This subpart prescribes policies, standards, and procedures for determining whether prospective contractors and subcontractors are responsible.
資料由法律人 LawPlayer整理提供·U.S. federal law / curated by LawPlayer from GPO govinfo & eCFR
CONTRACTOR QUALIFICATIONS
This part prescribes policies, standards, and procedures pertaining to prospective contractors' responsibility; debarment, suspension, and ineligibility; qualified products; first article testing and approval; contractor team arrangements; defense production pools and research and development pools; and organizational conflicts of interest.
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability ( e.g. , Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and state level but only in connections with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Surveying activity, as used in this subpart, means the cognizant contract administration office or, if there is no such office, another organization designated by the agency to conduct preaward surveys.
(a) This subpart applies to all proposed contracts with any prospective contractor that is located—
(1) In the United States or its outlying areas; or
(2) Elsewhere, unless application of the subpart would be inconsistent with the laws or customs where the contractor is located.
(b) This subpart does not apply to proposed contracts with—
(1) Foreign, State, or local governments;
(2) Other U.S. Government agencies or their instrumentalities; or
(3) Agencies for people who are blind or severely disabled (see subpart 8.7).
(a) Purchases shall be made from, and contracts shall be awarded to, responsible prospective contractors only.
(b) No purchase or award shall be made unless the contracting officer makes an affirmative determination of responsibility. In the absence of information clearly indicating that the prospective contractor is responsible, the contracting officer shall make a determination of nonresponsibility. If the prospective contractor is a small business concern, the contracting officer shall comply with subpart 19.6, Certificates of Competency and Determinations of Responsibility. (If Section 8(a) of the Small Business Act (15 U.S.C. 637) applies, see subpart 19.8.)
(c) The award of a contract to a supplier based on lowest evaluated price alone can be false economy if there is subsequent default, late deliveries, or other unsatisfactory performance resulting in additional contractual or administrative costs. While it is important that Government purchases be made at the lowest price, this does not require an award to a supplier solely because that supplier submits the lowest offer. A prospective contractor must affirmatively demonstrate its responsibility, including, when necessary, the responsibility of its proposed subcontractors.
To be determined responsible, a prospective contractor must—
(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record (see 9.104-3(b)
and subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;
(d) Have a satisfactory record of integrity and business ethics (for example, see subpart 42.15);
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) (see 9.104-3(a));
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).
(a) When it is necessary for a particular acquisition or class of acquisitions, the contracting officer shall develop, with the assistance of appropriate specialists, special standards of responsibility. Special standards may be particularly desirable when experience has demonstrated that unusual expertise or specialized facilities are needed for adequate contract performance. The special standards shall be set forth in the solicitation (and so identified) and shall apply to all offerors.
(b) Contracting officers shall award contracts for subsistence only to those prospective contractors that meet the general standards in 9.104-1 and are approved in accordance with agency sanitation standards and procedures.
(a) Ability to obtain resources. Except to the extent that a prospective contractor has sufficient resources or proposes to perform the contract by subcontracting, the contracting officer shall require acceptable evidence of the prospective contractor's ability to obtain required resources (see 9.104-1(a), (e), and (f)). Acceptable evidence normally consists of a commitment or explicit arrangement, that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the needed facilities, equipment, other resources, or personnel. Consideration of a prime contractor's compliance with limitations on subcontracting shall take into account the time period covered by the contract base period or quantities plus option periods or quantities, if such options are considered when evaluating offers for award.
(b) Satisfactory performance record. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible, unless the contracting officer determines that the circumstances were properly beyond the contractor's control, or that the contractor has taken appropriate corrective action. Past failure to apply sufficient tenacity and perseverance to perform acceptably is strong evidence of nonresponsibility. Failure to meet the quality requirements of the contract is a significant factor to consider in determining satisfactory performance. The contracting officer shall consider the number of contracts involved and the extent of deficient performance in each contract when making this determination. If the pending contract requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the contracting officer shall also consider the prospective contractor's compliance with subcontracting plans under recent contracts.
(c)(1) Affiliated concerns. Affiliated concerns (see Concern in 19.001 and Small business concern in 2.101) are normally considered separate entities in determining whether the concern that is to perform the contract meets the applicable standards for responsibility. However, the contracting officer shall consider the affiliate's past performance and integrity when they may adversely affect the prospective contractor's responsibility.
(2) Joint ventures. For a prospective contractor that is a joint venture, the contracting officer shall consider the past performance of the joint venture. If the joint venture does not demonstrate past performance for award, the contracting officer shall consider the past performance of each party to the joint venture.
(d)(1) Small business concerns. Upon making a determination of nonresponsibility with regard to a small business concern, the contracting officer shall refer the matter to the Small Business Administration, which will decide whether to issue a Certificate of Competency (see subpart 19.6).
(2) Limitations on subcontracting. A small business that is unable to comply with the limitations on subcontracting may be considered nonresponsible (see 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award; 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns; 52.219-14, Limitations on Subcontracting; 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program; 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns; and 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program). A small business that has not agreed to comply with the limitations on subcontracting may be considered nonresponsive.
(a) Generally, prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors (but see 9.405 and 9.405-2 regarding debarred, ineligible, or suspended firms). Determinations of prospective subcontractor responsibility may affect the Government's determination of the prospective prime contractor's responsibility. A prospective contractor may be required to provide written evidence of a proposed subcontractor's responsibility.
(b) When it is in the Government's interest to do so, the contracting officer may directly determine a prospective subcontractor's responsibility (e.g., when the prospective contract involves medical supplies, urgent requirements, or substantial subcontracting). In this case, the same standards used to determine a prime contractor's responsibility shall be used by the Government to determine subcontractor responsibility.
