Council Decision (CFSP) 2026/2620 of 20 November 2026 on an assistance measure under the European Peace Facility to support the Armed Forces of Ukraine through the joint procurement of military equipment designed to deliver lethal force

Council Decision (CFSP) 2026/2620 of 20 November 2026 on an assistance measure under the European Peace Facility to support the Armed Forces of Ukraine through the joint procurement of military equipment designed to deliver lethal force

Decision (CFSP) 2026/2620 · Decision · 9 articles

Data as of 2026-11-24 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Establishment, objectives, scope and duration

Article 1

Open ↗

1.   An assistance measure benefiting Ukraine (the ‘beneficiary’) to be financed under the European Peace Facility (EPF) (the ‘assistance measure’) is hereby established. 2.   The objectives of the assistance measure are: (a) to contribute to strengthening the capabilities and resilience of the Armed Forces of Ukraine to defend the independence, sovereignty and territorial integrity of Ukraine; and (b) to protect the civilian population against the ongoing military aggression, through the provision of military equipment designed to deliver lethal force, jointly procured in the fastest possible way. 3.   To achieve the objectives set out in paragraph 2, the assistance measure shall finance joint procurement of the following types of military equipment designed to deliver lethal force: (a) drones; (b) air defence equipment; (c) ammunition; (d) radar equipment; (e) explosives. The assistance measure shall also finance related training and transportation costs. 4.   By derogation from Articles 50 and 50a of Book 3 of the rules for the implementation of revenue and expenditures financed under the EPF (the ‘Implementing Rules’), the military equipment referred to in paragraph 3 of this Article shall be jointly procured from economic operators, including small and medium sized enterprises, established in the Union, Norway or Ukraine, and shall originate in the Union, Norway or Ukraine. The rules on acquisition of origin laid down in Article 60 of Regulation (EU) No 952/2013 of the European Parliament and of the Council  ( 4 ) shall apply. Military equipment which has undergone an important stage of manufacture in the Union, Norway or Ukraine, which consists of final assembly, shall also be deemed eligible. Supply chains of those operators may include economic operators established or having their production outside of the Union, Norway, or Ukraine. The security and defence interests of the Member States shall be taken into account in that regard. 5.   Joint procurements carried out under the assistance measure shall be carried out by the entities listed in Article 4(2), through joint procurement by at least two Member States, or by at least one Member State and Ukraine, or through procurement by one Member State involving the defence industries of at least one Member State and Ukraine, or through procurement by Ukraine financed by at least one Member State. In the three latter cases, the participation in the joint procurement of economic operators established or producing equipment in Ukraine shall be allowed, except where those economic operators are owned for more than 50 % by a third country or a third-country entity, which affects the security and defence interests of Member States. Supply chains of these economic operators may include economic operators established or having their production outside of Ukraine. The security and defence interests of the Member States shall be taken into account in that regard. Joint procurement may also be carried out through related European Defence Agency projects. 6.   The duration period of the assistance measure shall be from the date of entry into force of this Decision until 30 June 2028.

Financial arrangements

Article 2

Open ↗

1.   The financial reference amount intended to cover the expenditure related to the assistance measure shall be EUR 900 000 000. 2.   All expenditure shall be managed in accordance with Decision (CFSP) 2021/509 and in line with the rules for the implementation of revenue and expenditure financed under the EPF. By way of derogation from Article 50 and 50a of Book 3 of the EPF Implementing Rules, participation in joint procurement procedures shall be open only to economic operators as referred to in Article 1(4) of this Decision as regards military equipment originating as referred thereunder. 3.   In accordance with Article 29(5) of Decision (CFSP) 2021/509, the administrator for assistance measures may call for contributions of up to EUR 600 000 000 following the adoption of this Decision. The funds called for by the administrator for assistance measures shall be used only to pay expenditure within the limits approved by the Facility Committee established by Decision (CFSP) 2021/509 in the related amending and annual budgets corresponding to the assistance measure. 4.   Procurement contracts or orders related to the implementation of the assistance measure shall be concluded or placed in the fastest way possible. Expenditure related to the implementation of the assistance measure shall be eligible from the date of adoption of this Decision and until 31 December 2027. In duly justified cases of unforeseen or exceptional circumstances, such as a case of force majeure, deliveries shall take place no later than 30 June 2028.

Arrangements with the beneficiary

Article 3

Open ↗

1.   The High Representative of the Union for Foreign Affairs and Security Policy (the ‘High Representative’) shall make the necessary arrangements with the beneficiary to ensure its compliance with the requirements and conditions established by this Decision as a condition for the provision of support under the assistance measure. 2.   The arrangements referred to in paragraph 1 shall include provisions obliging the beneficiary to ensure: (a) the compliance of the units of the Armed Forces of Ukraine supported under the assistance measure with relevant international law, in particular international human rights law and international humanitarian law; (b) proper and efficient use of any assets provided under the assistance measure for the purposes for which they were provided; (c) sufficient maintenance of any assets provided under the assistance measure to ensure their usability and their operational availability over their life cycle; (d) continued implementation of adequate measures to prevent and counter possible diversion of assets provided under the assistance measure; (e) that any assets provided under the assistance measure are not lost or transferred to persons or entities other than those identified in those arrangements without prior consent of the High Representative. 3.   The arrangements referred to in paragraph 1 shall include provisions on the suspension and termination of support under the assistance measure in the event of the beneficiary being found in breach of the obligations set out in paragraph 2.

