This part establishes uniform policies and procedures for the DoD Components' award and administration of technology investment agreements (TIAs).
資料由法律人 LawPlayer整理提供·U.S. federal law / curated by LawPlayer from GPO govinfo & eCFR
TECHNOLOGY INVESTMENT AGREEMENTS
Whether your TIA is a cooperative agreement or another type of assistance transaction, as discussed in Appendix B to this part, the terms and conditions of the agreement must provide for recipients' compliance with applicable Federal statutes and regulations. This appendix lists some of the more common requirements to aid you in identifying ones that apply to your TIA. The list is not intended to be all-inclusive, however, and you may need to consult legal counsel to verify whether there are others that apply in your situation ( e.g. , due to a provision in the appropriations act for the specific funds that you are using or due to a statute or rule that applies to a particular program or type of activity).
A. Certifications
One requirement that applies to all TIAs currently requires you to obtain a certification at the time of proposal. That requirement is in a Governmentwide common rule about lobbying prohibitions, which is implemented by the DoD at 32 CFR part 28. The prohibitions apply to all financial assistance. Appendix A to 32 CFR part 22 includes a sample provision that you may use, to have proposers incorporate the certification by reference into their proposals.
B. Assurances That Apply to All TIAs
DoD policy is to use a certification, as described in the preceding paragraph, only for a national policy requirement that specifically requires one. The usual approach to communicating other national policy requirements to recipients is to incorporate them as award terms or conditions, or assurances. Part 1122 of 2 CFR lists national policy requirements that commonly apply to DoD grants and cooperative agreements. It also has standard wording of general terms and conditions to incorporate the requirements in award documents. Of those requirements, the following six apply to all TIAs. (Note that TIAs must generally use the standard wording in 2 CFR part 1122 for the terms and conditions of these six requirements, but not the standard format.)
1. Requirements concerning debarment and suspension in the OMB guidance in 2 CFR part 180, as implemented by the DoD at 2 CFR part 1125. The requirements apply to all nonprocurement transactions.
2. Requirements concerning drug-free workplace in the Governmentwide common rule that the DoD has codified at 32 CFR part 26. The requirements apply to all financial assistance.
3. Prohibitions on discrimination on the basis of race, color, or national origin in Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d, et seq. ), as implemented by DoD regulations at 32 CFR part 195. These apply to all financial assistance. They require recipients to flow down the prohibitions to any subrecipients performing a part of the substantive research program (as opposed to suppliers from whom recipients purchase goods or services).
4. Prohibitions on discrimination on the basis of age, in the Age Discrimination Act of 1975 (42 U.S.C. 6101, et seq. ). They apply to all financial assistance and require flow down to subrecipients, as implemented by Department of Health and Human Services regulations at 45 CFR part 90.
5. Prohibitions on discrimination on the basis of handicap, in section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by Department of Justice regulations at 28 CFR part 41 and DoD regulations at 32 CFR part 56. They apply to all financial assistance recipients and require flow down to subrecipients.
6. Preferences for use of U.S.-flag air carriers in the International Air Transportation Fair Competitive Practices Act of 1974 (49 U.S.C. 40118), commonly referred to as the “Fly America Act,” and implementing regulations at 41 CFR 301-10.131 through 301-10.143, which apply to uses of U.S. Government funds.
C. Other National Policy Requirements
Additional national policy requirements may apply in certain circumstances, as follows:
1. If construction work is to be done under a TIA or its subawards, it is subject to the prohibitions in Executive Order 11246, as amended, on discrimination on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin. You must include the clause provided in 41 CFR 60-1.4(b) in any “federally assisted construction contract” (as defined in 41 CFR 60-1.3) under this award unless provisions of 41 CFR part 60-1 exempt the contract from the requirement. The clause will require the contractor to comply with equal opportunity requirements in 41 CFR chapter 60.
2. If the research involves human subjects or animals, it is subject to the applicable requirements identified in appendix C of 2 CFR part 1122.
3. If the research involves actions that may affect the human environment, it is subject to the requirements of the National Environmental Policy Act in paragraph A.4.a of NP Article II, which is found in appendix B of 2 CFR part 1122. It also may be subject to one or more of the other requirements in paragraphs A.4.b through A.4.f, A.5, and A.6 of NP Article II, which concern flood-prone areas, coastal zones, coastal barriers, wild and scenic rivers, underground sources of drinking water, endangered species, and marine mammal protection.
4. If the project may impact any property listed or eligible for listing on the National Register of Historic Places, it is subject to the National Historic Preservation Act of 1966 (54 U.S.C. 306108) as specified in paragraph 11.a of NP Article IV, which is found in appendix D of 2 CFR part 1122.
5. If the project has potential under this award for irreparable loss or destruction of significant scientific, prehistorical, historical, or archeological data, it is subject to the Archaeological and Historic Preservation Act of 1974 (54 U.S.C. Chapter 3125) as specified in paragraph 11.b of NP Article IV, which is found in appendix D of 2 CFR part 1122.
A. As discussed in § 37.705, you must inform recipients of any national policy requirements that flow down to their purchases of goods or services ( e.g., supplies or equipment) under their TIAs. Note that purchases of goods or services differ from subawards, which are for substantive research program performance.
B. Appendix A to 32 CFR part 34 lists ten national policy requirements that commonly apply to firms' purchases under grants or cooperative agreements. Of those ten, two that apply to all recipients' purchases under TIAs are:
1. Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). A contractor submitting a bid to the recipient for a contract award of $100,000 or more must file a certification with the recipient that it has not and will not use Federal appropriations for certain lobbying purposes. The contractor also must disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. For further details, see 32 CFR part 28, the DoD's codification of the Governmentwide common rule implementing this amendment.