(a) When an offeror provides an affirmative response in paragraph (a)(1) of the provision at 52.209-5, Certification Regarding Responsibility Matters, or paragraph (h) of provision 52.212-3, the contracting officer shall—
(1) Promptly, upon receipt of offers, request such additional information from the offeror as the offeror deems necessary in order to demonstrate the offeror's responsibility to the contracting officer (but see 9.405); and
(2) Notify, prior to proceeding with award, in accordance with agency procedures (see 9.406-3(a) and 9.407-3(a)), the agency official responsible for initiating debarment or suspension action, where an offeror indicates the existence of an indictment, charge, conviction, or civil judgment, or Federal tax delinquency in an amount that exceeds $15,000.
(b) The provision at 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law, implements sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) (and similar provisions in subsequent appropriations acts). When an offeror provides an affirmative response in paragraph (b)(1) or (2) of the provision at 52.209-11 or paragraph (q)(2)(i) or (ii) of provision 52.212-3, the contracting officer shall—
(1) Promptly, upon receipt of offers, request such additional information from the offeror as the offeror deems necessary in order to demonstrate the offeror's responsibility to the contracting officer (but see 9.405);
(2) Notify, in accordance with agency procedures (see 9.406-3(a) and 9.407-3(a)), the agency official responsible for initiating debarment or suspension action; and
(3) Not award to the corporation unless an agency suspending and debarring official has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government.
(c) If the provision at 52.209-12, Certification Regarding Tax Matters, is applicable (see 9.104-7(e)), then the contracting officer shall not award any contract in an amount greater than $7 million, unless the offeror affirmatively certified in its offer, as required by paragraph (b)(1), (2), and (3) of the provision.
(d) Offerors who do not furnish the representation or certifications or such information as may be requested by the contracting officer shall be given an opportunity to remedy the deficiency. Failure to furnish the representation or certifications or such information may render the offeror nonresponsible.
(a)(1) Before awarding a contract in excess of the simplified acquisition threshold, the contracting officer shall review the performance and integrity information available in the Federal Awardee Performance and Integrity Information System (FAPIIS), (available at https://www.cpars.gov , including FAPIIS information from the System for Award Management (SAM) Exclusions and the Contractor Performance Assessment Reporting System (CPARS)
(2) In accordance with 41 U.S.C. 2313(d)(3), FAPIIS also identifies—
(i) An affiliate that is an immediate owner or subsidiary of the offeror, if any (see 52.204-17, Ownership or Control of Offeror); and
(ii) All predecessors of the offeror that held a Federal contract or grant within the last three years (see 52.204-20, Predecessor of Offeror).
(b)(1) When making a responsibility determination, the contracting officer shall consider all the information available through FAPIIS with regard to the offeror and any immediate owner, predecessor, or subsidiary identified for that offeror in FAPIIS, as well as other past performance information on the offeror (see subpart 42.15).
(2) For evaluation of information available through FAPIIS relating to an affiliate of the offeror, see 9.104-3(c).
(3) For source selection evaluations of past performance, see 15.305(a)(2). Contracting officers shall use sound judgment in determining the weight and relevance of the information contained in FAPIIS and how it relates to the present acquisition.
(4) Since FAPIIS may contain information on any of the offeror's previous contracts and information covering a 5-year period, some of that information may not be relevant to a determination of present responsibility, e.g., a prior administrative action such as debarment, suspension, voluntary exclusion, or administrative agreement, that has expired or otherwise been resolved, or information relating to contracts for completely different products or services.
(5) Because FAPIIS is a database that provides information about prime contractors, the contracting officer posts information required to be posted about a subcontractor, such as trafficking in persons violations, to the record of the prime contractor (see 42.1503(h)(1)(v)). The prime contractor has the opportunity to post in FAPIIS any mitigating factors. The contracting officer shall consider any mitigating factors posted in FAPIIS by the prime contractor, such as degree of compliance by the prime contractor with the terms of FAR clause 52.222-50.
(c) If the contracting officer obtains relevant information from FAPIIS regarding criminal, civil, or administrative proceedings in connection with the award or performance of a Government contract; terminations for default or cause; determinations of nonresponsibility because the contractor does not have a satisfactory performance record or a satisfactory record of integrity and business ethics; or comparable information relating to a grant, the contracting officer shall, unless the contractor has already been debarred, suspended, or has agreed to a voluntary exclusion—
(1) Promptly request such additional information from the offeror as the offeror deems necessary in order to demonstrate the offeror's responsibility to the contracting officer (but see 9.405); and
(2) Notify, prior to proceeding with award,in accordance with agency procedures (see 9.406-3(a) and 9.407-3(a)), the agency official responsible for initiating debarment or suspension action, if the information appears appropriate for the official's consideration.
(d) The contracting officer shall document the contract file for each contract in excess of the simplified acquisition threshold to indicate how the information in FAPIIS was considered in any responsibility determination, as well as the action that was taken as a result of the information. A contracting officer who makes a nonresponsibility determination is required to document that information in FAPIIS in accordance with 9.105-2 (b)(2).
(a) The contracting officer shall insert the provision at 52.209-5, Certification Regarding Responsibility Matters, in solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(b) The contracting officer shall insert the provision at 52.209-7, Information Regarding Responsibility Matters, in solicitations where the resultant contract value is expected to exceed $750,000.
(c) The contracting officer shall insert the clause at 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters—
(1) In solicitations where the resultant contract value is expected to exceed $750,000; and
(2) In contracts in which the offeror checked “has” in paragraph (b) of the provision at 52.209-7.
