements of 30 CFR 285.637(a) are met through the submission of final reports and records for your project. Additional time may be added to the operations period through a lease suspension under § 585.415 issued during this period; a lease extension requested pursuant to paragraph (b) of this section; or a lease renewal under § 585.425.
(b) You may request an extension of any of the lease periods outlined in paragraph (a) of this section for good cause, including if the project is designed and verified for a longer duration. In its discretion, BOEM may approve your request.
(c) If you intend to develop your lease in phases under § 585.238, you must propose lease period schedules for each phase in your COP.
(d) If you intend to segregate or consolidate your lease under §§ 585.408 through 585.413, you and your assignees may propose lease period schedules in your segregation or consolidation application.
(a) For limited leases, the lease periods are as shown in the following table:
Lease period
Extension or suspension
Requirements
(1) Each limited lease has a preliminary period of 12 months within which to submit a GAP. The preliminary period begins on the effective date of the lease
If we receive a GAP that satisfies the requirements of §§ 585.640 through 585.648, the preliminary period will be automatically extended for the period of time necessary for us to conduct a technical and environmental review of the GAP
The GAP must meet the requirements of §§ 585.640 through 585.648.
(2) Each limited lease has an operations period as specified by BOEM (if the lease is issued competitively) or negotiated with the applicant (if the lease is issued noncompetitively). In either case, the duration of the operations period will depend on the intended use of the lease. The operations period begins on the date that we approve your GAP
We may order or grant a suspension of the operations period as provided in §§ 585.415 through 585.421
(b) You may request an extension of any of the lease periods outlined in paragraph (a) of this section for good cause. In its discretion, BOEM may approve your request.
(a) A lease issued under this part must be dated and becomes effective as of the first day of the month following the date a lease is signed by the lessor.
(b) If the lessee submits a written request and BOEM approves, a lease may be dated and become effective the first day of the month in which it is signed by the lessor.
In your COP, you may request development of your commercial lease in phases. In support of your request, you must provide details as to what portions of the lease will be initially developed for commercial operations and what portions of the lease will be reserved for subsequent phased development. You must also propose a lease period schedule for each phase described in your COP in accordance with § 585.235(c). BOEM may condition its approval of subsequent phases described in a phased development COP.
(a) The Director may issue OCS leases, ROW grants, and RUE grants to a Federal agency or a State for renewable energy research activities that support the future production, transportation, or transmission of renewable energy.
(b) In issuing leases, ROW grants, and RUE grants to a Federal agency or a State on the OCS for renewable energy research activities under this section, BOEM will coordinate and consult with other relevant Federal agencies, affected federally recognized Indian Tribes, any other affected State(s), and affected local government executives.
(c) BOEM may issue leases, RUEs, and ROWs for research activities managed by a Federal agency or a State only in areas for which the Director has determined, after public notice and opportunity to comment, that no competitive interest exists.
(d) The Director and the head of the Federal agency or the Governor of a requesting State, or their authorized representatives, will negotiate the terms and conditions of such renewable energy leases, RUEs, or ROWs under this section on a case-by-case basis. The framework for such negotiations, and standard terms and conditions of such leases, RUEs, or ROWs may be set forth in a memorandum of agreement (MOA) or other agreement between BOEM and a Federal agency or a State. The MOA must include the agreement of the head of the Federal agency or the Governor to assure that all subcontractors comply with this part and 30 CFR part 285, other applicable laws, and terms and conditions of such leases or grants.
(e) Any lease, RUE, or ROW that BOEM issues to a Federal agency or to a State that authorizes access to an area of the OCS for research activities managed by a Federal agency or a State must include:
(1) Requirements to comply with all applicable Federal laws; and
(2) Requirements to comply with this part and 30 CFR part 285, except as otherwise provided in the lease or grant.
(f) BOEM will issue a public notice of any lease, RUE, or ROW issued to a Federal agency or to a State, or an approved MOA for such research activities.
(g) BOEM will not charge any fees for the purpose of ensuring a fair return for the use of such research areas on the OCS.
(a) A ROW grant authorizes the holder to install on the OCS cables, pipelines, and associated facilities that involve the transportation or transmission of electricity or other energy product from renewable energy projects.
(b) A RUE grant authorizes the holder to construct and maintain facilities or other installations on the OCS that support the production, transportation, or transmission of electricity or other energy product from any renewable energy resource.
(c) You do not need a ROW grant or RUE grant for a project easement authorized under § 585.200(b) to serve your lease.
(a) A ROW grant:
(1) Includes the full length of the corridor on which a cable, pipeline, or associated facility is located;
(2) Is of a width sufficient to accommodate potential changes at the design and installation phases of the project, with an option for the grant holder to relinquish unused portions of the ROW after construction is complete; and
(3) For the associated facilities, is limited to the area reasonably necessary for a power or pumping station or other facilities requested.
(b) A RUE grant includes the site on which a facility or other structure is located and the areal extent of anchors, chains, and other equipment associated with a facility or other structure. The specific boundaries of a RUE will be determined by BOEM on a case-by-case basis and set forth in each RUE grant.
Cite this law
RENEWABLE ENERGY ON THE OUTER CONTINENTAL SHELF (U.S.C.). Retrieved via LawPlayer, https://lawplayer.com/us/act/cfr-title-30-part-585
United States government works (U.S. Code, Code of Federal Regulations) are in the public domain under 17 U.S.C. § 105.
本頁資料來源:GPO govinfo / eCFR·整理提供:法律人 LawPlayer· lawplayer.com