2. Debarment and suspension. A contract award with an amount expected to equal or exceed $25,000 and certain other contract awards (see 2 CFR 1125.220, which implements OMB guidance at 2 CFR 180.220) shall not be made to parties identified in the Exclusions area of the System for Award Management (SAM Exclusions) as being currently debarred, suspended, or otherwise excluded. This restriction is in accordance with the DoD adoption at 2 CFR part 1125 of the OMB guidance implementing E.O.s 12549 (3 CFR, 1986 Comp., p. 189) and 12689 (3 CFR, 1989 Comp., p. 235), “Debarment and Suspension.”
C. The following requirements apply to recipient's purchases under TIAs in the situations specified below:
1. Equal Employment Opportunity. Although construction work should happen rarely under a TIA, the agreements officer in that case should inform the recipient that Department of Labor regulations at 41 CFR 60-1.4(b) prescribe a clause that must be incorporated into recipients' and subrecipients' construction contracts under their awards and subawards, respectively. Further details are provided in appendix B to part 22 of the DoDGARs (32 CFR part 22), in section b. under the heading “Nondiscrimination.” any “federally assisted construction contract” (as defined in 41 CFR 60-1.3) under the award unless provisions of 41 CFR part 60-1 exempt the contract from the requirement. The clause will require the contractor to comply with equal opportunity requirements in 41 CFR chapter 60.
2. Wage Rate Requirements (Construction), formerly the Davis Bacon Act. When required by Federal program legislation, you must take the following actions with respect to each construction contract for more than $2,000 to be awarded using funding provided under this award:
a. Place in the solicitation under which the contract will be awarded a copy of the current prevailing wage determination issued by the Department of Labor;
b. Condition the decision to award the contract upon the contractor's acceptance of that prevailing wage determination;
c. Include in the contract the clauses specified at 29 CFR 5.5(a) in Department of Labor regulations (29 CFR part 5, “Labor Standards Provisions Applicable to Contracts Governing Federally Financed and Assisted Construction”) to require the contractor's compliance with the Wage Rate Requirements (Construction), as amended (40 U.S.C. 3141-44, 3146, and 3147); and
d. Report all suspected or reported violations to the award administration office identified in this award.
3. Fly America requirements. In each contract under which funds provided under this award might be used to participate in costs of international air travel or transportation for people or property, you must include a clause to require the contractor to:
a. Comply with the International Air Transportation Fair Competitive Practices Act of 1974 (49 U.S.C. 40118, also known as the “Fly America” Act), as implemented by the General Services Administration at 41 CFR 301-10.131 through 301-10.143, which provides that U.S Government financed international air travel and transportation of personal effects or property must use a U.S. Flag air carrier or be performed under a cost sharing arrangement with a U.S. carrier, if such service is available; and
b. Include the requirements of the Fly America Act in all subcontracts that might involve international air transportation.
4. Cargo preference for United States flag vessels. In each contract under which equipment, material, or commodities may be shipped by oceangoing vessels, you must include the clause specified in Department of Transportation regulations at 46 CFR 381.7(b) to require that at least 50 percent of equipment, materials or commodities purchased or otherwise obtained with Federal funds under this award, and transported by ocean vessel, be transported on privately owned U.S. flag commercial vessels, if available.
No, this part covers only TIAs, some of which use the authority of 10 U.S.C. 2371 ( see appendix B to this part). This part does not cover assistance instruments other than TIAs that use the authority of 10 U.S.C. 2371. It also does not cover acquisition agreements for prototype projects that use 10 U.S.C. 2371 authority augmented by the authority in section 845 of Public Law 103-160, as amended.
TIAs are assistance instruments used to stimulate or support research. As discussed in appendix B to this part, a TIA may be either a kind of cooperative agreement or a type of assistance transaction other than a grant or cooperative agreement.
The ultimate goal for using TIAs, like other assistance instruments used in defense research programs, is to foster the best technologies for future defense needs. TIAs differ from and complement other assistance instruments available to agreements officers, in that TIAs address the goal by fostering civil-military integration ( see appendix A to this part). TIAs therefore are designed to:
(a) Reduce barriers to commercial firms' participation in defense research, to give the Department of Defense (DoD) access to the broadest possible technology and industrial base.
(b) Promote new relationships among performers in both the defense and commercial sectors of that technology and industrial base.
(c) Stimulate performers to develop, use, and disseminate improved practices.
Your office may award or administer TIAs if it has a delegation of the authorities in 10 U.S.C. 2371, as well as 10 U.S.C. 2358. If your office is in a Military Department, it must have a delegation of the authority of the Secretary of that Military Department under those statutes. If your office is in a Defense Agency, it must have a delegation of the authority of the Secretary of Defense under 10 U.S.C. 2358 and 2371. Your office needs those authorities to be able to:
(a) Enter into cooperative agreements to stimulate or support research, using the authority of 10 U.S.C. 2358, as well as assistance transactions other than grants or cooperative agreements, using the authority of 10 U.S.C. 2371. The reason that both authorities are needed is that a TIA, depending upon its patent rights provision ( see appendix B to this part), may be either a cooperative agreement or a type of assistance transaction other than a grant or cooperative agreement.
(b) Recover funds from a recipient and reuse the funds for program purposes, as authorized by 10 U.S.C. 2371 and described in § 37.580.
(c) Exempt certain information received from proposers from disclosure under the Freedom of Information Act, as authorized by 10 U.S.C. 2371 and described in § 37.420.
(a) You must have specific authorization to award or administer TIAs. Being authorized to award or administer grants and cooperative agreements is not sufficient; a grants officer is an agreements officer only if the statement of appointment also authorizes the award or administration of TIAs.
(b) You receive that authorization in the same way that you receive authority to award other assistance instruments, as described in 32 CFR 21.425 and 21.435 through 21.445.