(d) The contracting officer shall insert the provision 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law, in all solicitations.
(e) For agencies receiving funds subject to section 523 of Division B of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and similar provisions in subsequent appropriations acts, the contracting officer shall insert the provision 52.209-12, Certification Regarding Tax Matters, in solicitations for which the resultant contract (including options) may have a value greater than $7 million. Division B of the Consolidated and Continuing Further Appropriations Act, 2015 appropriates funds for the following agencies: the Department of Commerce, the Department of Justice, the National Aeronautics and Space Administration, the Office of Science and Technology Policy, the National Science Foundation, the Commission on Civil Rights, the Equal Employment Opportunity Commission, the U.S. International Trade Commission, the Legal Services Corporation, the Marine Mammal Commission, the Office of the United States Trade Representative, and the State Justice Institute.
(a) Before making a determination of responsibility, the contracting officer shall possess or obtain information sufficient to be satisfied that a prospective contractor currently meets the applicable standards in 9.104.
(b)(1) Generally, the contracting officer shall obtain information regarding the responsibility of prospective contractors, including requesting preaward surveys when necessary (see 9.106), promptly after a bid opening or receipt of offers. However, in negotiated contracting, especially when research and development is involved, the contracting officer may obtain this information before issuing the request for proposals. Requests for information shall ordinarily be limited to information concerning—
(i) The low bidder; or
(ii) Those offerors in range for award.
(2) Preaward surveys shall be managed and conducted by the surveying activity.
(i) If the surveying activity is a contract administration office—
(A) That office shall advise the contracting officer on prospective contractors' financial competence and credit needs; and
(B) The administrative contracting officer shall obtain from the auditor any information required concerning the adequacy of prospective contractors' accounting systems and these systems' suitability for use in administering the proposed type of contract.
(ii) If the surveying activity is not a contract administration office, the contracting officer shall obtain from the auditor any information required concerning prospective contractors' financial competence and credit needs, the adequacy of their accounting systems, and these systems' suitability for use in administering the proposed type of contract.
(3) Information on financial resources and performance capability shall be obtained or updated on as current a basis as is feasible up to the date of award.
(c) In making the determination of responsibility, the contracting officer shall consider information available through FAPIIS (see 9.104-6) with regard to the offeror and any immediate owner, predecessor, or subsidiary identified for that offeror in FAPIIS, including information that is linked to FAPIIS such as from SAM, and CPARS, as well as any other relevant past performance information on the offeror (see 9.104-1(c) and subpart 42.15). In addition, the contracting officer should use the following sources of information to support such determinations:
(1) Records and experience data, including verifiable knowledge of personnel within the contracting office, audit offices, contract administration offices, and other contracting offices.
(2) The prospective contractor—including bid or proposal information (including the certification at 52.209-5 or 52.212-3(h) (see 9.104-5)), questionnaire replies, financial data, information on production equipment, and personnel information.
(3) Commercial sources of supplier information of a type offered to buyers in the private sector.
(4) Preaward survey reports (see 9.106).
(5) Other sources such as publications; suppliers, subcontractors, and customers of the prospective contractor; financial institutions; Government agencies; and business and trade associations.
(d) Contracting offices and cognizant contract administration offices that become aware of circumstances casting doubt on a contractor's ability to perform contracts successfully shall promptly exchange relevant information.
(a) Determinations. (1) The contracting officer's signing of a contract constitutes a determination that the prospective contractor is responsible with respect to that contract. When an offer on which an award would otherwise be made is rejected because the prospective contractor is found to be nonresponsible, the contracting officer shall make, sign, and place in the contract file a determination of nonresponsibility, which shall state the basis for the determination.
(2) If the contracting officer determines that a responsive small business lacks certain elements of responsibility, the contracting officer shall comply with the procedures in subpart 19.6. When a Certificate of Competency is issued for a small business concern (see subpart 19.6), the contracting officer shall accept the Small Business Administration's decision to issue a Certificate of Competency and award the contract to the concern.
(b) Support documentation. (1) Documents and reports supporting a determination of responsibility or nonresponsibility, including any preaward survey reports, the use of FAPIIS information (see 9.104-6), and any applicable Certificate of Competency, must be included in the contract file.
(2)(i) The contracting officer shall document the determination of nonresponsibility in FAPIIS (available at https://www.cpars.gov” if—
(A) The contract is valued at more than the simplified acquisition threshold;
(B) The determination of nonresponsibility is based on lack of satisfactory performance record or satisfactory record of integrity and business ethics; and
(C) The Small Business Administration does not issue a Certificate of Competency.
(ii) The contracting officer is responsible for the timely submission, within 3 working days, and sufficiency, and accuracy of the documentation regarding the nonresponsibility determination.
(iii) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments—
(A) The non-public segment, into which Government officials and contractors post information, which can only be viewed by—
( 1 ) Government personnel and authorized users performing business on behalf of the Government; or
( 2 ) An offeror or contractor, when viewing data on itself; and
(B) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for—
( 1 ) Past performance reviews required by subpart 42.15;
( 2 ) Information that was entered prior to April 15, 2011; or
( 3 ) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (b)(2)(iv) of this section.
(iv) The contracting officer, or any other Government official, shall not post any information in the non-public segment of FAPIIS that is covered by a disclosure exemption under the Freedom of Information Act. If the contractor asserts within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information Act procedures, prior to reposting the releasable information.
(a) Except as provided in subpart 24.2, Freedom of Information Act, information (including the preaward survey report) accumulated for purposes of determining the responsibility of a prospective contractor shall not be released or disclosed outside the Government.