Implementation

Article 4

Open ↗

1.   The High Representative shall be responsible for ensuring the implementation of this Decision in accordance with Decision (CFSP) 2021/509, and in line with the rules for the implementation of revenue and expenditure financed under the EPF and with the Integrated Methodological Framework for assessing and identifying the required measures and controls for assistance measures under the EPF. 2.   The implementation of the activities referred to in Article 1(3) may be carried out by the following: (a) the Ministry of Defence of the Czech Republic; (b) the Ministry of Defence of Denmark; (c) the Ministry of Defence of France; (d) the Ministry of Defence of Germany; (e) the Ministry of Defence of Italy; (f) the Ministry of Defence or State Centre for Defence Logistics and Procurement of Latvia; (g) the Ministry of Defence of the Netherlands; (h) the Ministry of Defence, Ministry of Internal Affairs and Administration or the Governmental Strategic Reserves Agency of Poland; (i) the Ministry of Defence of Portugal; (j) the Ministry of Defence of Sweden or the Swedish Defence Material Administration.

Support by Member States

Article 5

Open ↗

The Member States shall permit the transit of the military equipment specified in Article 1 of this Decision, including accompanying personnel, through their territories, including their airspace, consistent with Article 56(3) of Decision (CFSP) 2021/509.

Monitoring, control and evaluation

Article 6

Open ↗

1.   The High Representative shall monitor the compliance by the beneficiary with the obligations set out in Article 3. That monitoring shall be used to provide awareness of the context and the risks of breaches of the obligations set out in Article 3, and to contribute to the prevention of such breaches, including violations of international human rights law and international humanitarian law by units of the Armed Forces of Ukraine supported under the assistance measure. 2.   The post-shipment control of equipment shall be organised as follows: (a) delivery verification, whereby EPF delivery certificates are to be signed by the end-user forces upon transfer of ownership; (b) reporting on the inventory, whereby the beneficiary is to report annually on the inventory of designated items until such reporting is no longer deemed necessary by the Political and Security Committee (PSC); (c) on-site visits, whereby the beneficiary is to grant the High Representative and the EPF auditors access to conduct on-site checks and EPF audits, upon request. 3.   The High Representative shall conduct a final evaluation upon completion of the assistance measure to assess whether the assistance measure has contributed to reaching the objectives set out in Article 1(2).

Reporting

Article 7

Open ↗

During the period of implementation, the High Representative shall provide the PSC with six-monthly reports on the implementation of the assistance measure, in accordance with Article 63 of Decision (CFSP) 2021/509. The administrator for assistance measures shall regularly inform the Facility Committee established by Decision (CFSP) 2021/509 on the implementation of revenue and expenditure in accordance with Article 38 of that Decision, including by providing information on the suppliers and subcontractors involved.

Suspension and termination

Article 8

Open ↗

1.   The PSC may decide to suspend wholly or partially the implementation of the assistance measure in accordance with Article 64 of Decision (CFSP) 2021/509. 2.   The PSC may recommend that the Council terminate the assistance measure.

Entry into force

Article 9

Open ↗

This Decision shall enter into force on the date of its adoption.

Other acts of the same type
Commission Decision (EU) 2022/765 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Finland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2285) (Only the Finnish and Swedish texts are authentic) (Text with EEA relevance)Commission Decision (EU) 2022/766 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Ireland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2287) (Only the English and Irish texts are authentic) (Text with EEA relevance)Commission Decision (EU) 2022/767 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Portugal pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2288) (Only the Portuguese text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/768 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Slovakia pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2289) (Only the Slovakian text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/769 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Lithuania pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2290) (Only the Lithuanian text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/770 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Denmark pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2291) (Only the Danish text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/771 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Estonia pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2292) (Only the Estonian text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/772 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by the Czech Republic pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2293) (Only the Czech text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/773 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Italy pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2294) (Only the Italian text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/774 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Austria pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022)2297) (Only the German text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/775 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Hungary pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2298) (Only the Hungarian text is authentic) (Text with EEA relevance)Commission Decision (EU) 2022/776 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Spain pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2300) (Only the Spanish text is authentic) (Text with EEA relevance)
Contents

What to look at next

DATA NOTES

About the data

Sources

This page

The full text of Council Decision (CFSP) 2026/2620 of 20 November 2026 on an… is reproduced on LawPlayer from EUR-Lex, with a separate page for each article.

Sources

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

About

LawPlayer is a privately run legal research website for reading EU legislation article by article, built for lawyers, in-house counsel and students who need to check the legal text quickly.EU law entry