(a) TIAs are explicitly covered in this part and part 21 of the DoD Grant and Agreement Regulations (DoDGARs). Part 21 (32 CFR part 21) addresses deviation procedures and other general matters that relate to the DoDGARs, to DoD Components' authorities and responsibilities for assistance instruments, and to requirements for reporting information about assistance awards.
(b) Two additional parts of the DoDGARs apply to TIAs, although they do not mention TIAs explicitly. They are:
(1) Part 1125 (2 CFR part 1125) on nonprocurement debarment and suspension, which applies because it covers nonprocurement instruments in general;
(2) Part 26 (32 CFR part 26), on drug-free workplace requirements, which applies because it covers financial assistance in general; and
(3) Part 28 (32 CFR part 28), on lobbying restrictions, which applies by law (31 U.S.C. 1352) to TIAs that are cooperative agreements and as a matter of DoD policy to all other TIAs.
(c) Portions of other DoDGARs parts apply to TIAs only as cited by reference in this part.
You must ensure that you use TIAs only in appropriate situations. To do so, you must conclude that the use of a TIA is justified based on:
(a) The nature of the project, as discussed in § 37.205;
(b) The type of recipient, addressed in § 37.210;
(c) The recipient's commitment and cost sharing, as described in § 37.215;
(d) The degree of involvement of the Government program official, as discussed in § 37.220; and
(e) Your judgment that the use of a TIA could benefit defense research objectives in ways that likely would not happen if another type of assistance instrument were used. Your answers to the four questions in § 37.225 should be the basis for your judgment.
You must:
(a) Conclude that the principal purpose of the project is stimulation or support of research ( i.e., assistance), rather than acquiring goods or services for the benefit of the Government ( i.e., acquisition);
(b) Decide that the basic, applied, or advanced research project is relevant to the policy objective of civil-military integration ( see appendix A of this part); and
(c) Ensure that, to the maximum extent practicable, any TIA that uses the authority of 10 U.S.C. 2371 ( see appendix B of this part) does not support research that duplicates other research being conducted under existing programs carried out by the Department of Defense. This is a statutory requirement of 10 U.S.C. 2371.
(d) When your TIA is a type of assistance transaction other than a grant or cooperative agreement, satisfy the condition in 10 U.S.C. 2371 to judge that the use of a standard grant or cooperative agreement for the research project is not feasible or appropriate. As discussed in appendix B to this part:
(1) This situation arises if your TIA includes a patent provision that is less restrictive than is possible under the Bayh-Dole statute (because the patent provision is what distinguishes a TIA that is a cooperative agreement from a TIA that is an assistance transaction other than a grant or cooperative agreement).
(2) You satisfy the requirement to judge that a standard cooperative agreement is not feasible or appropriate when you judge that execution of the research project warrants a less restrictive patent provision than is possible under Bayh-Dole.
(a) As a matter of DoD policy, you may award a TIA only when one or more for-profit firms are to be involved either in the:
(1) Performance of the research project; or
(2) The commercial application of the research results. In that case, you must determine that the nonprofit performer has at least a tentative agreement with specific for-profit partners who plan on being involved when there are results to transition. You should review the agreement between the nonprofit and for-profit partners, because the for-profit partners' involvement is the basis for using a TIA rather than another type of assistance instrument.
(b) Consistent with the goals of civil-military integration, TIAs are most appropriate when one or more commercial firms (as defined at § 37.1250) are to be involved in the project.
(c) You are encouraged to make awards to consortia (a consortium may include one or more for-profit firms, as well as State or local government agencies, institutions of higher education, or other nonprofit organizations). The reasons are that:
(1) When multiple performers are participating as a consortium, they are more equal partners in the research performance than usually is the case with a prime recipient and subawards. All of them therefore are more likely to be directly involved in developing and revising plans for the research effort, reviewing technical progress, and overseeing financial and other business matters. That feature makes consortia well suited to building new relationships among performers in the defense and commercial sectors of the technology and industrial base, a principal objective for the use of TIAs.
(2) In addition, interactions among the participants within a consortium potentially provide a self-governance mechanism. The potential for additional self-governance is particularly good when a consortium includes multiple for-profit participants that normally are competitors within an industry.
(d) TIAs also may be used for carrying out research performed by single firms or multiple performers in prime award-subaward relationships. In awarding TIAs in those cases, however, you should consider providing for greater involvement of the program official or a way to increase self-governance ( e.g., a prime award with multiple subawards arranged so as to give the subrecipients more insight into and authority and responsibility for programmatic and business aspects of the overall project than they usually have).
(a) You should judge that the recipient has a strong commitment to and self-interest in the success of the project. You should find evidence of that commitment and interest in the proposal, in the recipient's management plan, or through other means. A recipient's self-interest might be driven, for example, by a research project's potential for fostering technology to be incorporated into products and processes for the commercial marketplace.
(b) You must seek cost sharing. The purpose of cost share is to ensure that the recipient incurs real risk that gives it a vested interest in the project's success; the willingness to commit to meaningful cost sharing therefore is one good indicator of a recipient's self-interest. The requirements are that:
(1) To the maximum extent practicable, the non-Federal parties carrying out a research project under a TIA are to provide at least half of the costs of the project. Obtaining this cost sharing, to the maximum extent practicable, is a statutory condition for any TIA under the authority of 10 U.S.C. 2371, and is a matter of DoD policy for all other TIAs.
(2) The parties must provide the cost sharing from non-Federal resources that are available to them unless there is specific authority to use other Federal resources for that purpose ( see § 37.530(f)).
(c) You may consider whether cost sharing is impracticable in a given case, unless there is a non-waivable, statutory requirement for cost sharing that applies to the particular program under which the award is to be made. Before deciding that cost sharing is impracticable, you should carefully consider whether there are other factors that demonstrate the recipient's self-interest in the success of the current project.