(b) The contracting officer may discuss preaward survey information with the prospective contractor before determining responsibility. After award, the contracting officer or, if it is appropriate, the head of the surveying activity or a designee may discuss the findings of the preaward survey with the company surveyed.
(c) Preaward survey information may contain proprietary or source selection information and should be marked with the appropriate legend and protected accordingly (see 3.104-4).
(a) A preaward survey is normally required only when the information on hand or readily available to the contracting officer, including information from commercial sources, is not sufficient to make a determination regarding responsibility. In addition, if the contemplated contract will have a fixed price at or below the simplified acquisition threshold or will involve the acquisition of commercial products or commercial services (see part 12), the contracting officer should not request a preaward survey unless circumstances justify its cost.
(b) When a cognizant contract administration office becomes aware of a prospective award to a contractor about which unfavorable information exists and no preaward survey has been requested, it shall promptly obtain and transmit details to the contracting officer.
(c) Before beginning a preaward survey, the surveying activity shall ascertain whether the prospective contractor is debarred, suspended, or ineligible (see subpart 9.4). If the prospective contractor is debarred, suspended, or ineligible, the surveying activity shall advise the contracting officer promptly and not proceed with the preaward survey unless specifically requested to do so by the contracting officer.
The contracting officer's request to the surveying activity (Preaward Survey of Prospective Contractor (General), SF 1403) shall—
(a) Identify additional factors about which information is needed;
(b) Include the complete solicitation package (unless it has previously been furnished), and any information indicating prior unsatisfactory performance by the prospective contractor;
(c) State whether the contracting office will participate in the survey;
(d) Specify the date by which the report is required. This date should be consistent with the scope of the survey requested and normally shall allow at least 7 working days to conduct the survey; and
(e) When appropriate, limit the scope of the survey.
When the contracting office and the surveying activity are in different agencies, the procedures of this section 9.106 and subpart 42.1 shall be followed along with the regulations of the agency in which the surveying activity is located, except that reasonable special requests by the contracting office shall be accommodated (also see subpart 17.5).
(a) The surveying activity shall complete the applicable parts of SF 1403, Preaward Survey of Prospective Contractor (General); SF 1404, Preaward Survey of Prospective Contractor—Technical; SF 1405, Preaward Survey of Prospective Contractor—Production; SF 1406, Preaward Survey of Prospective Contractor—Quality Assurance; SF 1407, Preaward Survey of Prospective Contractor—Financial Capability; and SF 1408, Preaward Survey of Prospective Contractor—Accounting System; and provide a narrative discussion sufficient to support both the evaluation ratings and the recommendations.
(b) When the contractor surveyed is a small business that has received preferential treatment on an ongoing contract under Section 8(a) of the Small Business Act (15 U.S.C. 637) or has received a Certificate of Competency during the last 12 months, the surveying activity shall consult the appropriate Small Business Administration field office before making an affirmative recommendation regarding the contractor's responsibility or nonresponsibility.
(c) When a preaward survey discloses previous unsatisfactory performance, the surveying activity shall specify the extent to which the prospective contractor plans, or has taken, corrective action. Lack of evidence that past failure to meet contractual requirements was the prospective contractor's fault does not necessarily indicate satisfactory performance. The narrative shall report any persistent pattern of need for costly and burdensome Government assistance (e.g., engineering, inspection, or testing) provided in the Government's interest but not contractually required.
(d) When the surveying activity possesses information that supports a recommendation of complete award without an on-site survey and no special areas for investigation have been requested, the surveying activity may provide a short-form preaward survey report. The short-form report shall consist solely of the Preaward Survey of Prospective Contractor (General), SF 1403. Sections III and IV of this form shall be completed and block 21 shall be checked to show that the report is a short-form preaward report.
(a) The Committee for Purchase From People Who Are Blind or Severely Disabled (Committee), as authorized by 41 U.S.C. chapter 85, determines what supplies and services Federal agencies are required to purchase from AbilityOne participating nonprofit agencies serving people who are blind or have other severe disabilities (see Subpart 8.7). The Committee is required to find an AbilityOne participating nonprofit agency capable of furnishing the supplies or services before the nonprofit agency can be designated as a mandatory source under the AbilityOne Program. The Committee may request a contracting office to assist in assessing the capabilities of a nonprofit agency.
(b) The contracting office, upon request from the Committee, shall request a capability survey from the activity responsible for performing preaward surveys, or notify the Committee that the AbilityOne participating nonprofit agency is capable, with supporting rationale, and that the survey is waived. The capability survey will focus on the technical and production capabilities and applicable preaward survey elements to furnish specific supplies or services being considered for addition to the Procurement List.
(c) The contracting office shall use the Standard Form 1403 to request a capability survey of organizations employing people who are blind or have other severe disabilities.
(d) The contracting office shall furnish a copy of the completed survey, or notice that the AbilityOne participating nonprofit agency is capable and the survey is waived, to the Executive Director, Committee for Purchase From People Who Are Blind or Severely Disabled.
As used in this section—
Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
Subsidiary means an entity in which more than 50 percent of the entity is owned—
(1) Directly by a parent corporation; or
(2) Through another subsidiary of a parent corporation.
(a) Section 745 of Division D of the Consolidated Appropriations Act, 2008 (Pub. L. 110-161) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) prohibit, on a Governmentwide basis, the use of appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of such a corporation, except as provided in paragraph (b) of this section and in 9.108-4 Waiver.
(b)(1) Section 745 and its successor provisions include the following exception: This section shall not apply to any Federal Government contract entered into before the date of the enactment of this Act, or to any task order issued pursuant to such contract.
(2) To ensure appropriate application of the prohibition and this exception, contracting officers should consult with legal counsel if, during the performance of a contract, a contractor becomes an inverted domestic corporation or a subsidiary of one.
(a) In order to be eligible for contract award, an offeror must represent that it is neither an inverted domestic corporation, nor a subsidiary of an inverted domestic corporation. Any offeror that cannot so represent is ineligible for award of a contract, unless waived in accordance with the procedures at 9.108-4.
(b) The contracting officer may rely on an offeror's representation that it is not an inverted domestic corporation unless the contracting officer has reason to question the representation.
Any agency head may waive the prohibition in subsection 9.108-2 and the requirement of subsection 9.108-3 for a specific contract if the agency head determines in writing that the waiver is required in the interest of national security, documents the determination, and reports it to the Congress.
The contracting officer shall—
(a) Include the provision at 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation, in each solicitation for the acquisition of products or services (including construction); and
(b) Include the clause at 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations, in each solicitation and contract for the acquisition of products or services (including construction).
This section implements 22 U.S.C. 2593e.
Contracting officers shall not award, renew, or extend a contract for the procurement of products or services with an entity identified as excluded in the System for Award Management, specifically for this subpart, on the basis of involvement in activities that violate arms control treaties or agreements with the United States.
The prohibition in 9.109-2 does not apply to contracts for the procurement of products or services along a major route of supply to a zone of active combat or major contingency operation, as specified in statute or by the cognizant Combatant Commander, in consultation with the Chief of Mission. As of May 10, 2018, countries along the major route of supply to support operations in Afghanistan are Afghanistan, Georgia, the Kyrgyz Republic, Pakistan, the Republic of Armenia, the Republic of Azerbaijan, the Republic of Kazakhstan, the Republic of Tajikistan, the Republic of Uzbekistan, and Turkmenistan.
(a) In order to be eligible for contract award, an offeror is required to—
(1)(i) Certify that it does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/” ; and
(ii) Similarly certify with regard to any entity owned or controlled by the offeror; or
(2) Provide with its offer information that the President of the United States has—
(i) Waived application under 22 U.S.C. 2593e(d) or (e); or
(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b).
(b) If certifying in accordance with 52.209-13(b)(1), the Offeror is required to submit the certification with the offer. It is not included in the annual representations and certifications in the System for Award Management.
(c) The contracting officer may rely on an offeror's certification unless the contracting officer has reason to question the certification.
(d) Upon the determination of a false certification under 52.209-13, an offeror will be subject to such remedies as suspension or debarment under subpart 9.4, or termination of any contract resulting from the false certification. Debarments pursued as a remedy under subpart 9.4 shall be for a period of not less than 2 years, inclusive of any suspension period, if suspension precedes a debarment (see 9.406-4(a)(1)(iii) and (a)(2)).
Unless the exception at 9.109-3 applies, the contracting officer shall include the provision at 52.209-13, Violation of Arms Control Treaties or Agreements—Certification, in each solicitation for the acquisition of products or services (including construction) that exceeds the simplified acquisition threshold, other than solicitations for the acquisition of commercial products or commercial services.
As used in this section—
Covered agency means—
(1) The Department of Defense;
(2) Any department or agency for which regular appropriations are made in a Department of Labor, Health and Human Services, and Education, and Related Agencies Appropriations Act;
(3) The Department of Homeland Security;
(4) The National Nuclear Security Administration of the Department of Energy;
(5) The Department of Transportation; or
(6) The Central Intelligence Agency.
Institution of higher education means an institution that meets the requirements of 20 U.S.C. 1001 and includes all sub-elements of such an institution.
This section implements 10 U.S.C. 983.
(a) Except as provided in paragraph (b) of this section, 10 U.S.C. 983 prohibits the covered agency from providing funds by contract to an institution of higher education if the Secretary of Defense determines that the institution has a policy or practice that prohibits or in effect prevents—
(1) The Secretary of a military department from maintaining, establishing, or operating a unit of the Senior Reserve Officer Training Corps (ROTC) at that institution;
(2) A student at that institution from enrolling in a unit of the Senior ROTC at another institution of higher education;
(3) The Secretary of a military department or the Secretary of Homeland Security from gaining access to campuses, or access to students (who are 17 years of age or older) on campuses, for purposes of military recruiting in a manner that is at least equal in quality and scope to the access to campuses and to students that is provided to any other employer; or
(4) Military recruiters from accessing certain information pertaining to students (who are 17 years of age or older) enrolled at that institution:
(i) Name, address, and telephone listings.
(ii) Date and place of birth, educational level, academic majors, degrees received, and the most recent educational institution enrolled in by the student.
(b) The prohibition in paragraph (a) of this section does not apply to an institution of higher education if the Secretary of Defense determines that—
(1) The institution has ceased the policy or practice described in paragraph (a) of this section; or
(2) The institution has a long-standing policy of pacifism based on historical religious affiliation.
If the Secretary of Defense determines, pursuant to the procedures at 32 CFR part 216, that an institution of higher education is ineligible to receive funds from a covered agency because of a policy or practice described in 9.110-3—
(a) The Secretary of Defense will create an active exclusion record for the institution in the System for Award Management; and
(b) A covered agency shall not solicit offers from, award contracts to, or consent to subcontracts with the institution. The prohibition in this paragraph (b) does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services, including commercially available off-the-shelf items.
The contracting officer shall insert the clause at 52.209-14, Reserve Officer Training Corps and Military Recruiting on Campus, in solicitations and contracts that are expected to exceed the simplified acquisition threshold, with institutions of higher education, when using funds from a covered agency. The clause is not prescribed for solicitations and contracts using part 12 for the acquisition of commercial products and commercial services.