(a) TIAs are used to carry out cooperative relationships between the Federal Government and the recipient, which requires a greater level of involvement of the Government program official in the execution of the research than the usual oversight of a research grant or procurement contract. For example, program officials will participate in recipients' periodic reviews of research progress and will be substantially involved with the recipients in the resulting revisions of plans for future effort. That increased programmatic involvement before and during program execution with a TIA can reduce the need for some Federal financial requirements that are problematic for commercial firms.
(b) Some aspects of their involvement require program officials to have greater knowledge about and participation in business matters that traditionally would be your exclusive responsibility as the agreements officer. TIAs therefore also require closer cooperation between program officials and you, as the one who decides business matters.
Before deciding that a TIA is appropriate, you also must judge that using a TIA could benefit defense research objectives in ways that likely would not happen if another type of assistance instrument were used ( e.g., a cooperative agreement subject to all of the requirements of 32 CFR part 34). You, in conjunction with Government program officials, must consider the questions in paragraphs (a) through (d) of this section, to help identify the benefits that may justify using a TIA and reducing some of the usual requirements. In accordance with § 37.1020, you must document your answers to these questions in the award file. Note that you must give full concise answers only to questions that relate to the benefits that you perceive for using the TIA, rather than another type of funding instrument, for the particular research project. A simple “no” or “not applicable” is a sufficient response for other questions. The questions are:
(a) Will the use of a TIA permit the involvement in the research of any commercial firms or business units of firms that would not otherwise participate in the project? If so:
(1) What are the expected benefits of those firms' or divisions' participation (e.g., is there a specific technology that could be better, more readily available, or less expensive)?
(2) Why would they not participate if an instrument other than a TIA were used? You should identify specific provisions of the TIA or features of the TIA award process that enable their participation.
(b) Will the use of a TIA allow the creation of new relationships among participants at the prime or subtier levels, among business units of the same firm, or between non-Federal participants and the Federal Government that will help the DoD get better technology in the future? If so:
(1) Why do these new relationships have the potential for helping the DoD get technology in the future that is better, more affordable, or more readily available?
(2) Are there provisions of the TIA or features of the TIA award process that enable these relationships to form? If so, you should be able to identify specifically what they are. If not, you should be able to explain specifically why you think that the relationships could not be created if an assistance instrument other than a TIA were used.
(c) Will the use of a TIA allow firms or business units of firms that traditionally accept Government awards to use new business practices in the execution of the research that will help us get better technology, help us get new technology more quickly or less expensively, or facilitate partnering with commercial firms? If so:
(1) What specific benefits will the DoD potentially get from the use of these new practices? You should be able to explain specifically why you foresee a potential for those benefits.
(2) Are there provisions of the TIA or features of the TIA award process that enable the use of the new practices? If so, you should be able to identify those provisions or features and explain why you think that the practices could not be used if the award were made using an assistance instrument other than a TIA.
(d) Are there any other benefits of the use of a TIA that could help the Department of Defense better meet its objectives in carrying out the research project? If so, you should be able to identify specifically what they are, how they can help meet defense objectives, what features of the TIA or award process enable the DoD to realize them, and why the benefits likely would not be realized if an assistance instrument other than a TIA were used.
In accordance with 32 CFR 22.205(b), you may not use a TIA if any participant is to receive fee or profit. Note that this policy extends to all performers of the research project carried out under the TIA, including any subawards for substantive program performance, but it does not preclude participants' or subrecipients' payment of reasonable fee or profit when making purchases from suppliers of goods ( e.g., supplies and equipment) or services needed to carry out the research.
The fundamental difference between an expenditure-based and fixed-support TIA is that:
(a) For an expenditure-based TIA, the amounts of interim payments or the total amount ultimately paid to the recipient are based on the amounts the recipient expends on project costs. If a recipient completes the project specified at the time of award before it expends all of the agreed-upon Federal funding and recipient cost sharing, the Federal Government may recover its share of the unexpended balance of funds or, by mutual agreement with the recipient, amend the agreement to expand the scope of the research project. An expenditure-based TIA therefore is analogous to a cost-type procurement contract or grant.
(b) For a fixed-support TIA, the amount of assistance established at the time of award is not meant to be adjusted later if the research project is carried out to completion. In that sense, a fixed-support TIA is somewhat analogous to a fixed-price procurement contract (although “price,” a concept appropriate to a procurement contract for buying a good or service, is not appropriate for a TIA or other assistance instrument for stimulation or support of a project).
You may use a fixed-support TIA if:
(a) The agreement is to support or stimulate research with outcomes that are well defined, observable, and verifiable;
(b) You can reasonably estimate the resources required to achieve those outcomes well enough to ensure the desired level of cost sharing ( see example in § 37.560(b)); and
(c) Your TIA does not require a specific amount or percentage of recipient cost sharing. In cases where the agreement does require a specific amount or percentage of cost sharing, a fixed-support TIA is not practicable because the agreement has to specify cost principles or standards for costs that may be charged to the project; require the recipient to track the costs of the project; and provide access for audit to allow verification of the recipient's compliance with the mandatory cost sharing. You therefore must use an expenditure-based TIA if you:
(1) Have a non-waivable requirement ( e.g., in statute) for a specific amount or percentage of recipient cost sharing; or
(2) Have otherwise elected to include in the TIA a requirement for a specific amount or percentage of cost sharing.
In general, you must use an expenditure-based TIA under conditions other than those described in § 37.305. Reasons for any exceptions to this general rule must be documented in the award file and must be consistent with the policy in § 37.230 that precludes payment of fee or profit to participants.
In situations where the use of fixed-support TIAs is permissible (see §§ 37.305 and 37.310), their use may encourage some commercial firms' participation in the research. With a fixed-support TIA, you can eliminate or reduce some post-award requirements that sometimes are cited as disincentives for those firms to participate. For example, a fixed-support TIA need not:
(a) Specify minimum standards for the recipient's financial management system.