This subpart implements 10 U.S.C. 3243 and 41 U.S.C. 3311 and prescribes policies and procedures regarding qualification requirements and the acquisitions that are subject to such requirements.
As used in this subpart—
Qualified bidders list (QBL) means a list of bidders who have had their products examined and tested and who have satisfied all applicable qualification requirements for that product or have otherwise satisfied all applicable qualification requirements.
Qualified manufacturers list (QML) means a list of manufacturers who have had their products examined and tested and who have satisfied all applicable qualification requirements for that product.
(a)(1) The head of the agency or designee shall, before establishing a qualification requirement, prepare a written justification—
(i) Stating the necessity for establishing the qualification requirement and specifying why the qualification requirement must be demonstrated before contract award;
(ii) Estimating the likely costs for testing and evaluation which will be incurred by the potential offeror to become qualified; and
(iii) Specifying all requirements that a potential offeror (or its product) must satisfy in order to become qualified. Only those requirements which are the least restrictive to meet the purposes necessitating the establishment of the qualification requirements shall be specified.
(2) Upon request to the contracting activity, potential offerors shall be provided—
(i) All requirements that they or their products must satisfy to become qualified; and
(ii) At their expense (but see 9.204(a)(2) with regard to small businesses), a prompt opportunity to demonstrate their abilities to meet the standards specified for qualification using qualified personnel and facilities of the agency concerned, or of another agency obtained through interagency agreements, or under contract, or other methods approved by the agency (including use of approved testing and evaluation services not provided under contract to the agency).
(3) If the services in (a)(2)(ii) of this section are provided by contract, the contractors selected to provide testing and evaluation services shall be—
(i) Those that are not expected to benefit from an absence of additional qualified sources; and
(ii) Required by their contracts to adhere to any restriction on technical data asserted by the potential offeror seeking qualification.
(4) A potential offeror seeking qualification shall be promptly informed as to whether qualification is attained and, in the event it is not, promptly furnished specific reasons why qualification was not attained.
(b) When justified under the circumstances, the agency activity responsible for establishing a qualification requirement shall submit to the advocate for competition for the procuring activity responsible for purchasing the item subject to the qualification requirement, a determination that it is unreasonable to specify the standards for qualification which a prospective offeror (or its product) must satisfy. After considering any comments of the advocate for competition reviewing the determination, the head of the procuring activity may waive the requirements of 9.202(a)(1)(ii) through (4) of this section for up to 2 years with respect to the item subject to the qualification requirement. A copy of the waiver shall be furnished to the head of the agency or other official responsible for actions under paragraph (a)(1) of this section). The waiver authority provided in this paragraph does not apply with respect to qualification requirements contained in a QPL, QML, or QBL.
(c) If a potential offeror can demonstrate to the satisfaction of the contracting officer that the potential offeror (or its product) meets the standards established for qualification or can meet them before the date specified for award of the contract, a potential offeror may not be denied the opportunity to submit and have considered an offer for a contract solely because the potential offeror—
(1) Is not on a QPL, QML, or QBL maintained by the Department of Defense (DoD) or the National Aeronautics and Space Administration (NASA); or
(2) Has not been identified as meeting a qualification requirement established after October 19, 1984, by DoD or NASA; or
(3) Has not been identified as meeting a qualification requirement established by a civilian agency (not including NASA).
(d) The procedures in subpart 19.6 for referring matters to the Small Business Administration are not mandatory on the contracting officer when the basis for a referral would involve a challenge by the offeror to either the validity of the qualification requirement or the offeror's compliance with such requirement.
(e) The contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. In addition, when approved by the head of an agency or designee, a procurement need not be delayed in order to comply with paragraph (a) of this section.
(f) Within 7 years following enforcement of a QPL, QML, or QBL by DoD or NASA, or within 7 years after any qualification requirement was originally established by a civilian agency other than NASA, the qualification requirement shall be examined and revalidated in accordance with the requirements of paragraph (a) of this section. For DoD and NASA, qualification requirements, other than QPL's, QML's, and QBL's, shall be examined and revalidated within 7 years after establishment of the requirement under paragraph (a) of this section. Any periods for which a waiver under paragraph (b) of this section is in effect shall be excluded in computing the 7 years within which review and revalidation must occur.
(a) Qualification and listing in a QPL, QML, or QBL is the process by which products are obtained from manufacturers or distributors, examined and tested for compliance with specification requirements, or manufacturers or potential offerors, are provided an opportunity to demonstrate their abilities to meet the standards specified for qualification. The names of successful products, manufacturers, or potential offerors are included on lists evidencing their status. Generally, qualification is performed in advance and independently of any specific acquisition action. After qualification, the products, manufacturers, or potential offerors are included in a Federal or Military QPL, QML, or QBL. (See 9.202(a)(2) with regard to any product, manufacturer, or potential offeror not yet included on an applicable list.)
(b) Specifications requiring a qualified product are included—
(1) In the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions; and
(2) On the Department of Defense Acquisition Streamlining and Standardization Information System (ASSIST) website at https://assist.dla.mil.
(c) Instructions concerning qualification procedures are included in the following publications:
(1) Federal Standardization Manual, FSPM-0001.
(2) Department of Defense Manual 4120.24, Defense Standardization Program (DSP) Procedures, ( www.esd.whs.mil/Directives/Issuances/dodm ) as amended by Military Standards 961 and 962 ( https://assist.dla.mil ).
(d) The publications in paragraphs (b)(1) and (c)(1) of this section may be obtained from the address in 11.201(d)(1).
The responsibilities of agency activities that establish qualification requirements include the following:
(a) Arranging publicity for the qualification requirements. If active competition on anticipated future qualification requirements is likely to be fewer than two manufacturers or the products of two manufacturers, the activity responsible for establishment of the qualification requirements must—
(1) Periodically furnish through the Governmentwide point of entry (GPE) a notice seeking additional sources or products for qualification unless the contracting officer determines that such publication would compromise the national security.
(2) Bear the cost of conducting the specified testing and evaluation (excluding the costs associated with producing the item or establishing the production, quality control, or other system to be tested and evaluated) for a small business concern or a product manufactured by a small business concern which has met the standards specified for qualification and which could reasonably be expected to compete for a contract for that requirement. However, such costs may be borne only if it is determined in accordance with agency procedures that such additional qualified sources or products are likely to result in cost savings from increased competition for future requirements sufficient to amortize the costs incurred by the agency within a reasonable period of time, considering the duration and dollar value of anticipated future requirements. A prospective contractor requesting the United States to bear testing and evaluation costs must certify as to its status as a small business concern under section 3 of the Small Business Act in order to receive further consideration.
(b) Qualifying products that meet specification requirements.
(c) Listing manufacturers and suppliers whose products are qualified in accordance with agency procedures.
(d) Furnishing QPL's, OML's, or QBL's or the qualification requirements themselves to prospective offerors and the public upon request(see
9.202(a)(2)(i)).
(e) Clarifying, as necessary, qualification requirements.
(f) In appropriate cases, when requested by the contracting officer, providing concurrence in a decision not to enforce a qualification requirement for a solicitation.
(g) Withdrawing or omitting qualification of a listed product, manufacturer or offeror, as necessary.
(h) Advising persons furnished any list of products, manufacturers or offerors meeting a qualification requirement and suppliers whose products are on any such list that—
(1) The list does not constitute endorsement of the product, manufacturer, or other source by the Government;
(2) The products or sources listed have been qualified under the latest applicable specification;
(3) The list may be amended without notice;
(4) The listing of a product or source does not release the supplier from compliance with the specification; and
(5) Use of the list for advertising or publicity is permitted. However, it must not be stated or implied that a particular product or source is the only product or source of that type qualified, or that the Government in any way recommends or endorses the products or the sources listed.
(i) Reexamining a qualified product or manufacturer when—
(1) The manufacturer has modified its product, or changed the material or the processing sufficiently so that the validity of previous qualification is questionable;
(2) The requirements in the specification have been amended or revised sufficiently to affect the character of the product; or
(3) It is otherwise necessary to determine that the quality of the product is maintained in conformance with the specification.
(a) If an agency determines that a qualification requirement is necessary, the agency activity responsible for establishing the requirement must urge manufacturers and other potential sources to demonstrate their ability to meet the standards specified for qualification and, when possible, give sufficient time to arrange for qualification before award. The responsible agency activity must, before establishing any qualification requirement, furnish notice through the GPE. The notice must include—
(1) Intent to establish a qualification requirement;
(2) The specification number and name of the product;
(3) The name and address of the activity to which a request for the information and opportunity described in 9.202(a)(2) should be submitted;
(4) The anticipated date that the agency will begin awarding contracts subject to the qualification requirement;
(5) A precautionary notice that when a product is submitted for qualification testing, the applicant must furnish any specific information that may be requested of the manufacturer before testing will begin; and
(6) The approximate time period following submission of a product for qualification testing within which the applicant will be notified whether the product passed or failed the qualification testing (see 9.202(a)(4)).
(b) The activity responsible for establishing a qualification requirement must keep any list maintained of those already qualified open for inclusion of additional products, manufacturers, or other potential sources.
(a) Agencies may not enforce any QPL, QML, or QBL without first complying with the requirements of 9.202(a). However, qualification requirements themselves, whether or not previously embodied in a QPL, QML, or QBL, may be enforced without regard to 9.202(a) if they are in either of the following categories:
(1) Any qualification requirement established by statute prior to October 30, 1984, for civilian agencies (not including NASA); or
(2) Any qualification requirement established by statute or administrative action prior to October 19, 1984, for DOD or NASA. Qualification requirements established after the above dates must comply with 9.202(a) to be enforceable.
(b) Except when the agency head or designee determines that an emergency exists, whenever an agency elects, whether before or after award, not to enforce a qualification requirement which it established, the requirement may not thereafter be enforced unless the agency complies with 9.202(a).
(c) If a qualification requirement applies, the contracting officer need consider only those offers identified as meeting the requirement or included on the applicable QPL, QML, or QBL, unless an offeror can satisfactorily demonstrate to the contracting officer that it or its product or its subcontractor or its product can meet the standards established for qualification before the date specified for award.
(d) If a product subject to a qualification requirement is to be acquired as a component of an end item, the contracting officer must assure that all such components and their qualification requirements are properly identified in the solicitation since the product or source must meet the standards specified for qualification before award.
(e) In acquisitions subject to qualification requirements, the contracting officer shall take the following steps:
(1) Use presolicitation notices in appropriate cases to advise potential suppliers before issuing solicitations involving qualification requirements. The notices shall identify the specification containing the qualification requirement and establish an allowable time period, consistent with delivery requirements, for prospective offerors to demonstrate their abilities to meet the standards specified for qualification. The notice shall be publicized in accordance with 5.204. Whether or not a presolicitation notice is used, the general synopsizing requirements of subpart 5.2 apply.
(2) Distribute solicitations to prospective contractors whether or not they have been identified as meeting applicable qualification requirements.