(b) Specify cost principles or standards stating the types of costs the recipient may charge to the project.
(c) Provide for financial audits by Federal auditors or independent public accountants of the recipient's books and records.
(d) Set minimum standards for the recipient's purchasing system.
(e) Require the recipient to prepare financial reports for submission to the Federal Government.
DoD policy is to award TIAs using merit-based, competitive procedures, as described in 32 CFR 22.315:
(a) In every case where required by statute; and
(b) To the maximum extent practicable in all other cases.
Your announcement, to be considered as part of a competitive procedure, must include the basic information described in 32 CFR 22.315(a). Additional elements for you to consider in the case of a program that may use TIAs are described in §§ 37.410 through 37.420.
Yes, once you consider the factors described in subpart B of this part and decide that TIAs are among the types of instruments that you may award pursuant to a solicitation, it is important for you to state that fact in the solicitation. You also should state that TIAs are more flexible than traditional Government funding instruments and that provisions are negotiable in areas such as audits and intellectual property rights that may cause concern for commercial firms. Doing so should increase the likelihood that commercial firms will be willing to submit proposals.
To help ensure a competitive process that is fair and equitable to all potential proposers, you should state clearly in the solicitation:
(a) That, to the maximum extent practicable, the non-Federal parties carrying out a research project under a TIA are to provide at least half of the costs of the project (see § 37.215(b)).
(b) The types of cost sharing that are acceptable;
(c) How any in-kind contributions will be valued, in accordance with §§ 37.530 through 37.555; and
(d) Whether you will give any consideration to alternative approaches a proposer may offer to demonstrate its strong commitment to and self-interest in the project's success, in accordance with § 37.215.
Your solicitation should tell potential proposers that:
(a) For all TIAs, information described in paragraph (b) of this section is exempt from disclosure requirements of the Freedom of Information Act (FOIA)(codified at 5 U.S.C. 552) for a period of five years after the date on which the DoD Component receives the information from them.
(b) As provided in 10 U.S.C. 2371, disclosure is not required, and may not be compelled, under FOIA during that period if:
(1) A proposer submits the information in a competitive or noncompetitive process that could result in their receiving a cooperative agreement for basic, applied, or advanced research under the authority of 10 U.S.C. 2358 or any other type of transaction authorized by 10 U.S.C. 2371 (as explained in appendix B to this part, that includes all TIAs); and
(2) The type of information is among the following types that are exempt:
(i) Proposals, proposal abstracts, and supporting documents; and
(ii) Business plans and technical information submitted on a confidential basis.
(c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure requirements, they must mark them with a legend identifying them as documents submitted on a confidential basis. After the five-year period, information may be protected for longer periods if it meets any of the criteria in 5 U.S.C. 552(b) (as implemented by the DoD in subpart C of 32 CFR part 286) for exemption from FOIA disclosure requirements.
(a) You must determine the qualification of the recipient, as described in §§ 37.510 and 37.515.
(b) As the business expert working with the program official, you also must address the financial aspects of the proposed agreement. You must:
(1) Determine that the total amount of funding for the proposed effort is reasonable, as addressed in § 37.520.
(2) Assess the value and determine the reasonableness of the recipient's proposed cost sharing contribution, as discussed in §§ 37.525 through 37.555.
(3) If you are contemplating the use of a fixed-support rather than expenditure-based TIA, ensure that its use is justified, as explained in §§ 37.560 and 37.565.
(4) Address issues of inconsistent cost accounting by traditional Government contractors, should they arise, as noted in § 37.570.
(5) Determine amounts for milestone payments, if you use them, as discussed in § 37.575.
Administrative agreements officers of the Defense Contract Management Agency and the Office of Naval Research can share lessons learned from administering other TIAs. Program officials can be a source of information when you are determining the reasonableness of proposed funding ( e.g., on labor rates, as discussed in § 37.520) or establishing observable and verifiable technical milestones for payments ( see § 37.575). Auditors at the Defense Contract Audit Agency can act in an advisory capacity to help you determine the reasonableness of proposed amounts, including values of in-kind contributions toward cost sharing.
Prior to award of a TIA, your responsibilities for determining that the recipient is qualified are the same as those of a grants officer who is awarding a grant or cooperative agreement. Those responsibilities are described in subpart D of 32 CFR part 22. When the recipient is a consortium that is not formally incorporated, you have the additional responsibility described in § 37.515.
(a) When the prospective recipient of a TIA is a consortium that is not formally incorporated, your determination that the recipient meets the standard at 32 CFR 22.415(a) requires that you, in consultation with legal counsel, review the management plan in the consortium's collaboration agreement. The purpose of your review is to ensure that the management plan is sound and that it adequately addresses the elements necessary for an effective working relationship among the consortium members. An effective working relationship is essential to increase the research project's chances of success.
(b) The collaboration agreement, commonly referred to as the articles of collaboration, is the document that sets out the rights and responsibilities of each consortium member. It binds the individual consortium members together, whereas the TIA binds the Government and the consortium as a group (or the Government and a consortium member on behalf of the consortium, as explained in § 37.1015). The document should discuss, among other things, the consortium's:
(1) Management structure.
(2) Method of making payments to consortium members.
(3) Means of ensuring and overseeing members' efforts on the project.
(4) Provisions for members' cost sharing contributions.
(5) Provisions for ownership and rights in intellectual property developed previously or under the agreement.
In cooperation with the program official, you must assess the reasonableness of the total estimated budget to perform the research that will be supported by the agreement. Additional guidance follows for:
(a) Labor. Much of the budget likely will involve direct labor and associated indirect costs, which may be represented together as a “loaded” labor rate. The program official is an essential advisor on reasonableness of the overall level of effort and its composition by labor category. You also may rely on your experience with other awards as the basis for determining reasonableness. If you have any unresolved questions, two of the ways that you might find helpful in establishing reasonableness are to:
(1) Consult the administrative agreements officers or auditors identified in § 37.505.
(2) Compare loaded labor rates of for-profit firms that do not have expenditure-based Federal procurement contracts or assistance awards with a standard or average for the particular industry. Note that the program official may have knowledge about customary levels of direct labor charges in the particular industry that is involved. You may be able to compare associated indirect charges with Government-approved indirect cost rates that exist for many nonprofit and for-profit organizations that have Federal procurement contracts or assistance awards (note the requirement in § 37.630 for a for-profit participant to use Federally approved provisional indirect cost rates, if it has them).
(b) Real property and equipment. In almost all cases, the project costs may include only depreciation or use charges for real property and equipment of for-profit participants, in accordance with § 37.685. Remember that the budget for an expenditure-based TIA may not include depreciation of a participant's property as a direct cost of the project if that participant's practice is to charge the depreciation of that type of property as an indirect cost, as many organizations do.
You must:
(a) Determine that the recipient's cost sharing contributions meet the criteria for cost sharing and determine values for them, in accordance with §§ 37.530 through 37.555. In doing so, you must:
(1) Ensure that there are affirmative statements from any third parties identified as sources of cash contributions.
(2) Include in the award file an evaluation that documents how you determined the values of the recipient's contributions to the funding of the project.
(b) Judge that the recipient's cost sharing contribution, as a percentage of the total budget, is reasonable. To the maximum extent practicable, the recipient must provide at least half of the costs of the project, in accordance with § 37.215.
You may accept any cash or in-kind contributions that meet all of the following criteria:
(a) In your judgment, they represent meaningful cost sharing that demonstrates the recipient's commitment to the success of the research project. Cash contributions clearly demonstrate commitment and they are strongly preferred over in-kind contributions.
(b) They are necessary and reasonable for accomplishment of the research project's objectives.
(c) They are costs that may be charged to the project under § 37.625 and § 37.635, as applicable to the participant making the contribution.
(d) They are verifiable from the recipient's records.
(e) They are not included as cost sharing contributions for any other Federal award.
(f) They are not paid by the Federal Government under another award, except:
(1) Costs that are authorized by Federal statute to be used for cost sharing; or
(2) Independent research and development (IR&D) costs, as described at 32 CFR 34.13(a)(5)(ii), that meet all of the criteria in paragraphs (a) through (e) of this section. IR&D is acceptable as cost sharing, even though it may be reimbursed by the Government through other awards. It is standard business practice for all for-profit firms, including commercial firms, to recover their research and development (R&D) costs (which for Federal procurement contracts is recovered as IR&D) through prices charged to their customers. Thus, the cost principles at 48 CFR part 31 allow a for-profit firm that has expenditure-based, Federal procurement contracts to recover through those procurement contracts the allocable portion of its R&D costs associated with a technology investment agreement.
You rarely should accept values for cost sharing contributions of real property or equipment that are in excess of depreciation or reasonable use charges, as discussed in § 37.685 for for-profit participants. You may accept the full value of a donated capital asset if the real property or equipment is to be dedicated to the project and you expect that it will have a fair market value that is less than $5,000 at the project's end. In those cases, you should value the donation at the lesser of:
(a) The value of the property as shown in the recipient's accounting records ( i.e., purchase price less accumulated depreciation); or
(b) The current fair market value. You may accept the use of any reasonable basis for determining the fair market value of the property. If there is a justification to do so, you may accept the current fair market value even if it exceeds the value in the recipient's records.
You should limit the value of any contribution of a fully depreciated asset to a reasonable use charge. In determining what is reasonable, you must consider:
(a) The original cost of the asset;
(b) Its estimated remaining useful life at the time of your negotiations;
(c) The effect of any increased maintenance charges or decreased performance due to age; and
(d) The amount of depreciation that the participant previously charged to Federal awards.
No, you may not count any participant's costs of prior research as a cost sharing contribution. Only the additional resources that the recipient will provide to carry out the current project (which may include pre-award costs for the current project, as described in § 37.830) are to be counted.
(a) In most instances, you should not count costs of patents and other intellectual property ( e.g., copyrighted material, including software) as cost sharing, because:
(1) It is difficult to assign values to these intangible contributions;
(2) Their value usually is a manifestation of prior research costs, which are not allowed as cost share under § 37.545; and
(3) Contributions of intellectual property rights generally do not represent the same cost of lost opportunity to a recipient as contributions of cash or tangible assets. The purpose of cost share is to ensure that the recipient incurs real risk that gives it a vested interest in the project's success.
(b) You may include costs associated with intellectual property if the costs are based on sound estimates of market value of the contribution. For example, a for-profit firm may offer the use of commercially available software for which there is an established license fee for use of the product. The costs of the development of the software would not be a reasonable basis for valuing its use.
For types of participant contributions other than those addressed in §§ 37.535 through 37.550, the general rule is that you are to value each contribution consistently with the cost principles or standards in § 37.625 and § 37.635 that apply to the participant making the contribution. When valuing services and property donated by parties other than the participants, you may use as guidance the provisions of 32 CFR 34.13(b)(2) through (5).
(a) To use a fixed-support TIA, rather than an expenditure-based TIA, you must have confidence in your estimate of the expenditures required to achieve well-defined outcomes. Therefore, you must work carefully with program officials to select outcomes that, when the recipient achieves them, are reliable indicators of the amount of effort the recipient expended. However, your estimate of the required expenditures need not be a precise dollar amount, as illustrated by the example in paragraph (b) of this section, if:
(1) The recipient is contributing a substantial share of the costs of achieving the outcomes, which must meet the criteria in § 37.305(a); and
(2) You are confident that the costs of achieving the outcomes will be at least a minimum amount that you can specify and the recipient is willing to accept the possibility that its cost sharing percentage ultimately will be higher if the costs exceed that minimum amount.