(3) When appropriate, request in accordance with agency procedures that a qualification requirement not be enforced in a particular acquisition and, if granted, so specify in the solicitation (see 9.206-1(b)).
(4) Forward requests from potential suppliers for information on a qualification requirement to the agency activity responsible for establishing the requirement.
(5) Allow the maximum time, consistent with delivery requirements, between issuing the solicitation and the contract award. As a minimum, contracting officers shall comply with the time frames specified in 5.203 when applicable.
The contracting officer shall insert the clause at 52.209-1, Qualification Requirements, in solicitations and contracts when the acquisition is subject to a qualification requirement.
(a) Presolicitation. If a qualification requirement applies to an acquisition, the contracting officer shall review the applicable QPL, QML, or QBL or other identification of those sources which have met the requirement before issuing a solicitation to ascertain whether the number of sources is adequate for competition. (See 9.204(a) for duties of the agency activity responsible for establishment of the qualification requirement.) If the number of sources is inadequate, the contracting officer shall request the agency activity which established the requirement to—
(1) Indicate the anticipated date on which any sources presently undergoing evaluation will have demonstrated their abilities to meet the qualification requirement so that the solicitation could be rescheduled to allow as many additional sources as possible to qualify; or
(2) Indicate whether a means other than the qualification requirement is feasible for testing or demonstrating quality assurance.
(b) Postsolicitation. The contracting officer shall submit to the agency activity which established the qualification requirement the names and addresses of concerns which expressed interest in the acquisition but are not included on the applicable QPL, QML, or QBL or identified as meeting the qualification requirement. The activity will then assist interested concerns in meeting the standards specified for qualification (see 9.202(a) (2) and (4)).
(a) The contracting officer shall promptly report to the agency activity which established the qualification requirement any conditions which may merit removal or omission from a QPL, QML, or QBL or affect whether a source should continue to be otherwise identified as meeting the requirement. These conditions exist when—
(1) Products or services are submitted for inspection or acceptance that do not meet the qualification requirement;
(2) Products or services were previously rejected and the defects were not corrected when resubmitted for inspection or acceptance;
(3) A supplier fails to request reevaluation following change of location or ownership of the plant where the product which met the qualification requirement was manufactured (see the clause at 52.209-1, Qualification Requirements);
(4) A manufacturer of a product which met the qualification requirement has discontinued manufacture of the product;
(5) A source requests removal from a QPL, QML, or QBL;
(6) A condition of meeting the qualification requirement was violated; e.g., advertising or publicity contrary to 9.204(h)(5);
(7) A revised specification imposes a new qualification requirement;
(8) Manufacturing or design changes have been incorporated in the qualification requirement;
(9) The source is listed in the System for Award Management Exclusions (see Subpart 9.4); or
(10) Performance of a contract subject to a qualification requirement is otherwise unsatisfactory.
(b) After considering any of the above or other conditions reasonably related to whether a product or source continues to meet the standards specified for qualification, an agency may take appropriate action without advance notification. The agency shall, however, promptly notify the affected parties if a product or source is removed from a QPL, QML, or QBL, or will no longer be identified as meeting the standards specified for qualification. This notice shall contain specific information why the product or source no longer meets the qualification requirement.
Approval, as used in this subpart, means the contracting officer's written notification to the contractor accepting the test results of the first article.
First article testing and approval (hereafter referred to as testing and approval) ensures that the contractor can furnish a product that conforms to all contract requirements for acceptance. Before requiring testing and approval, the contracting officer shall consider the—
(a) Impact on cost or time of delivery;
(b) Risk to the Government of foregoing such test; and
(c) Availability of other, less costly, methods of ensuring the desired quality.
Testing and approval may be appropriate when—
(a) The contractor has not previously furnished the product to the Government;
(b) The contractor previously furnished the product to the Government, but—
(1) There have been subsequent changes in processes or specifications;
(2) Production has been discontinued for an extended period of time; or
(3) The product acquired under a previous contract developed a problem during its life.
(c) The product is described by a performance specification; or
(d) It is essential to have an approved first article to serve as a manufacturing standard.
Normally, testing and approval is not required in contracts for—
(a) Research or development;
(b) Products requiring qualification before award (e.g., when an applicable qualified products list exists (see subpart 9.2));
(c) Products normally sold in the commercial market; or
(d) Products covered by complete and detailed technical specifications, unless the requirements are so novel or exacting that it is questionable whether the products would meet the requirements without testing and approval.
Before first article approval, the acquisition of materials or components, or commencement of production, is normally at the sole risk of the contractor. To minimize this risk, the contracting officer shall provide sufficient time in the delivery schedule for acquisition of materials and components, and for production after receipt of first article approval. When Government requirements preclude this action, the contracting officer may, before approval of the first article, authorize the contractor to acquire specific materials or components or commence production to the extent essential to meet the delivery schedule (see Alternate II of the clause at 52.209-3, First Article Approval—Contractor Testing, and Alternate II of the clause at 52.209-4, First Article Approval—Government Testing. Costs incurred based on this authorization are allocable to the contract for—
(a) Progress payments; and
(b) Termination settlements if the contract is terminated for the convenience of the Government.
Cite this law
CONTRACTOR QUALIFICATIONS (U.S.C.). Retrieved via LawPlayer, https://lawplayer.com/us/act/cfr-title-48-part-9
United States government works (U.S. Code, Code of Federal Regulations) are in the public domain under 17 U.S.C. § 105.
本頁資料來源:GPO govinfo / eCFR·整理提供:法律人 LawPlayer· lawplayer.com