(b) To illustrate the approach, consider a project for which you are confident that the recipient will have to expend at least $800,000 to achieve the specified outcomes. You must determine, in conjunction with program officials, the minimum level of recipient cost sharing that you want to negotiate, based on the circumstances, to demonstrate the recipient's commitment to the success of the project. For purposes of this illustration, let that minimum recipient cost sharing be 40% of the total project costs. In that case, the Federal share should be no more than 60% and you could set a fixed level of Federal support at $480,000 (60% of $800,000). With that fixed level of Federal support, the recipient would be responsible for the balance of the costs needed to complete the project.
(c) Note, however, that the level of recipient cost sharing you negotiate is to be based solely on the level needed to demonstrate the recipient's commitment. You may not use a shortage of Federal Government funding for the program as a reason to try to persuade a recipient to accept a fixed-support TIA, rather than an expenditure-based instrument, or to accept responsibility for a greater share of the total project costs than it otherwise is willing to offer. If you lack sufficient funding to provide an appropriate Federal Government share for the entire project, you instead should rescope the effort covered by the agreement to match the available funding.
Yes, for a research project that is to be carried out by a number of participants, you may award a TIA that provides for some participants to perform under fixed-support arrangements and others to perform under expenditure-based arrangements. This approach may be useful, for example, if a commercial firm that is a participant will not accept an agreement with all of the post-award requirements of an expenditure-based award. Before using a fixed-support arrangement for that firm's portion of the project, you must judge that it meets the criteria in § 37.305.
(a) If a participant has Federal procurement contracts that are subject to the Cost Accounting Standards (CAS) in part 30 of the Federal Acquisition Regulation (FAR) and the associated FAR Appendix (48 CFR part 30 and 48 CFR 9903.201-1, respectively), you must alert the participant during the pre-award negotiations to the potential for a CAS violation, as well as the cognizant administrative contracting officer (ACO) for the participant's procurement contracts, if you learn that the participant plans to account differently for its own share and the Federal Government's share of project costs under the TIA. This may arise, for example, if a for-profit firm or other organization subject to the FAR cost principles in 48 CFR parts 31 and 231 proposes to charge:
(1) Its share of project costs as independent research and development (IR&D) costs to enable recovery of the costs through Federal Government procurement contracts, as allowed under the FAR cost principles; and
(2) The Federal Government's share to the project, rather than as IR&D costs.
(b) The reason for alerting the participant and the ACO is that the inconsistent charging of the two shares could cause a noncompliance with Cost Accounting Standard (CAS) 402. Noncompliance with CAS 402 is a potential issue only for a participant that has CAS-covered Federal procurement contracts (note that CAS requirements do not apply to a for-profit participant's TIAs).
(c) For for-profit participants with CAS-covered procurement contracts, the cognizant ACO in most cases will be an individual within the Defense Contract Management Agency (DCMA). You can identify a cognizant ACO at the DCMA by querying the contract administration team locator that matches contractors with their ACOs (currently on the World Wide Web at http://alerts.dcmdw.dcma.mil/support, a site that also can be accessed through the DCMA home page at http://www.dcma.mil).
(a) If you select the milestone payment method ( see § 37.805), you must assess the reasonableness of the estimated amount for reaching each milestone. This assessment enables you to set the amount of each milestone payment to approximate the Federal share of the anticipated resource needs for carrying out that phase of the research effort.
(b) The Federal share at each milestone need not be the same as the Federal share of the total project. For example, you might deliberately set payment amounts with a larger Federal share for early milestones if a project involves a start-up company with limited resources.
(c) For an expenditure-based TIA, if you have minimum percentages that you want the recipient's cost sharing to be at the milestones, you should indicate those percentages in the agreement or in separate instructions to the post-award administrative agreements officer. That will help the administrative agreements officer decide when a project's expenditures have fallen too far below the original projections, requiring adjustments of future milestone payment amounts ( see § 37.1105(c)).
(d) For fixed-support TIAs, the milestone payments should be associated with the well-defined, observable and verifiable technical outcomes ( e.g., demonstrations, tests, or data analysis) that you establish for the project in accordance with §§ 37.305(a) and 37.560(a).
(a) Recovery of funds refers to the use of the authority in 10 U.S.C. 2371 to include a provision in certain types of agreements, including TIAs, that require a recipient to make payments to the Department of Defense or another Federal agency as a condition of the agreement. Recovery of funds is a good tool in the right circumstances, at the discretion of the agreements officer and the awarding organization, but its purpose is not to augment program budgets. It may be used to recover funds provided to a recipient through a TIA or another Federal procurement or assistance instrument, and the recovery should not exceed the amounts provided. Recovery of funds is distinct from program income, as described in § 37.835.
(b) In accordance with 10 U.S.C. 2371, as implemented by policy guidance from the Office of the Under Secretary of Defense (Comptroller), the payment amounts may be credited to an existing account of the Department of Defense and used for the same program purposes as other funds in that account.
(c) Before you use the authority to include a provision for recovery of funds, note that 10 U.S.C. 2371 requires you to judge that it would not be feasible or appropriate to use for the research project a standard grant or cooperative agreement (in this instance, a “standard cooperative agreement” means a cooperative agreement without a provision for recovery of funds). You satisfy that 10 U.S.C. 2371 requirement when you judge that execution of the research project warrants inclusion of a provision for recovery of funds.
This subpart addresses “systemic” administrative matters that place requirements on the operation of a participant's financial management, property management, or purchasing system. Each participant's systems are organization-wide and do not vary with each agreement. Therefore, all TIAs should address systemic requirements in a uniform way for each type of participant organization.
The general policy for expenditure-based TIAs is to avoid requirements that would force participants to use different financial management, property management, and purchasing systems than they currently use for:
(a) Expenditure-based Federal procurement contracts and assistance awards in general, if they receive them; or
(b) Commercial business, if they have no expenditure-based Federal procurement contracts and assistance awards.
If it is an expenditure-based award, your TIA must require participants to flow down the same financial management, property management, and purchasing systems requirements to a subrecipient that would apply if the subrecipient were a participant. For example, a for-profit participant would flow down to a university subrecipient the requirements that apply to a university participant. Note that this policy applies to subawards for substantive performance of portions of the research project supported by the TIA, and not to participants' purchases of goods or services needed to carry out the research.
(a) To avoid causing needless changes in participants' financial management systems, your expenditure-based TIAs will make for-profit participants that currently perform under other expenditure-based Federal procurement contracts or assistance awards subject to the same standards for financial management systems that apply to those other awards. Therefore, if a for-profit participant has expenditure-based DoD assistance awards other than TIAs, your TIAs are to apply the standards in 32 CFR 34.11. You may grant an exception and allow a for-profit participant that has other expenditure-based Federal Government awards to use an alternative set of standards that meets the minimum criteria in paragraph (b) of this section, if there is a compelling programmatic or business reason to do so. For each case in which you grant an exception, you must document the reason in the award file.
(b) For an expenditure-based TIA, you are to allow and encourage each for-profit participant that does not currently perform under expenditure-based Federal procurement contracts or assistance awards (other than TIAs) to use its existing financial management system as long as the system, as a minimum:
(1) Complies with Generally Accepted Accounting Principles.
(2) Effectively controls all project funds, including Federal funds and any required cost share. The system must have complete, accurate, and current records that document the sources of funds and the purposes for which they are disbursed. It also must have procedures for ensuring that project funds are used only for purposes permitted by the agreement ( see § 37.625).
(3) Includes, if advance payments are authorized under § 37.805, procedures to minimize the time elapsing between the payment of funds by the Government and the firm's disbursement of the funds for program purposes.
So as not to force system changes for any State, local government, institution of higher education, or other nonprofit organization, your expenditure-based TIA's requirements for the financial management system of any nonprofit participant are the same as those that apply to the participant's other Federal assistance awards.
(a) So as not to require any firm to needlessly change its cost-accounting system, your expenditure-based TIAs are to apply the Government cost principles in 48 CFR parts 31 and 231 to for-profit participants that currently perform under expenditure-based Federal procurement contracts or assistance awards (other than TIAs) and therefore have existing systems for identifying allowable costs under those principles. If there are programmatic or business reasons to do otherwise, you may grant an exception from this requirement and use alternative standards as long as the alternative satisfies the conditions described in paragraph (b) of this section; if you do so, you must document the reasons in your award file.
(b) For other for-profit participants, you may establish alternative standards in the agreement as long as that alternative provides, as a minimum, that Federal funds and funds counted as recipients' cost sharing will be used only for costs that:
(1) A reasonable and prudent person would incur in carrying out the research project contemplated by the agreement. Generally, elements of cost that appropriately are charged are those identified with research and development activities under the Generally Accepted Accounting Principles (see Statement of Financial Accounting Standards Number 2, “Accounting for Research and Development Costs,” October 1974
1
). Moreover, costs must be allocated to DoD and other projects in accordance with the relative benefits the projects receive. Costs charged to DoD projects must be given consistent treatment with costs allocated to the participants' other research and development activities ( e.g., activities supported by the participants themselves or by non-Federal sponsors).
1 Copies may be obtained from the Financial Accounting Standards Board (FASB), 401 Merritt 7, P.O. Box 5116, Norwalk, CT 06856-5116. Information about ordering also may be found at the Internet site http://www.fasb.org or by telephoning the FASB at (800) 748-0659.
(2) Are consistent with the purposes stated in the governing Congressional authorizations and appropriations. You are responsible for ensuring that provisions in the award document address any requirements that result from authorizations and appropriations.
In accordance with the general policy in § 37.605, you must require a for-profit participant that has Federally approved indirect cost rates for its Federal procurement contracts to use those rates to accumulate and report costs under an expenditure-based TIA. This includes both provisional and final rates that are approved up until the time that the TIA is closed out. You may grant an exception from this requirement if there are programmatic or business reasons to do otherwise ( e.g., the participant offers you a lower rate). If you grant an exception, the participant must accumulate and report the costs using an accounting system and practices that it uses for other customers ( e.g., its commercial customers). Also, you must document the reason for the exception in your award file.
So as not to force financial system changes for any nonprofit participant, your expenditure-based TIA will provide that costs to be charged to the research project by any nonprofit participant must be determined to be allowable in accordance with:
(a) Subpart E of OMB guidance in 2 CFR part 200, if the participant is a State, local government, Indian tribe, institution of higher education, or nonprofit organization. In conformance with 2 CFR 200.401(c) of that OMB guidance, a nonprofit organization listed in appendix VIII to 2 CFR part 200 is subject to the cost principles in the Federal Acquisition Regulation (48 CFR subpart 31.2) and Defense Federal Acquisition Regulation Supplement (48 CFR subpart 231.2).
(b) The cost principles identified in appendix IX to the OMB guidance in 2 CFR part 200 (see 45 CFR part 75), if the participant is a hospital.
Cite this law
TECHNOLOGY INVESTMENT AGREEMENTS (U.S.C.). Retrieved via LawPlayer, https://lawplayer.com/us/act/cfr-title-32-part-37
United States government works (U.S. Code, Code of Federal Regulations) are in the public domain under 17 U.S.C. § 105.
本頁資料來源:GPO govinfo / eCFR·整理提供:法律人 LawPlayer· lawplayer.com